#1  
Old 12-31-2009, 08:56 PM
Peasant
 
Join Date: Feb 2008
Location: Canberra, ACT
Posts: 27
Default Paul's Canberra build

Hello, my name is Paul, and I'm a pizza oven addict ... (chorus: hello Paul).

I don't remember exactly when or how my addiction began. I discovered the forno bravo forum several years ago and have been lurking in the background ever since, mostly satisfying my cravings by following (with more than a little envy) the exploits of the many master builders who have contributed so much to this forum.

I am happy to say, however, that I have not been entirely idle during this period. My own pizza oven has gone through a whole bunch of planning stages - decide on a style and location, ... hmm ain't gonna fit there - rethink the design ... oven too small - move it up the back, ... storm water drain!!! who puts a storm water drain in the perfect spot to build an oven?? Damn you local council.

Then there's the materials. Australia is a big place, and it's pretty well spread out. Whilst I live in the Nation's capital, Canberra is really just a country city of around 300,000 people, mostly public servants, defence personnel and their families. Even with the surrounding towns and cities, there just isn't the population to support a brickworks willing to produce the all essential fire bricks needed to build a pompeii oven. The refractory suppliers are all located closer to the larger population centres - 5-6hrs drive to Sydney/Newcastle or Melbourne, or further afield in Brisbane and Perth/Fremantle. At around 4kg a brick, and needing 120 or so for the oven I want, freight on top of the purchase price was going to add up.

So, even after I decided on a final plan ... err or several 'final' plans, the issue of getting materials always raised it's ugly head. Then came the breakthrough.

Trawling through some local classified ads one day, I came across a bunch of ex-kiln firebricks for sale, just half an hour's drive down the road from my place. With trailer on, I grabbed 200 bricks for just $1.50 a piece. Most have rounded edges, some worse than others, but I should have enough flatish, even, sharpish-edged bricks to form the cooking floor.

With 200 firebricks piled in the backyard, there could be no more excuses.

But before I begin describing my build (which I expect will continue to be a slow process), I would like to express my thanks to all those who have contributed to my enthusiasm for this project and enabling my 'addiction'. I look forward to sharing my learning and will no doubt seek assistance when I get stuck. This should be fun, so let's get on with the journey ...
Reply With Quote
  #2  
Old 12-31-2009, 09:05 PM
Peasant
 
Join Date: Feb 2008
Location: Canberra, ACT
Posts: 27
Default Re: Paul's Canberra build

Here's a photo of my babies ...
Attached Thumbnails
Paul's Canberra build-big-pile-second-hand-firebricks.jpg  
Reply With Quote
  #3  
Old 12-31-2009, 09:34 PM
Peasant
 
Join Date: Feb 2008
Location: Canberra, ACT
Posts: 27
Default Re: Paul's Canberra build

So anyway, big pile of bricks, no more excuses.

This build will be a part of a wider backyard redesign. We got sick of weeding the sparse lawn that we couldn't keep in good condition due to water restrictions. So out goes the grass, in go some raised beds and a series of paths.

After quite a bit of digging, I built some formwork and bought some reinforcing mesh. This I cut up and turned into a shaped box type arrangement. The slab was 15cm (6 inch) thick and the box shape means there is metal about one inch from the bottom and going up to about one inch from the surface. We've decided on a corner type slab with a bench to the left.

Unfortunately, we have fairly restricted access into the backyard, so couldn't be certain we'd get a mixer in to do the heavy work. Instead we opted for the handraulic method, using a plastic shell pool, bucket, hoe and shovel. In hindsight, I DO NOT recommend trying this. The wife and I started at around 7 one morning with the intention of getting it done before the day got too hot. Eleven 20kg bags of cement, mixed one at a time with four times the sand/gravel volume, by hand. It took much longer than I expected because I found I had to mix the dry ingredients thoroughly before adding water, then mixing all over again. Very heavy work. We finished a little after 1pm as the temperature rose to around 35 Celsius, a little sunburnt, quite a bit dehydrated (despite our best efforts), and also somewhat lime-burnt around the fore-arms. It really didn't take much exposure to my lily-white, office-worker arms to make the skin red raw. Will most certainly be trying a little harder to get a mixer into the backyard for the next concreting stages.

Some progress photos attached. Yes, you can see how long it has been between stages by the height of the corn plants.
Attached Thumbnails
Paul's Canberra build-bare-backyard.jpg   Paul's Canberra build-beds-first-lot-gravel-laid.jpg   Paul's Canberra build-formwork-place.jpg   Paul's Canberra build-stuff-ready-go.jpg   Paul's Canberra build-first-batch-hole.jpg  

Reply With Quote
  #4  
Old 12-31-2009, 09:42 PM
Peasant
 
Join Date: Feb 2008
Location: Canberra, ACT
Posts: 27
Default Re: Paul's Canberra build

... and some more photos ...

The mesh box went in once I got the hole about half filled. Then I pushed it down, levelled it and covered it over. The finished slab ain't real pretty. We were too wrecked from mixing to do much smoothing. Just made sure it was flat and level and didn't have too many holes in it. I figure I will just cover over the the shoddy work with a bit of render once the oven is done.
Attached Thumbnails
Paul's Canberra build-filling-bucket.jpg   Paul's Canberra build-half-way-mesh-.jpg   Paul's Canberra build-me-mesh.jpg   Paul's Canberra build-but-then-i-saw-bags-cement.jpg   Paul's Canberra build-finished-slab.jpg  

Reply With Quote
  #5  
Old 12-31-2009, 09:51 PM
Serf
 
Join Date: Dec 2009
Location: australia melbourne
Posts: 20
Default Re: Paul's Canberra build

Great work Mahootna i will be following your progress i to am new here and doing some research on diy wfo . I am amazed how many aussie's on this forum ohohoh :-)
Reply With Quote
  #6  
Old 12-31-2009, 10:56 PM
david s's Avatar
Il Pizzaiolo
 
Join Date: Mar 2007
Location: Townsville, Nth Queensland,Australia
Posts: 4,511
Default Re: Paul's Canberra build

Paul,
Have you checked with your local council? Ours require 1.5m inside any boundary fence. By the look of your pics it seems pretty close to your neighbour's fence.
Reply With Quote
  #7  
Old 01-02-2010, 05:48 AM
DaveW's Avatar
Apprentice
 
Join Date: Oct 2009
Location: Virginia
Posts: 200
Default Re: Paul's Canberra build

Quote:
Originally Posted by Mahootna View Post
... and some more photos ...

We were too wrecked from mixing. . .
Judging from the looks of your helper in the "Filling the bucket" photo, I'd say more than a little dehydrated.

Looks great.
Dave
__________________
Album:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #8  
Old 01-02-2010, 04:23 PM
nissanneill's Avatar
Il Pizzaiolo
 
Join Date: Apr 2007
Location: Adelaide, South Australia
Posts: 1,844
Thumbs up Re: Paul's Canberra build

Hi Paul,
great to see another Aussie getting into it.
Take it easy especially in this hot dry weather that we are having and likely to get again next week.
Don't knock yourself about other wise you might not get it finished. and end up like your mate.
Quote:
Judging from the looks of your helper in the "Filling the bucket" photo, I'd say more than a little dehydrated.
There is always numerous ways to do and get a job done. Always elect for the smart way rather than the hard way!

Quote:
... storm water drain!!! who puts a storm water drain in the perfect spot to build an oven?? Damn you local council.
Today, (I'm not sure about Canberra Council) but over here you can build over an easement however, should they have to get to it for changes, then it is at your expense, but how often do they come in and dig it up. Make it so that it can be moved with the right equipment and the contractors certainly have access to that. Also, the materials that they use in the easements are much better and have processes that reduce the maintenance that once used to plague the home owner.
Don't necessarily change your plans from your 'ideal setup' for something 'alternative' just because of the circumstances, work with and around them.
Happy building.

Neill
__________________
Prevention is better than cure, - do it right the first time!

The more I learn, the more I realise how little I know


Neillís Pompeiii #1

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Neillís kitchen underway

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #9  
Old 07-17-2011, 03:26 AM
brung99's Avatar
Laborer
 
Join Date: Apr 2010
Location: Sydney, Australia
Posts: 80
Smile Re: Paul's Canberra build

Hi Paul,

We haven't had any progress updates from you in a while. I was wondering how your build is going and would love to see some photo's.

Regards,

Bruno.
Reply With Quote
  #10  
Old 07-18-2011, 02:26 AM
Peasant
 
Join Date: Feb 2008
Location: Canberra, ACT
Posts: 27
Default Re: Paul's Canberra build

Ok, I shall post some more photos over the next couple of days. Been a tad busy lately. The reason(s) should come clear as you read on.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Oven Build In Central Alabama MetalHead Pompeii Oven Construction 80 08-06-2012 06:04 PM
Wanting to build a wood fire oven the best way we can Wheels1974 Getting Started 9 05-19-2010 07:53 AM
Matt's WFO Build mluttropp Pompeii Oven Construction 74 11-22-2009 03:27 PM
Near completion, Pompeii build Jed Brick Oven Photos 5 05-28-2008 09:48 PM
Considering build of Pompeii oven jet Pompeii Oven Construction 21 05-10-2008 12:14 AM