what would happen if you formed a 1" to 2" high triangular ridge on the hearth support slab, shaped so the edge closest to the oven is verticle and it slopes outward, this ridge would be 6" outside of the outer edge of the wall forming a circle and will be used later on to reinforce the first row of soldier bricks.

Then insulate the hearth 2+ inches trimming the floor and insulation to the same circle. Then form and place a 1" thick x 4" ring of vermicrete to insulate your wall bricks. Place your first wall row on top of (outside and against the top 1" of the hearth bricks) of the vermicrete ring. Set your first row of soldier bricks. Now place vermicrete beveled between the top edge of the first soldier course and your circular ridge, since vermicrete is strong in compression and allows for a little flex would this support the walls of a low dome oven without causing stress cracks?

The dome could still be insulated conventionally the hearth support slab would have to be a little larger, you could use the same base support and the foundation slab would be a little larger.
Reply With Quote
  #2  
Old 11-14-2008, 02:42 AM
Laborer
 
Join Date: Nov 2008
Location: Australia
Posts: 55
Default Re: bracing low dome ovens

i lost you at "if you formed a 1" to 2" high triangular ridge". can you show it in a diagram?
Reply With Quote
  #3  
Old 11-15-2008, 08:11 PM
Serf
 
Join Date: Nov 2008
Location: Kingwood tx
Posts: 14
Default Re: bracing low dome ovens

Justin

Here are two poor pictures the first shows a cross section through the hearth with a small ridge formed to the right and vermicrete angled from the dome down to that ridge, triangle ridge shown but square or rectangle would also serve to leave something for vermicrete to purchase to.

The second is a top view. The center circle is the dome then the next circle is the vermcrete reinforcement and the next ring is the ridge formed in the top of the hearth for the vermicrete to but up against.

If these photos are not clear enough I can get a better camera and try again next week. I'm kind of high tech chalenged.

Doug
Attached Thumbnails
bracing low dome ovens-side-view.jpg   bracing low dome ovens-top-view.jpg  
Reply With Quote
  #4  
Old 11-15-2008, 08:44 PM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,216
Default Re: bracing low dome ovens

Here's a thought: Insulation board is very strong in compression. What if you built your buttressing as a ring around the dome, bracing it against the exterior masonry enclosure? Not the cheapest solution since the board isn't cheap, nor does everyone do structural masonry at or above slab level. It would be well insulated, and insulation board is easier to cut than masonry.
__________________
My geodesic oven project:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
,
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #5  
Old 11-15-2008, 10:43 PM
Master Builder
 
Join Date: Mar 2008
Location: Washington State USA
Posts: 778
Default Re: bracing low dome ovens

I think I understand what you're trying to do. Buttress the dome. On a dome the force vectors push outward and downward at the base and the shallower the dome the more outward the vectors. Historically large domes were/are supported by means of a large chain which runs the circumference at the base. That won't work because of the break, the opening entrance. Large domes of course being complete circles at their base. The low dome ovens I've seen pictures of all seem to be made in massive structures rather unlike the free standing dome self supporting dome of the Pompei Oven. The massive structures supplying/being the buttress.

I think what you describing would work although some mechanical connection of the buttress to the support might be desireable rather than just relying upon the ridge to hold the vermicrete. Maybe large bolts. Also you might consider segmenting the buttress so that differential expansion would not be a problem. Cathedrals used thinner buttresses (later these butresses became arches and became the "flying buttresses" we all know) so there is less of a need for the buttresses to be one continuous member all around the dome. Maybe something in the way of radial wedges, each with their own bolt.

Unless you were going for a low dome look (as opposed to hiding the dome in a gabled structure) I would think it might be easier to cast a concrete retaining wall (where your planned ridge would be) and build the dome over a form and fill the space between the dome and the retaining wall with vermicrete. This is sort of a play on what dmun is suggesting.
Hope this is some help,
Wiley
Reply With Quote
  #6  
Old 11-19-2008, 02:41 AM
Laborer
 
Join Date: Nov 2008
Location: Australia
Posts: 55
Default Re: bracing low dome ovens

The photos are too small
__________________
Justin
My 40" Oven progress
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Steel Dome Oven Wiley Other Oven Types 195 01-15-2014 12:06 AM
Igloo style dome insulation Throw Deep Pompeii Oven Construction 19 12-18-2009 03:40 PM
Exterior Dome Construction Bandrasco Pompeii Oven Construction 19 10-26-2008 07:26 AM
A Potential New Low Dome Design james Pompeii Oven Construction 17 08-14-2008 01:44 PM
Article that mentions FB mgraban Chit Chat 1 08-07-2007 08:29 AM


All times are GMT -7. The time now is 01:38 PM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC