Default 42" Build Underway in Central Alabama

I've already posted several times asking questions...many thanks to those who have graciously replied with valuable information based on their skills and experiences.

I wanted to go ahead and start a thread for my photos - and maybe if someone here has advice, a better idea, or any other comment, they'll chime in.

We have three teenagers, and so far this has been a great family project. Everyone has pitched in and helped.

I don't plan on doing anything fancy. The oven will have a two-level counter to one side (using granite scrap slabs). I plan to build a small (10'x16') pavilion style shelter in front of the oven, with a shed roof off the back covering the oven and counter tops. I also plan to run water and electricity - although not sure when that will happen.

I really like the under-stand drawer that I've seen on several builds (i.e. Gulf), and will probably do something like that. Will also probably incorporate some LED strip and flood lighting...strips for the counters and floods for the front of the oven.



Above photo is me leveling the ground for the slabs. As we are at the Southern terminus of the Appalachians, there is not much level ground around here.
Reply With Quote
  #2  
Old 06-18-2014, 05:12 PM
Laborer
 
Join Date: Mar 2014
Location: USA
Posts: 74
Default Re: 42" Build Underway in Central Alabama



Ground leveled...
Reply With Quote
  #3  
Old 06-18-2014, 05:13 PM
Laborer
 
Join Date: Mar 2014
Location: USA
Posts: 74
Default Re: 42" Build Underway in Central Alabama



Tamped 4" of rock under form.
Reply With Quote
  #4  
Old 06-18-2014, 05:15 PM
Laborer
 
Join Date: Mar 2014
Location: USA
Posts: 74
Default Re: 42" Build Underway in Central Alabama



Ready to pour...funny how it doesn't look level, but it is!
Reply With Quote
  #5  
Old 06-18-2014, 05:17 PM
Laborer
 
Join Date: Mar 2014
Location: USA
Posts: 74
Default Re: 42" Build Underway in Central Alabama



5.5" - 6" slab...took a total of 59 60lb bags.
Reply With Quote
  #6  
Old 06-18-2014, 05:18 PM
Laborer
 
Join Date: Mar 2014
Location: USA
Posts: 74
Default Re: 42" Build Underway in Central Alabama



4" slab extension for counter tops.
Reply With Quote
  #7  
Old 06-18-2014, 05:22 PM
Laborer
 
Join Date: Mar 2014
Location: USA
Posts: 74
Default Re: 42" Build Underway in Central Alabama



Block stand with at least every other core poured with re-bar and concrete. Note the stainless steel 2" x 2" x 1/4" angle iron...it was a gift from my brother.
Reply With Quote
  #8  
Old 06-18-2014, 05:26 PM
Tscarborough's Avatar
Il Pizzaiolo
 
Join Date: Oct 2009
Location: Ausitn
Posts: 3,111
Default Re: 42" Build Underway in Central Alabama

And a very nice gift it is. When was the last time you guys had an earthquake?
Reply With Quote
  #9  
Old 06-18-2014, 05:26 PM
Laborer
 
Join Date: Mar 2014
Location: USA
Posts: 74
Default Re: 42" Build Underway in Central Alabama



Block and slab sealed and ready for French Drain and back fill. Ground will be sloped away from block on all sides. That is my 17 year old son (the oldest of our three teenagers) on the Kubota.

Last edited by edsiajb; 06-18-2014 at 07:58 PM.
Reply With Quote
  #10  
Old 06-18-2014, 05:28 PM
Laborer
 
Join Date: Mar 2014
Location: USA
Posts: 74
Default Re: 42" Build Underway in Central Alabama

Quote:
Originally Posted by Tscarborough View Post
And a very nice gift it is. When was the last time you guys had an earthquake?
We have an earthquake about once every 20 years...but they are always minor.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
40" corner build in central TX ogorir Pompeii Oven Construction 81 05-26-2014 11:26 AM
Pizza Bob's 42" Build pizza_bob Pompeii Oven Construction 268 01-25-2014 08:27 AM
Oven Build In Central Alabama MetalHead Pompeii Oven Construction 80 08-06-2012 06:04 PM
SC Chris's 42" WFO build SCChris Pompeii Oven Construction 132 04-15-2010 07:25 AM
Central California 42" Pompeii jon bell Pompeii Oven Construction 5 03-28-2009 07:18 PM


All times are GMT -7. The time now is 11:00 PM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC