#1  
Old 10-28-2011, 05:12 PM
Laborer
 
Join Date: Oct 2010
Location: new zealand
Posts: 62
Default curing times????

Hi there all

Can anyone let me know if it is incorrect to base coat stucco on the same day as the day I have finished the outer insulation (vermic and concrete which has just covered the two layers of insulation blanket), I guess after a 12 month build and the fact that I can see the first firing soon I am getting a little excited. there really is a lot to a pompeii oven. Cheers Kris
Reply With Quote
  #2  
Old 10-28-2011, 08:03 PM
Les's Avatar
Les Les is offline
Il Pizzaiolo
 
Join Date: Sep 2005
Location: Carson City, NV
Posts: 2,830
Default Re: curing times????

Kris,

I don't see a problem with that. It might even be better to have everything meld together as it sets.
__________________
Check out my pictures here:

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


If at first you don't succeed... Skydiving isn't for you.
Reply With Quote
  #3  
Old 10-28-2011, 10:32 PM
Laborer
 
Join Date: Oct 2010
Location: new zealand
Posts: 62
Default Re: curing times????

Have just completed my first stucco scratch layer. Do I have to wait until I have completed that final stucco layer before start the firing??????
Attached Thumbnails
curing times????-pa290018.jpg  
Reply With Quote
  #4  
Old 10-29-2011, 05:06 AM
david s's Avatar
Il Pizzaiolo
 
Join Date: Mar 2007
Location: Townsville, Nth Queensland,Australia
Posts: 4,696
Default Re: curing times????

Given the large amount of water in the vermicrete layer, I think it is better to do the drying fires before the stucco. That waybthebwatervcan escape more easily. If you stucco over wet vermicrete you are holding the water in. Remember that one litre of water makes 1000 liters of steam. That steam can easily crack the outer shell as it expands. If there is no outer shell there when you do the drying fires then you can't crack it.
100 litres vermicrete will take about 30 litres water which equals 30,000 litres of steam.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Curing schedule Modular Ovens DocHop Modular Refractory Oven Installation 4 08-10-2011 05:28 AM
I need curing advice Paul in Rockwall TX Pompeii Oven Construction 2 03-15-2011 05:27 PM
insulation while curing y8mne Firing Your Oven 5 12-27-2010 03:19 PM
Thoughts on curing a brick oven from a pretentious newbie :) phippsj Newbie Forum 7 11-18-2010 11:46 AM
Cement Curing Conditions rlf5 Getting Started 4 07-18-2007 06:50 AM


All times are GMT -7. The time now is 12:14 PM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC