| Pizza Ovens | (800) 407-5119 | info@fornobravo.com | U.S. Price List |
![]() |
![]() |
| | LinkBack | Thread Tools | Display Modes |
|
#1
| |||
| |||
| Hello, I built my stand and poured the concrete hearth this past weekend. I covered the wet slab with burlap to keep it moist overnight and in the morning I found some of the portland cement had coated the surface of the concrete, maybe a total of a cup for the entire slab. I assume the burlap helped wick this. The slab seems solid but how do I tell? Also, how long should I let it cure before I start with the insulating layer of portland and perlite? |
|
#2
| ||||
| ||||
| Don't worry about the surface of your concrete slab. Concrete will cure underwater. How do you think they build bridges? As long as it's the right thickness and properly reinforced you are good to go. You can place your vermiculite concrete right away: at one point it was suggested to pour the support slab and the insulating layer one right after another. You should let your concrete cure for a week before proceeding with your floor and dome.
__________________ My geodesic oven project: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. , To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#3
| ||||
| ||||
| I agree. Keep it wet for a week. |
|
#4
| |||
| |||
| You mean letting the portland and perlite mixture wet cure for a week? Thanks |
|
#5
| ||||
| ||||
| I would: it takes a while to solidify into the cork-like consistency you're looking
__________________ My geodesic oven project: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. , To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#6
| |||
| |||
| Quote:
Thanks |
|
#7
| ||||
| ||||
| Quote:
You won't be able to float this mixture, the best you're going to be able to do is pat it flat on top with your trowel.
__________________ My geodesic oven project: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. , To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#8
| |||
| |||
| Quote:
regards from Karl |
|
#9
| |||
| |||
| Thanks for all the answers |
![]() |
| Thread Tools | |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Oven Curing | james | Firing Your Oven | 271 | 01-30-2012 11:02 PM |
| Concrete by the wheelbarrow, mixer, trailer or pump | james | Tools, Tips and Techniques | 58 | 06-22-2011 11:28 AM |
| Concrete mixer basics | dmun | Getting Started | 11 | 06-05-2009 06:48 PM |
| Curing Concrete and Masonry | Xabia Jim | Tools, Tips and Techniques | 21 | 03-31-2008 03:15 PM |
| Time to Cure the concrete. | asudavew | Tools, Tips and Techniques | 12 | 09-19-2007 10:03 PM |