#1  
Old 07-23-2009, 04:42 PM
Apprentice
 
Join Date: Jan 2009
Location: saugerties, ny
Posts: 193
Default vermiculite/cement 5:1 question

Sorry if this one is old. I can't find it.
I keep reading about mixing vermiculite or perlite with cement at 5:1. What are we measuring? 5 what to 1 what?
Thanks
Reply With Quote
  #2  
Old 07-23-2009, 05:24 PM
Neil2's Avatar
Il Pizzaiolo
 
Join Date: Oct 2006
Location: Vancouver Island
Posts: 1,374
Default Re: vermiculite/cement 5:1 question

By volume.

For example, five shovel fulls of perlite and one shovel full of cement.

And just enough water to make it "workable".
Reply With Quote
  #3  
Old 07-23-2009, 05:26 PM
Roadkyng's Avatar
Laborer
 
Join Date: Jan 2009
Location: Texas
Posts: 77
Default Re: vermiculite/cement 5:1 question

mixing of materials is always assumed by volume unless otherwise specified, such as by weight
Reply With Quote
  #4  
Old 07-27-2009, 03:50 AM
Apprentice
 
Join Date: Jan 2009
Location: saugerties, ny
Posts: 193
Default Re: vermiculite/cement 5:1 question

so for example if I know it took so many bags of cement to make my structure slab, I can just sort of estimate how many bags it takes to make a slab of a certain size and apply that to the verm/cement mixture? So if I want to replicate the area of the slab, all I have to do is replace some of the cement with the vermiculite for the same total?
Thanks
Kim
Reply With Quote
  #5  
Old 07-27-2009, 09:34 AM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,216
Default Re: vermiculite/cement 5:1 question

For all practical purposes the volume of the vermiculite (say, a four cubic foot bag) will be the volume of your vermiculite concrete. The portland doesn't take up that much room.
__________________
My geodesic oven project:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
,
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #6  
Old 07-27-2009, 10:04 AM
Apprentice
 
Join Date: Jan 2009
Location: saugerties, ny
Posts: 193
Default Re: vermiculite/cement 5:1 question

Thanks. Very helpful. How did we ever get by before the Internet?
Kim
Reply With Quote
  #7  
Old 07-28-2009, 01:55 PM
Apprentice
 
Join Date: May 2009
Location: Austin, Texas
Posts: 102
Default Re: vermiculite/cement 5:1 question

Before the internet I think we ordered out for pizza.

I poured my insulating layer last Friday and found for the 36 inch oven it took all of 3 four cu. ft. bags of Perlite to fill my forms to the 4 inch level.
Reply With Quote
  #8  
Old 07-28-2009, 06:11 PM
Apprentice
 
Join Date: Jan 2009
Location: saugerties, ny
Posts: 193
Default Re: vermiculite/cement 5:1 question

I'm finding it won't take much too. Maybe four or five - tops. And I think $8.75/ 4c.f. bag is probably reasonable.
Thanks
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Oven stand question Salv B Getting Started 4 12-08-2008 04:11 AM
Question on Pizza Oven Found in Warehouse fred.collins Newbie Forum 5 10-20-2008 09:22 AM
Pouring Hearth Question telehort Getting Started 7 01-29-2007 09:20 AM
Question about isolated hearth slab Alan Getting Started 26 07-21-2005 07:00 PM
Construction of Chimney question dmun Design Styles, Chimneys and Finish 0 07-18-2005 08:08 AM