| Pizza Ovens | (800) 407-5119 | info@fornobravo.com | U.S. Price List |
![]() |
|
#1
| |||
| |||
| I am planning on building my vent/oven landing area about 1/4 inch away from my inner arch as a heat break. I plan on shoving some insulation board between the two to top it off. I wonder though, if it will be a fatal move, meaning that later I may wish that they were connected for strength. Can anyone comment on the wisdom or folly in not connecting the two? Tom |
|
#2
| |||
| |||
| I have the same question. Doesn't it make at least some sense to break the connection between the two by an inch or three, and insulate with the same material the rest of the oven is insulated with? |
|
#3
| ||||
| ||||
| I couldn't figure out a practical way to do a structural thermal break, so I just insulated the area extremely well.
__________________ To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#4
| ||||
| ||||
| Why? I don't see the advantage. You would still need to cut the transition bricks to conform the vent to the dome. (even though they won't be touching)Then you would need to add butress bricks to reinforce the sides of the vent to hold the weight of the chimney (or to keep it from shifting to the side and falling down)! I could be wrong but it seems to me like a case of 'If it ain't broke, don't fix it!Best of luck to whatever you decide! Rick
__________________ View my pictures at, Picasaweb.google.com/xharleyguy |
|
#5
| |||
| |||
| The advantage might be that the heat stays where its needed rather than bleeding into the entryway bricks. I wonder if I could build the front just like the back (we're talking barrel vault style here), adding a square opening with the top layers of brick supported by angle iron. Then add the ceramic insulation to the front and build another square, angle iron supported structure for the chimney right up against the insulation. Maybe the draw from the chimney would be less effective with the square opening, but doors would be easier to construct (for me anyway). There would still have to be a connection of supporting bricks along the edges of the opening between the 2 structures, but it could reduce the connection by 80%+ |
|
#6
| ||||
| ||||
| Look at mine, in sig. Other than the floor, all that touches is 3/8"x12" of firebrick.
__________________ To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#7
| |||
| |||
| Naive question: Is the chimney in front of the door? In other words, does the chimney only function when the door is off? |
|
#8
| ||||
| ||||
| Correct, although I plan on making an inner and an outer door.
__________________ To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#9
| ||||
| ||||
| Here is a direct link showing how the smoke chamber is built. I was wrong, there is 32"x3/8" touching, plus the flue itself and and the filler around the flue. The whole area is well insulated, though. Smoke Chamber
__________________ To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#10
| ||||
| ||||
| The idea of thermally isolating your entry is something pretty new, and I'm not convinced of it's utility. For starters you don't want to leave any refractory insulation exposed, particularly in your cooking area. I suppose if you do a lot of retained heat baking it might be worth considering, but the standard design holds heat for a long time. Remember, your entry area gets REALLY hot, not as hot as the dome interior, but there's a lot of heat absorbed there, even with a thermal break.
__________________ My geodesic oven project: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. , To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
![]() |
| Thread Tools | |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Thermal expansion in floor/vent landing design | jschwappach | Getting Started | 4 | 01-16-2008 07:12 PM |
| brick thickness for top of landing arch | waynebergman | Pompeii Oven Construction | 2 | 11-28-2007 09:29 AM |
| Oven Landing | dalucca2003 | Getting Started | 10 | 05-08-2007 07:57 AM |
| Landing temp break? | wlively | Pompeii Oven Construction | 1 | 08-13-2006 04:00 AM |
| Cantiliver the oven landing? | james | Design Styles, Chimneys and Finish | 2 | 03-14-2006 06:10 AM |