Default Apagios's 42" Pompeii

Hello Everyone!

I must confess, I finished up my oven just before Thanksgiving last winter, and was a bit lazy about uploading my build. I intended to have a build thread along the way, but time just got away from me. To be honest, between my real job and working on the oven I had very little free time, so I am afraid my "build thread" turned out to be a "it's done" thread.

I broke ground on July 1st, and laid the final brick on November 12th of 2011. My Dad was extremely helpful, he volunteered 75 hours of his time to help with big days like foundation and hearth pours. I am an aerospace engineer by trade, so out of a nerdy fascination I kept a log of man hours and raw materials. All told my oven was completed in 375 hours of work, and consumed 12,200 lbs of raw materials! 10,000 lbs of those materials were brought home with my little Ford Focus SVT hatchback; towing 1,000 lbs at a time on a 4x8' flatbed trailer!

So I thought I'd post up a link to my Picasa album of my construction. I printed out these pics and made a small photo album for friends to look through while we cook pizza! It's a great way to share the story of it's construction with friends. Also hopefully it can contribute some to a future oven builder, and if anyone has questions, feel free to PM me, I'll be happy to share my lessons learned!

I also wanted to convey my sincere thanks to James for providing such a wealth of information and supporting this forum. And also to everyone on this forum from which I got so much good info and advice!

I had wanted a wood fired brick oven for a long time, and always just presumed it was out of my price range to contract a builder, and not "do-able" as a first masonry project! I gained the knowledge and confidence I needed to do this project from Jame's ebooks and this forum! So thank you so much James!

Often I find it is very rare for a project to be completed and end up looking like what you had in mind. So often in the course of any project, issues arise and plans change. I am extremely proud to say my oven has been the exception to this rule! The picture below is how it sits now and is identical to what I envisioned back in May-June of 2011 when I found this site and began to seriously plan my project!

Here are just a couple highlights from my album. I am really proud of the octagonal prism keystone! I budgeted myself 2 hours to get that cut, figuring it would take lots of trial and error to get it right. Turns out it took less then 10 minutes to cut and it fit perfect the first time! I could not believe it! It was a perfect finish to the dome construction!

My Picasa Album

Blue Skies,
Dave







rlmcam20 likes this.
Reply With Quote
  #2  
Old 03-28-2012, 02:44 PM
Peasant
 
Join Date: Jun 2011
Location: Bowie, MD
Posts: 26
Default Re: Apagios's 42" Pompeii

Also, you can see in the first picture I have 2 bricks cut to fit the arch.

The story behind this is that for my first pizza fire I had trouble getting the oven temp up past 675-700 *F. After some thought I realized that because I used a basic arch opening with a 13" radius (I wanted to be able to get a turkey in there!) resulted in a 26" wide opening at the bottom.

The hot air exiting through the top of the arch to the vent/chimney will simply flow faster to adjust for the rate of air coming in through the base of the arch. I remembered my basic differential equations from college, Rate in = Rate out.

Rate Out is governed by the cold air in plus energy & mass added from combustion of wood, but the hot exhaust gasses were energized and would simply flow faster to match whatever my rate of cold air in was!

So basically my rate of exhaust gasses out would always adjust itself to attain a balance with the rate of cold air in. To better control my oven I needed to control the rate of the cold air going in.

I took 2 fire bricks and cut them to fit snugly against the side of the arch. I made cardboard templates and traced out the exact shape needed to match the arch. Then simply placed them in on either side. No mortar, they are simply in place to reduce the influx of cold air.

It worked perfectly! I have made many a pizza and have had no problems whatsoever in maintaining 750-800*F and up if I want to. I really like how this worked out as I got the structural strength from the true arch, and the thermal control is now adjustable. For instance if I want to roast a turkey (or anything else) at closer to 600*F I can simply remove the side bricks.

This was just one little trick I learned that I thought might be useful for anyone with over-sized arch issues.

The side bricks are visible in place and working here:
Reply With Quote
  #3  
Old 03-29-2012, 06:47 PM
Serf
 
Join Date: Mar 2012
Location: Socal
Posts: 9
Default Re: Apagios's 42" Pompeii

dave, nice job on the build. I have been lurking here for a while and studying many of the builds here. Tons of good info and helpful folks. Thanks for the pic album. What size is your oven and what is the finished ht. at the O.D. of dome.
I noticed your stand is 5 block high.
My build will be a 39" igloo style, and I am hampered by a small yard and local building code placement issues to property line, therefore finished ht. is critical in my planning. May use a rounded back side of stand or "octo design like Giannifoccacia" used to be able to tuck it into the corner further, but will have to really watch the ht.
Not really concerned about chim ht as I will probably use a "flexible ht. design "with class a pipe.

Thanks, Bill
Reply With Quote
  #4  
Old 03-30-2012, 10:30 AM
Peasant
 
Join Date: Jun 2011
Location: Bowie, MD
Posts: 26
Default Re: Apagios's 42" Pompeii

Bill,

I was initially concerned I made it too tall, but once I leveled the ground and put the brick patio extension in, I found it is the absolute perfect height for me(i am 5'9"), no bending over at all, and not too tall (I use a small stool to get inside my oven and build up kindling to start the fire). Also 5 blocks lets me easily crawl into wood storage space to reach the back.

My oven is 42" ID, I did the Tuscan style with a hemisphere dome, so from the surface of my hearth pad I get the following approximate height:

2.5" (thickness of standard fire brick cooking floor)
21" (interior oven height)
4.5" (thickness of dome wall for 1/2 fire brick squares)
3" (ceramic blanket insulation)
~0.5" (Surface Bond Cement "stucco" shell)
----------
= 31.5"

So for your 39" igloo, I would subtract the difference in radii, (my 21" minus your 39/2 = 19.5" radius). So knocking off 1.5" from my height, 30" seems a good estimate of your external height if you use the same 3 layers of ceramic blanket insulation.

If total height is a serious concern for you to the effect that every inch mattters, I'd suggest going with 4 blocks instead of my 5 block for the stand. You could also consider a lower dome height if you intend on mainly pizza baking.

Also I used the 4" layer of vermiculite/portland mix for an insulating hearth. The plans call for ~3.5" of structural/rebar reinforced concrete for hearth, if you got FB Board for insulation you could knock another 1-3" off your height. I'd suggest looking up the recommended thickness of FB Board for under the cooking floor, but if you did say 3.5-4" thick structural pad with 1 layer of FB board insulation (~1" thick? I think, check that), your hearth would be closer to 5" total thickness, where as mine is 7.5" thick. But I didn't look into the FB Board much, so check out what thickness you need to keep your structural pad cool enough!

Good luck!
Reply With Quote
  #5  
Old 03-30-2012, 12:55 PM
Laborer
 
Join Date: Jan 2012
Location: Connecticut
Posts: 89
Default Re: Apagios's 42" Pompeii

Very nice build. I just started and after mixing and pouring 38 bags of 80lb concrete for my slab....I am jealous that I am no where near done yet

I enjoyed reviewing your build. I especially like how you transitioned your arch into the dome. Was there any magic involved with the cuts? or did you go with the angle of the first bottom brick and follow that all the way up each brick for the arch/ I want to do the same but was planning to build the dome and arch at the same time as I go up. You made it look easy with the precut bricks and pre built arch.

Thanks for sharing your build!

Dave
Reply With Quote
  #6  
Old 03-30-2012, 02:08 PM
Peasant
 
Join Date: Jun 2011
Location: Bowie, MD
Posts: 26
Default Re: Apagios's 42" Pompeii

Hi Dave,

So yeah I didn't exactly capture every step! I did start with all standard 4.5"x9"x2.5" firebricks. There was no magic really to figuring out the cuts, I originally was thinking something much more complex, but ended up laying it out so that the angle on the top of the arch would roughly match the angle of the course of bricks at that height. Basically the first full course of bricks above the arch would sit on the arch and load it evenly.

This is not the best picture because I only happened to catch it in the background of another shot. But you can see I laid out a sample arch representing my dome. Then I laid out a smaller arch representing my 13" arch doorway inside. If you look close in the pic you will see a pencil mark on the brick with a diagonal cut line that approximately matches the angle of the dome bricks:



I was originally thinking I'd have to match the angle at each level up, but it turns out you can cut the last bricks in each dome course to fit in the slot between the arch and the rest of the course. There will be some dihedral angles to cut there, but once you have a whole course done except for that last brick it's easy to see the shape you need and custom cut it.

Incidentally that diagonal cut on the arch bricks should be a length approximately equal to 4.5" since that's the size size of the 1/2 bricks used to build up the dome. That way the first course of brick sitting on your arch is entirely supported by the arch!

I would HIGHLY recommend building the doorway arch right after your soldier course is done, and before you do the 1st course on the dome. That way as you get higher you simply cut the last brick in each course to match the door arch, and since the door arch will already be set you have a nice visual reference.

Plus building arches you will come to find is easy, once you build the form you just mud the bricks and slap them up and the form holds them, It's good practice

I did spend some time laying out that bricks as you see in the pic and just trying to visualize in my head the 3-D shaping of the entire oven. It helps a lot. But if you cut that angle on the arch bricks like I mentioned, the first full course of dome bricks above the arch will sit on the arch, it makes for a very strong build IMHO.

If you look right next to my arch in this pic you can see the two smaller "keystone" bricks I cut to fit into the space between the arch and the 1/2 bricks of the rest of the course:



One other nice part about the arch being done and set up before building your dome, is that once you put those little custom cut bricks in, your course is now self supporting. It let me build pretty high before needing a form since the courses "lock" in to the arch, once that smaller brick is wedged in it's physically impossible for any of your other course bricks to slide down before the mortar sets.

And best of luck with your build! Just wait till your dome and chimney are done and you are doing curing fires. You'll feel like your done but there's still a ton of work to insulate and build the shell/weatherproof enclosure! I am thrilled with how mine turned out, but was definitely tough to get back to laying brick for the red brick bar top and bullnose bricks! I was mainly motivated by the impending frost, and my refusal to not get it done before winter!
videts38 likes this.

Last edited by apagios; 03-30-2012 at 02:12 PM.
Reply With Quote
  #7  
Old 03-30-2012, 02:16 PM
Peasant
 
Join Date: Jun 2011
Location: Bowie, MD
Posts: 26
Default Re: Apagios's 42" Pompeii

Oh and I started each course of bricks for the dome at alternating sides of the arch trying not to get mortar lines lining up. You can see from my interior pics there are some disturbingly close mortar lines going up the courses. Luckily Heat Stop 50 appears to be a far better mortar than I am a mason!

If I were to build another oven I would start each next course in the middle of the back wall and work around both sides to reach the doorway arch. It'll result in a few more custom cuts but should help reduce the number of close mortar lines. A few times I would cut a brick smaller to try and re-stagger the mortar lines, and they always had a habit of realigning!
videts38 likes this.
Reply With Quote
  #8  
Old 03-30-2012, 02:28 PM
Peasant
 
Join Date: Jun 2011
Location: Bowie, MD
Posts: 26
Default Re: Apagios's 42" Pompeii

Also as I got higher on the dome, I cut the bricks to fit each course. IIRC I starting cutting bricks to fit the course on the 4th course.

I used shims under the brick and between the brick and the square edge on the sliding saw table.

What this did was cock the brick up at and angle vertically and push the brick at an angle to the saw blade. The result is a trapezoidal prism brick, where 1 face of the trapezoid is smaller and the other face is a slightly larger trapezoid. You end up with the interior face and exterior face respectively.

Each course of bricks I added a small piece of shim stock and used a staple gun to attach it to the previous shim. So each course of bricks got progressively larger angle on the trapezoidal faces, allowing the bricks to better line up in the course as your dome begins to transition. After the first time you do this it becomes a very logical incremental increase in your shims as you build higher and higher on the dome.

To estimate the shims you need:
If you hold 2 square bricks on the completed course, you can see the triangles formed between the 2 brick halves from above looking down and from the outside of the dome looking into the gap between the bricks (the corners touch at the top but the lower corners have a gap, it will make much more sense when you try it, I wish I had a pic). I used the indispensable tool to keep the bricks at the proper angle when estimating my shim size.

Anyway, the width of those triangles you see is exactly double what your shims need to be to cut the bricks. Since when you cut the bricks into trapezoids each brick will have a section removed equaling half of the triangular gap.

I checked my gaps with square bricks before each course, and adjusted shims to match so that I could make repeatable and regular trapezoidal prism bricks to finish the course.
videts38 likes this.
Reply With Quote
  #9  
Old 03-31-2012, 09:43 AM
Serf
 
Join Date: Mar 2012
Location: Socal
Posts: 9
Default Re: Apagios's 42" Pompeii

Thanks for the response Dave, I will be going with the FB board for under the hearth and a 4 course block stand. What material did you use to seal the outer dome , over the insulation blanket?

Bill
Reply With Quote
  #10  
Old 04-02-2012, 08:18 AM
Peasant
 
Join Date: Jun 2011
Location: Bowie, MD
Posts: 26
Default Re: Apagios's 42" Pompeii

Bill,

I used the Quikcrete SBC:

QUIKRETE® - QUIKWALL® Surface Bonding Cement

I added the acrylic modifier to it to add to it's waterproof-ness. If you can find a gallon jug I recommend that. IIRC Qwikcrete calls for 1/2 gallon of the acrylic modifier per 50 lb bag and my local Lowes & Home Depot only sold it in quart bottles, so it was a tad more expensive then if I could get a gallon.

I added the modifier to the SBC first and then used just enough water to get it to a good consistency, so the acrylic modifier takes the place of some of the water used in the mix.

The spec sheets for the SBC mention that the acrylic modifier can be used to build a water storage tank! We had a mild winter in MD, but the SBC held up great, no cracks and my oven is bone dry!

I did run a bead of silicone caulk between the red brick arch facade and the SBC shell to seal it. It never gets hot enough there to cause an issue for the silicone.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
May be starting my 42" Pompeii in NYC this week... NYC Pompeii Oven Construction 123 05-27-2012 10:04 AM
Insulating boards for a 42" Pompeii . . . Cheesesteak Getting Started 5 04-20-2011 11:59 AM
42" Indoor Pompeii w/ room addition spidersden Getting Started 11 02-05-2011 11:22 AM
Island Pompeii 42" in Ontario Food With Legs Pompeii Oven Construction 12 07-14-2010 01:27 PM
Damian's 42" Tuscan Style Pompeii WFO Damian Introductions 3 09-21-2009 10:41 AM


All times are GMT -7. The time now is 05:00 PM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
© 2006/10 Forno Bravo, LLC