| Pizza Ovens | (800) 407-5119 | Info@fornobravo.com |
![]() |
| | |||||||
| | LinkBack | Thread Tools | Display Modes |
| |||
| Okay, Casa 100 dome is up and have some questions. Looking from the inside the seams are pretty tight and line up okay. There is one section where the pieces all meet that is a bit lower. Additionally, there is a 1/4" to 1/2' inch hole right in the center of the dome. Is this okay since the mortar will cover it or should I try to correct it because possibly I have the sections in the incorrect position? The dome pieces are not perfectly molded so it seems there is no way to make the oven match up perfectly. It seems like I am really close to mortaring the dome and proceeding with the rest of the install. I appreciate anyone's input. |
| |||
| Could I have the two pieces crisscrossed? Is there an eay way to tell which piece goes where and what is top and bottom. I truly believe I have the top and bottoms set up properly. I could send you pictures to your private email if that would help. |
| Thread Tools | |
| Display Modes | |
| |
| | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| A Potential New Low Dome Design | james | Pompeii Oven Construction | 16 | 05-01-2007 04:39 PM |
| Dome Angle Question | james | Pompeii Oven Construction | 0 | 01-17-2007 08:26 PM |
| Verifying alignment of Casa 90 vent | Alan | Modular Refractory Oven Installation | 5 | 09-26-2006 07:15 PM |
| dome rings combining with chimney brick | smithgardens | Pompeii Oven Construction | 0 | 05-16-2006 12:55 PM |
| help 4.5 vs 9 inch bricks for the dome | kambos | Newbie Forum | 5 | 05-02-2005 05:51 PM |