| Pizza Ovens | (800) 407-5119 | Info@fornobravo.com |
![]() |
| | |||||||
| | LinkBack | Thread Tools | Display Modes |
| ||||
| Up to 4oo degrees now for my incremental curing of the dome. Shown in the first attachment is a unit for building my fires around. Still tinkering with the design a bit. I have brazed a plate at bottom to hold ashes and a few other changes today as well, will post the final version when its done. Second attachment shows the steel suround being built and base for my slate work at front of landing. Third attachment shows the dry fit of slate with its steel suround. The slate will sit up a little higher so its flush with the steel banding perimeter.
__________________ see below for my oven album of progress to date http://picasaweb.google.com/wayneber...PizzaOvenWorld |
| ||||
| Very nice Wayne. Are you getting excited about cooking yet? I smell pizza! Dave
__________________ My thread: http://www.fornobravo.com/forum/f8/d...ress-2476.html My costs: http://spreadsheets.google.com/pub?k...Xr0fvgxuh4s7Hw My pics: http://picasaweb.google.com/dawatsonator |
| Thread Tools | |
| Display Modes | |
| |
| | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| My oven progress | telehort | Pompeii Oven Construction | 18 | 04-01-2008 02:46 AM |
| George's Pompeii progress | gjbingham | Pompeii Oven Construction | 300 | 03-30-2008 11:24 AM |
| NH Progress pictures | Gentcpa | Pompeii Oven Construction | 19 | 11-03-2007 03:58 AM |
| Work in progress | Xabia Jim | Outdoor Kitchen Design | 0 | 03-11-2007 06:51 AM |
| Sharing my progress... | aikitarik | Brick Oven Photos | 38 | 10-14-2005 01:49 PM |