| Pizza Ovens | (800) 407-5119 | info@fornobravo.com | U.S. Price List |
![]() |
![]() |
| | LinkBack | Thread Tools | Display Modes |
|
#1
| |||
| |||
| Ok, have finished my dome and am about to start the entry/vent arch but I just have a few questions first. Any help would be greatly appreciated. I gather from previous posts, that having a vent opening which narrows to half its original size is optimal. I am planning to have my arch opening 18" x 9" which will narrow to an approx. 9" x 9" flue. By my calculations, this gives me the correct ratio. (please, feel free to correct me). The vent dimensions are pretty much the entire opening x the length of one brick. I see most ovens only have a vent depth of about half a brick. Is a 9" vent depth too much and will it affect the ability to draw well, or is the reason most people only use half a brick depth purely for space considerations? My last question has to do with the height that this transition happens over. I am planning my vent height to be approx. 7" or 8", then chimney on top. Is this vent too short, or as long it narrows by half then the height isnt realy a question. Thanks for any help. |
|
#2
| |||
| |||
| My oven opening is almost exactly the same size as yours (same width,slightly lower). I have used an opening with half-brick debth (4") spanning the whole width of the opening (18"). The flue channel is made by a thin (1") brick(one each side), fitting into the opening debth and inclined to leave a 13" wide(still 4" deep) opening at the top. From there on I have mounted a steel transition pipe going from the rectangular opening to a round flue pipe. The steel transition pice is formed with the same contraction as the side bricks mentioned. The opening works fine when hot. During the first 10-15 min. of firing I need to cover the upper part of the opening to "guide" the smoke. I start firing as close to the opening as possible to assure that the flue channel is quickly heated. I think the gradual contraction (with enough "space" inside) and the fast heating of the steel part (and in fact the complete steel chimney) helps a lot. From the smoke pattern I see it also seems important to catch smoke from the whole width of the oven opening. karl |
|
#3
| ||||
| ||||
| The length of the transition piece is a factor in good exhaust flow. This change in area is increasing the velocity of the exhaust gas and in turn reducing the pressure of the upper vent. If my memory serves I believe the optimum angle is approx 30 degrees. Given our spaces to work with go with the longest transition you can if you can't get 30.
__________________ Wade Lively |
|
#4
| |||
| |||
| Thanks guys. My vent transitions at about 35 degrees so I think that thats ok. As for my vent depth, is a full brick length too much? my entire arch is going to be 1 1/2 brick lengths deep, so 1 brick length for the vent, and 1/2 in front for the entry. Is this too much vent area and too little entry area? |
|
#5
| |||
| |||
| My intuition tells me that 1 brick debth is more than enough. But my experience tells me that I would spend some of that debth to make sure that I cover the whole width of the opening arch. regards from Karl |
|
#6
| |||
| |||
| the way you have done the arch/vent with a 1/2 brick and one full brick seem to be fairly standard |
|
#7
| ||||
| ||||
| The width of mine is 6-7 inches. I got there from the inside opening of the flue pipe. It draws very well. If I have any issues it's with the cover, until everything is pure gas it tends to throw the smoke down and out. Les...
__________________ Check out my pictures here: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. "Hell, there are no rules here - we're trying to accomplish something" - Thomas A. Edison |
|
#8
| ||||
| ||||
| I just measured my opening and it is 9.5" x 15.15". I just formed it and have yet to complete the dome so I don't know how it will draw but this is just to let you know you have company in your vent opening size. I'll be putting on anchor plate for the 8" round flue pipe. I betting on good draw. Cheers, Dino
__________________ "Life is a banquet and most poor sons-of-bitches are starving to death." -Auntie Mame View My Picasa Web Album UPDATED oct To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. My Oven Costs Spreadsheet To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. My Oven Thread To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#9
| |||
| |||
| Dino, the fact that I'm not the only one with such "massive" vent dimensions does help. I'm going to move forward, only maybe amending the depth by about 1/4", more for structural reasons, to help support the flue transition above it. Thanks for letting me know. |
|
#10
| |||
| |||
| Has anybody established a sound ratio for flue opening/chimney size to the internal volume of the oven. I know from the kiln fraternity this is a constant dilemma and debate |
![]() |
| Thread Tools | |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| vent design in this picture | chale | Design Styles, Chimneys and Finish | 2 | 08-17-2010 10:24 AM |
| vent size for a 36" internal tuscan? | waynebergman | Pompeii Oven Construction | 4 | 12-07-2007 01:29 PM |
| (Another) Vent Question | sarah h | Pompeii Oven Construction | 2 | 10-24-2007 07:14 PM |
| Help with vent landing size | gjbingham | Pompeii Oven Construction | 3 | 10-22-2007 09:18 AM |
| Vent design | james | Pompeii Oven Construction | 1 | 02-21-2007 06:23 AM |