#1  
Old 03-10-2011, 09:38 PM
Serf
 
Join Date: Mar 2011
Location: Arizona
Posts: 4
Default Insulating Concrete Hearth

Does anyone know how long you need to let the perlite/portland cement mix for the insulating hearth set up before starting to build the oven on top of it?
Reply With Quote
  #2  
Old 03-10-2011, 10:34 PM
Il Pizzaiolo
 
Join Date: Jan 2007
Location: Tampa, FL
Posts: 1,446
Default Re: Insulating Concrete Hearth

I waited 1 week. It takes at least 4-5 days before it feels like it can handle the weight and abuse of climbing around on it to build the dome.

RT
Reply With Quote
  #3  
Old 03-11-2011, 04:32 AM
Serf
 
Join Date: Mar 2011
Location: Arizona
Posts: 4
Default Re: Insulating Concrete Hearth

Thanks for the info. I'm building the form for the hearth this afternoon after work, going to make the pour tomorrow, then I have next week off. I'm hoping to get a lot done!
Reply With Quote
Reply

Tags
hearth, insulating hearth

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Insulating Hearth Question Double Trouble Pompeii Oven Construction 4 08-23-2010 04:31 AM
FB insulating board AND insulating concrete? Wineguy Pompeii Oven Construction 1 10-25-2009 11:44 AM
Alternatives to concrete hearth kebwi Pompeii Oven Construction 9 09-02-2009 08:58 PM
concrete blocks on top of vermiculite/concrete hearth project1 Getting Started 10 07-31-2008 05:19 AM
insulating hearth pour waynebergman Getting Started 2 09-06-2007 03:56 PM


All times are GMT -7. The time now is 09:21 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC