Hello all. I have been planning my oven for a couple years now and finally broke ground this week. I am wondering if I am supposed to let the structural layer cure before pouring the insulating layer? If so, how long? Then how long should the insulating layer cure before bringing the oven? I am in the San Fernando Valley, in Southern California. Days are about 85-90, evenings are around 65+or-.

Thanks in advance.

Chris
Reply With Quote
  #2  
Old 06-17-2011, 04:28 AM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,216
Default Re: Structural layer curing time

Keep your slab damp for a week, then proceed with your build. You can put the insulation on at any time: I placed my insblock19 pieces directly into the wet concrete to avoid any possible leveling problems.
__________________
My geodesic oven project:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
,
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #3  
Old 06-17-2011, 05:54 AM
Tscarborough's Avatar
Il Pizzaiolo
 
Join Date: Oct 2009
Location: Ausitn
Posts: 3,027
Default Re: Structural layer curing time

Normal construction practice is to begin laying structural CMU on 24 hour slabs. The cure time of concrete is logarithmic, that is, it reaches (not real numbers but close) 50% in 24 hours, 70% in 7 days, 90% in 30 days, and 100% in 120 days.

For this application, you can begin work the next day with no problems.
Reply With Quote
  #4  
Old 06-19-2011, 03:29 PM
Neil2's Avatar
Il Pizzaiolo
 
Join Date: Oct 2006
Location: Vancouver Island
Posts: 1,374
Default Re: Structural layer curing time

"I am wondering if I am supposed to let the structural layer cure before pouring the insulating layer?"

You can do the insulation layer the next day if you want. As Dmun notes, it is critical to provide portland based material an uninterrupted supply of water for at least 7 days minimum. Even longer if practical. You can use soaked burlap sacks or old towels or blankets then covered with poly to keep it moist overnight.

Last edited by Neil2; 06-19-2011 at 03:36 PM.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
insulation while curing y8mne Firing Your Oven 5 12-27-2010 03:19 PM
slab curing time? crwdtb Newbie Forum 19 03-19-2010 10:01 PM
Concrete curing time DimTex Pompeii Oven Construction 8 07-28-2009 01:59 PM
Concerned About Rebar in Insulated Layer DaveDQ Newbie Forum 16 04-20-2009 04:11 PM
Cement Curing Conditions rlf5 Getting Started 4 07-18-2007 06:50 AM


All times are GMT -7. The time now is 10:29 PM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC