I built my stand and poured the concrete hearth this past weekend. I covered the wet slab with burlap to keep it moist overnight and in the morning I found some of the portland cement had coated the surface of the concrete, maybe a total of a cup for the entire slab. I assume the burlap helped wick this. The slab seems solid but how do I tell? Also, how long should I let it cure before I start with the insulating layer of portland and perlite?
Reply With Quote
  #2  
Old 07-21-2009, 03:40 PM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,216
Default Re: Concrete curing time

Don't worry about the surface of your concrete slab. Concrete will cure underwater. How do you think they build bridges? As long as it's the right thickness and properly reinforced you are good to go. You can place your vermiculite concrete right away: at one point it was suggested to pour the support slab and the insulating layer one right after another. You should let your concrete cure for a week before proceeding with your floor and dome.
__________________
My geodesic oven project:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
,
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #3  
Old 07-21-2009, 07:33 PM
Neil2's Avatar
Il Pizzaiolo
 
Join Date: Oct 2006
Location: Vancouver Island
Posts: 1,374
Default Re: Concrete curing time

I agree. Keep it wet for a week.
Reply With Quote
  #4  
Old 07-22-2009, 09:37 AM
Apprentice
 
Join Date: May 2009
Location: Austin, Texas
Posts: 102
Default Re: Concrete curing time

You mean letting the portland and perlite mixture wet cure for a week? Thanks
Reply With Quote
  #5  
Old 07-22-2009, 10:03 AM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,216
Default Re: Concrete curing time

I would: it takes a while to solidify into the cork-like consistency you're looking
__________________
My geodesic oven project:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
,
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #6  
Old 07-22-2009, 10:24 AM
Apprentice
 
Join Date: May 2009
Location: Austin, Texas
Posts: 102
Default Re: Concrete curing time

Quote:
Originally Posted by dmun View Post
I would: it takes a while to solidify into the cork-like consistency you're looking
Okay, that's good. One more question: The 5 parts Perlite to 1 part Portland Cement, that's by volume correct? Once poured do I just screed the mixture level or should I try and float it flat like the concrete?

Thanks
Reply With Quote
  #7  
Old 07-22-2009, 03:44 PM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,216
Default Re: Concrete curing time

Quote:
The 5 parts Perlite to 1 part Portland Cement, that's by volume correct? Once poured do I just screed the mixture level or should I try and float it flat like the concrete?
Yes, by volume, mix the dry ingredients until fully coated then add water until just wet.

You won't be able to float this mixture, the best you're going to be able to do is pat it flat on top with your trowel.
__________________
My geodesic oven project:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
,
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #8  
Old 07-23-2009, 03:39 AM
Apprentice
 
Join Date: Jul 2008
Location: Norway
Posts: 118
Default Re: Concrete curing time

Quote:
I found some of the portland cement had coated the surface of the concrete
This is typically something you will experience if your concrete is on the wet side. In serious cases it could weaken the concrete due to depletion of cement, but for such small structures and dimensions we are talking about here there is nothing to worry about.

regards from Karl
Reply With Quote
  #9  
Old 07-28-2009, 01:59 PM
Apprentice
 
Join Date: May 2009
Location: Austin, Texas
Posts: 102
Default Re: Concrete curing time

Thanks for all the answers
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Oven Curing james Firing Your Oven 335 07-15-2014 07:12 PM
Concrete by the wheelbarrow, mixer, trailer or pump james Tools, Tips and Techniques 64 05-23-2012 06:40 PM
Concrete mixer basics dmun Getting Started 11 06-05-2009 05:48 PM
Curing Concrete and Masonry Xabia Jim Tools, Tips and Techniques 21 03-31-2008 02:15 PM
Time to Cure the concrete. asudavew Tools, Tips and Techniques 12 09-19-2007 09:03 PM


All times are GMT -7. The time now is 10:22 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC