| Pizza Ovens | (800) 407-5119 | info@fornobravo.com | U.S. Price List |
![]() |
|
#1
| |||
| |||
| Hello, I was wondering what the average cost of building this oven in the U.S. is? How long does it take the average weekend warrior? I live in the northern part of the midwest; what exterior product should be used to prevent freeze cracking? Is it a bad idea to fire this type of oven when it is below freezing? I love the idea of building and using this oven. I just want to make sure its something that will last in the environment I live in. |
|
#2
| |||
| |||
| jl... i have the better part of a bag of fireclay, hydrated lime and portland cement that you can have. i only have about a half a dozen excess firebrick. i am also working on my material list for my 36" build, and will post that as soon as it is completed.. i'll add the prices that i paid. there are some pretty good sources for materials in GR, Spruit Brothers, Industrial Firebrick (ceramic insulation), Belden Brick, Behler-Young (SS chimney). i have a warehouse in Holland, and can get my excess materials to that location if it helps. i took a little over a year to build mine, but i took the entire summer off. i think that if i had kept at it i could have done it in 90 days.. nites and weekends |
|
#3
| ||||
| ||||
| Quote:
Quote:
Quote:
__________________ My geodesic oven project: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. , To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#4
| |||
| |||
| mine is stucco. i have yet to do my counter top and am nervous about the joint between the base and dome especially when we start to get to the freeze/thaw cycles this winter. i have some very high tech water cure caulk around the chimney, but i plan on watching it very closely... if i dont like the looks of things next srping or summer, i will probably build an enclosure and just fill it with vermiculite... wont be that big of a project.... and being a roofing and exterior building products distributor i have some pretty cool stuff to enclose it with |
|
#5
| ||||
| ||||
| I used mostly new materials excluding my base because the location is temporary. I have not done a true tally of costs but I have at least 3K into it. Keep in mind that my oven was built for bread and has a large thermal mass. And I went high end on materials. I could not be accurate about time it was a work I did on weekends but not every weekend so three months was to a usable oven. It's now covered with a tarp for the winter so come spring I will work on the housing and such. Hope that helps |
|
#6
| ||||
| ||||
| Quote:
|
|
#7
| ||||
| ||||
| "when we start to get to the freeze/thaw cycles this winter." A freeze/thaw cycle needs water to do damage. If your design is such that water is drained away (for example if you have your suspended slab slightly sloped outward ) you won't have a problem. Last edited by Neil2; 01-05-2011 at 02:21 PM. |
|
#8
| |||
| |||
| my slab is dead flat. i have some slate that i think i'm going to use to finish it, and i plan to set it like floor tile and slightly slope it away from the dome... but i need to wait till spring. 25 degrees and snow here today... |
|
#9
| ||||
| ||||
| The cost is going to depend on how much help you need during the process and the availability (pricing) of materials in your localle. You can see below that, since November 2010, I have added a piece of sidewalk, poured a slab for the oven stand, set blocks for a base and poured the oven hearth and a wing table. Cost of what you see is about (whispering so my wife doesn't hear) $1100. Fortunately, I have used this mason and carpenter before and I think I got a lot for the money. That said, I elected to get some help with hauling the aggregate and mixing the concrete, pouring the slab, laying the block, pouring the sidewalk, and, forming and pouring the hearth and wing table....$770 in labor to get it where you see it now. (It could cost you two or three times that much in some areas). Of course, I was there all the time, pointing and working. ![]() I bought some used firebrick $350, some ingredients for the home brew mortar, and refractories casting material for the flue edifice; and some rigid insulation for the oven floor $160. Will need more materials soon, but it is downhill from here. ![]() I'm hoping to get it all done in a target range of (whispering so my wife doesn't hear) $2,250-2,750 including an insulated enclosure and roof for the dome. Just one man's reality, a data point, your reality will be different. HTH ![]() Does anybody have an indespensible/Hendo tool to loan/rent/sell to me? Last edited by Lburou; 01-07-2011 at 08:32 AM. Reason: fuzzy math |
![]() |
| Thread Tools | |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Modular ovens and thermal mass | ikhan42 | Newbie Forum | 15 | 11-29-2009 07:25 AM |
| Gas-fired ovens for pizzeria | skankinage | Commercial Pizza Ovens | 10 | 08-22-2008 01:00 PM |
| Twin ovens | Xabia Jim | Commercial Pizza Ovens | 5 | 09-08-2007 09:23 PM |
| Article that mentions FB | mgraban | Chit Chat | 1 | 08-07-2007 07:29 AM |
| Photos and woodblock prints of old ovens | Yahoo-Archive | Getting Started | 0 | 03-21-2005 05:25 AM |