Default 28" Pompeii

Hello Everybody,

I'm happy to say the weather has finally allowed me to commence my oven build. I have been lurking and learning on/from this forum now for many months and will say in advance "Thank you" to all who contribute to it. This is not something I would have ever thought of, much less attempted, were it not for this forum (and website in general), and its host and contributors.

I have to build a smaller oven than I originally planned due to an existing slab pour, which I extended. I didn't want to widen it to accomodate a larger oven because I thought the resulting triangles on either side of the new slab might fail, as they would be weak points, or at least to my thinking they would be. Some here suggested I extend the hearth beyond the block walls (as has been done on other builds), but that is not the look I want, even though it is a valid means of increasing the oven size.

These first few photos are pretty standard. My next step is to form the hearth and arch above the wood storage door, add rebar, then fill the cores. I would like to pour the cores and hearth slab together, but I calculate it will require upwards of 50 sacks of 80# concrete mix do do the entire pour, and I'll be doing this solo, so two pours is most likely.

gene
Attached Thumbnails
28" Pompeii-excavation1.jpg   28" Pompeii-slab_rebar1.jpg   28" Pompeii-slab_pour1.jpg   28" Pompeii-epoxy_rebar1.jpg   28" Pompeii-blocks1.jpg  

Reply With Quote
  #2  
Old 05-24-2011, 06:06 PM
Lburou's Avatar
Il Pizzaiolo
 
Join Date: Dec 2010
Location: DFW area, USA
Posts: 1,118
Thumbs up Great start!

Your work site is uncluttered. Your work very clean too. Something I haven't mastered

We have a new concrete business in our neighborhood. Its a mobile concrete truck where he mixes what you need right on-site. No minimums, up to 7 yards......You may have one of those on-site mixing trucks available to you. It won't cost any more than the sacrete and will be much faster and a potential better quality concrete overall.

All you need is a wheel barrow and shovel.

Just a thought.
__________________
Lee B.
DFW area, Texas, USA

If you are thinking about building a brick oven, my advice is
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Our One Meter Pompeii Oven album is
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

An album showing our Thermal Breaks is
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


I try to learn from my mistakes, and from yours when you give me a heads up.
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #3  
Old 05-24-2011, 06:12 PM
ggoose's Avatar
Apprentice
 
Join Date: Sep 2010
Location: Spokane, WA
Posts: 201
Default Re: 28" Pompeii

Thanks for the input Lburou. We have those same trucks here; in fact I used one to pour my footings and stemwalls for my garage. Unfortunatley, here they charge $150 for a "short load", anything less that 4 yards. So it is a bit cost prohibitive.

gene
Reply With Quote
  #4  
Old 05-24-2011, 06:18 PM
GianniFocaccia's Avatar
Il Pizzaiolo
 
Join Date: Jun 2009
Location: Disneyland, CA
Posts: 1,491
Default Re: 28" Pompeii

I thought the resulting triangles on either side of the new slab might fail, as they would be weak points

Question for the concrete/construction guys out there: In Goose's build, if additional triangle slabs were poured adjacent to the main slab, how much strength/rigidity would a CMU wall with horizontal rebar contribute to the entire unit, if any?

If this would not be the prescribed method of enlarging the slab, what would?

Great start to a very promising project, Goose.

John
Reply With Quote
  #5  
Old 05-27-2011, 03:21 PM
ggoose's Avatar
Apprentice
 
Join Date: Sep 2010
Location: Spokane, WA
Posts: 201
Default Re: 28" Pompeii

I was able to finish forming the hearth and installing the rebar today between rain showers.

It looks like the manual method of pouring the concrete will be to mix it in a rented mixer, dump it into a low trough (like a mortar tub) because that is about all one can dump into from the mixers Home Depot rents. Then shovel the mix from the tub into the cores/hearth. Does this sound about right to those who have done this before using a low-standing mixer?

gene
Attached Thumbnails
28" Pompeii-framing1.jpg   28" Pompeii-hearth_arch1.jpg   28" Pompeii-rebar1.jpg   28" Pompeii-rebar_arch1.jpg   28" Pompeii-frame_complete1.jpg  

videts38 likes this.
Reply With Quote
  #6  
Old 05-27-2011, 03:31 PM
GianniFocaccia's Avatar
Il Pizzaiolo
 
Join Date: Jun 2009
Location: Disneyland, CA
Posts: 1,491
Default Re: 28" Pompeii

I used a Harbor Freight mixer, but yup, that's the process. I didn't use bags of premix, rather I measured aggregate/sand (blend) mixed with portland and water by hand (bucket). It was a tremendous amount of work to do by myself, but the mixer, wheelbarrow and shovel was the ticket. Based on your pics, you're ready to go.

John
Attached Thumbnails
28" Pompeii-img_4478.jpg  
Reply With Quote
  #7  
Old 05-27-2011, 03:47 PM
Les's Avatar
Les Les is offline
Il Pizzaiolo
 
Join Date: Sep 2005
Location: Carson City, NV
Posts: 2,852
Default Re: 28" Pompeii

Quote:
Originally Posted by ggoose View Post
. Then shovel the mix from the tub into the cores/hearth. Does this sound about right to those who have done this before using a low-standing mixer?
I don't recall who it was but someone built a scaffolding and placed the mixer up high. My mixer allowed me to empty into a wheelbarrow and I shoveled from there.
__________________
Check out my pictures here:

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


If at first you don't succeed... Skydiving isn't for you.
Reply With Quote
  #8  
Old 05-31-2011, 12:51 PM
ggoose's Avatar
Apprentice
 
Join Date: Sep 2010
Location: Spokane, WA
Posts: 201
Default Re: 28" Pompeii

I am to the point of purchasing hi-temp mortar, and the local supplier sells a 15# pail of HeatStop for $32 and a 55# bag of Sairset for $67. Apparently both are already premixed with water. Has anyone used Sairset before? It is supposed to be good to nearly 3000 degrees F. I am a bit concerned about a wet mix in a bag that dries with air contact...I don't want to open the bag and have to use it all immediately. If anyone has experience with this product: did you like it and would you use it again? How did you seal the bag so the remaining contents didn't set?
Thanks for any responses,
gene
Reply With Quote
  #9  
Old 05-31-2011, 01:01 PM
ggoose's Avatar
Apprentice
 
Join Date: Sep 2010
Location: Spokane, WA
Posts: 201
Default Re: 28" Pompeii

Thanks John and Les,

I ended up doing it with a mixer and a tub and a shovel. Worked fine but made for a bit of a long day. I figure I moved about 40 bags of 80# four times (from HD to the truck to the mixing site to the mixer to the forms). I'm curing the hearth with plastic for a week or so until my FB insulation arrives and I can commence the firebrick work.
Attached Thumbnails
28" Pompeii-plastic1.jpg  
Reply With Quote
  #10  
Old 05-31-2011, 01:28 PM
GianniFocaccia's Avatar
Il Pizzaiolo
 
Join Date: Jun 2009
Location: Disneyland, CA
Posts: 1,491
Default Re: 28" Pompeii

Goose,

Sairset is a Harbison-Walker product. I believe this is the wet equivalent of the dry refractory air set mortar (Sairbond) I purchased from the HW warehouse in Los Angeles for $37 for a 50# bag. Instead of using it on my oven (I went with homebrew mortar), I built a firepit with it. It was easy to work with and the firebricks held beautifully over the course of a dozen or so fires. Unfortunately, the distribution manager who sold me the Sairbond forgot to mention that the mortar was water soluable. Even though it was covered, the humidity from the next rain turned my mortar to dust. I am now faced with rebuilding it using homebrew mortar. Don't know if it was just an old bag of product or what, but I am pleased to no end that I didn't use it on my oven.

John
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Debating between Pompeii and Modular build Cheesesteak Pompeii Oven Construction 20 04-02-2011 05:17 PM
Northern Minnesota Pompeii davmorr Brick Oven Photos 2 01-16-2011 10:09 AM
Considering a Pompeii, would the Cucina stand work? jamey777 Pompeii Oven Construction 19 09-08-2010 04:20 PM
Hope Pompeii Oven Photos Part 1 Hope Brick Oven Photos 0 08-22-2005 09:06 AM
Why we did the Pompeii Oven james Introductions 0 03-21-2005 03:48 AM


All times are GMT -7. The time now is 03:22 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC