| Pizza Ovens | (800) 407-5119 | info@fornobravo.com | U.S. Price List |
![]() |
![]() |
| | LinkBack | Thread Tools | Display Modes |
|
#1
| |||
| |||
| Hello, my name is Paul, and I'm a pizza oven addict ... (chorus: hello Paul). I don't remember exactly when or how my addiction began. I discovered the forno bravo forum several years ago and have been lurking in the background ever since, mostly satisfying my cravings by following (with more than a little envy) the exploits of the many master builders who have contributed so much to this forum. I am happy to say, however, that I have not been entirely idle during this period. My own pizza oven has gone through a whole bunch of planning stages - decide on a style and location, ... hmm ain't gonna fit there - rethink the design ... oven too small - move it up the back, ... storm water drain!!! who puts a storm water drain in the perfect spot to build an oven?? Damn you local council. Then there's the materials. Australia is a big place, and it's pretty well spread out. Whilst I live in the Nation's capital, Canberra is really just a country city of around 300,000 people, mostly public servants, defence personnel and their families. Even with the surrounding towns and cities, there just isn't the population to support a brickworks willing to produce the all essential fire bricks needed to build a pompeii oven. The refractory suppliers are all located closer to the larger population centres - 5-6hrs drive to Sydney/Newcastle or Melbourne, or further afield in Brisbane and Perth/Fremantle. At around 4kg a brick, and needing 120 or so for the oven I want, freight on top of the purchase price was going to add up. So, even after I decided on a final plan ... err or several 'final' plans, the issue of getting materials always raised it's ugly head. Then came the breakthrough. Trawling through some local classified ads one day, I came across a bunch of ex-kiln firebricks for sale, just half an hour's drive down the road from my place. With trailer on, I grabbed 200 bricks for just $1.50 a piece. Most have rounded edges, some worse than others, but I should have enough flatish, even, sharpish-edged bricks to form the cooking floor. With 200 firebricks piled in the backyard, there could be no more excuses. But before I begin describing my build (which I expect will continue to be a slow process), I would like to express my thanks to all those who have contributed to my enthusiasm for this project and enabling my 'addiction'. I look forward to sharing my learning and will no doubt seek assistance when I get stuck. This should be fun, so let's get on with the journey ... |
|
#2
| |||
| |||
| Here's a photo of my babies ... |
|
#3
| |||
| |||
| So anyway, big pile of bricks, no more excuses. This build will be a part of a wider backyard redesign. We got sick of weeding the sparse lawn that we couldn't keep in good condition due to water restrictions. So out goes the grass, in go some raised beds and a series of paths. After quite a bit of digging, I built some formwork and bought some reinforcing mesh. This I cut up and turned into a shaped box type arrangement. The slab was 15cm (6 inch) thick and the box shape means there is metal about one inch from the bottom and going up to about one inch from the surface. We've decided on a corner type slab with a bench to the left. Unfortunately, we have fairly restricted access into the backyard, so couldn't be certain we'd get a mixer in to do the heavy work. Instead we opted for the handraulic method, using a plastic shell pool, bucket, hoe and shovel. In hindsight, I DO NOT recommend trying this. The wife and I started at around 7 one morning with the intention of getting it done before the day got too hot. Eleven 20kg bags of cement, mixed one at a time with four times the sand/gravel volume, by hand. It took much longer than I expected because I found I had to mix the dry ingredients thoroughly before adding water, then mixing all over again. Very heavy work. We finished a little after 1pm as the temperature rose to around 35 Celsius, a little sunburnt, quite a bit dehydrated (despite our best efforts), and also somewhat lime-burnt around the fore-arms. It really didn't take much exposure to my lily-white, office-worker arms to make the skin red raw. Will most certainly be trying a little harder to get a mixer into the backyard for the next concreting stages. Some progress photos attached. Yes, you can see how long it has been between stages by the height of the corn plants. |
|
#4
| |||
| |||
| ... and some more photos ... The mesh box went in once I got the hole about half filled. Then I pushed it down, levelled it and covered it over. The finished slab ain't real pretty. We were too wrecked from mixing to do much smoothing. Just made sure it was flat and level and didn't have too many holes in it. I figure I will just cover over the the shoddy work with a bit of render once the oven is done. |
|
#5
| |||
| |||
| Great work Mahootna i will be following your progress i to am new here and doing some research on diy wfo . I am amazed how many aussie's on this forum ohohoh :-) |
|
#6
| ||||
| ||||
| Paul, Have you checked with your local council? Ours require 1.5m inside any boundary fence. By the look of your pics it seems pretty close to your neighbour's fence. |
|
#7
| ||||
| ||||
| Quote:
Looks great. Dave
__________________ Album: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#8
| ||||
| ||||
| Hi Paul, great to see another Aussie getting into it. Take it easy especially in this hot dry weather that we are having and likely to get again next week. Don't knock yourself about other wise you might not get it finished. and end up like your mate. Quote:
Quote:
Don't necessarily change your plans from your 'ideal setup' for something 'alternative' just because of the circumstances, work with and around them. Happy building. Neill
__________________ Prevention is better than cure, - do it right the first time! The more I learn, the more I realise how little I know Neill’s Pompeiii #1 To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. Neill’s kitchen underway To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#9
| |||
| |||
| Hi Paul, We haven't had any progress updates from you in a while. I was wondering how your build is going and would love to see some photo's. Regards, Bruno. |
|
#10
| |||
| |||
| Ok, I shall post some more photos over the next couple of days. Been a tad busy lately. The reason(s) should come clear as you read on. |
![]() |
| Thread Tools | |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Oven Build In Central Alabama | MetalHead | Pompeii Oven Construction | 74 | 08-03-2011 08:16 PM |
| Wanting to build a wood fire oven the best way we can | Wheels1974 | Getting Started | 9 | 05-19-2010 08:53 AM |
| Matt's WFO Build | mluttropp | Pompeii Oven Construction | 74 | 11-22-2009 04:27 PM |
| Near completion, Pompeii build | Jed | Brick Oven Photos | 5 | 05-28-2008 10:48 PM |
| Considering build of Pompeii oven | jet | Pompeii Oven Construction | 21 | 05-10-2008 01:14 AM |