Pizza Ovens | (800) 407-5119 | info@fornobravo.com | U.S. Price List
logo

start shopping button

Home
About Us
Forum
Contact Us
Store
Tech Specs
Dealers
Photos
Recipes
Video

Go Back   Forno Bravo Forum: The Wood-Fired Oven Community > Pizza Oven Design and Installation > Pompeii Oven Construction

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 03-18-2009, 04:11 PM
Serf
 
Join Date: May 2008
Location: Central California
Posts: 12
Default Can you do 2 or more chains a day?

Hi guys. Sorry I haven't checked in until now. I am building 42" Pompeii and have started the dome today doing first course. Am curious if I can do more than one chain per day. I have good help for about another week so would like to get this dome done with help ASAP without compromising the integrity of the build. I am using the mix on page 67 with cement, lime, fireclay, and sand.

Thank you ahead of time. You guys are great. I am copying like mad from all the great posts and pictures on this site.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiTweet this Post!
Reply With Quote
  #2  
Old 03-18-2009, 04:17 PM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,213
Default Re: Can you do 2 or more chains a day?

The homebrew mortar will do fine for the lower courses, where the chains are self supporting. Once you get up above the 45 degree angle, you'll probably want to go slower and use support.
__________________
My geodesic oven project:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
,
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiTweet this Post!
Reply With Quote
  #3  
Old 03-18-2009, 08:00 PM
Journeyman
 
Join Date: Mar 2008
Location: Gilbert, AZ
Posts: 355
Default Re: Can you do 2 or more chains a day?

I managed to do two chains each day, but more would have really been pushing it. At my skill level, I needed the mortar to dry nicely enough so that the next course would have something solid to build on. I used sticks and such as support, pretty minimal but absolutely needed. Perhaps if you had a more rigorous support system you could do more courses in a day. Never tried it myself, but it seems logical.
__________________
Nikki
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiTweet this Post!
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -7. The time now is 03:15 PM.

Home | About Us | Our Factory | Dealers | Press and News | Contact Us | FAQ | Forno Bravo UK
Residential Pizza Ovens | Commercial Pizza Ovens | Catering Pizza Ovens | Pizza Oven Accessories | Pizza Peels | Outdoor Fireplaces
Select | Justify | Order | Install | Manage | Make Pizza | Roast, Bake and Grill
Pompeii Brick Oven | Firenze Concept Oven | Links | Cookbooks | Vera Pizza Napoletana | Pizza Oven Photos
Commercial Pizza Oven Selector | Outdoor Kitchen Design | Site Map | Forum

© 2006 Forno Bravo, LLC Italian Pizza Ovens

No part of this website or content thereof may be reproduced, distributed or transmitted in any form or by any means, nor may any part of this website be stored in a database or other electronic retrieval system, or any other website, without the prior written permission of Forno Bravo, LLC.


Powered by vBulletin® Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.5.2
© 2006/10 Forno Bravo, LLC