I have a question on insulating the dome. I am using the ratio of 1 to 10 of vermiculite and with that mixture Iím having trouble getting it to stay on the dome. It seems to be very crumbly and hard to work with. Do you have to let it set up overnight and then add more? If you have any suggestions please let me know.
__________________

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #2  
Old 07-15-2010, 01:38 PM
Neil2's Avatar
Il Pizzaiolo
 
Join Date: Oct 2006
Location: Vancouver Island
Posts: 1,374
Default Re: vermiculite

Go up in 6 inch "lifts". Allow to set for an hour or so. The next lift then rests on the lift below.
Reply With Quote
  #3  
Old 07-15-2010, 10:02 PM
david s's Avatar
Il Pizzaiolo
 
Join Date: Mar 2007
Location: Townsville, Nth Queensland,Australia
Posts: 4,691
Default Re: vermiculite

Make sure that you mix the correct amount of water with it ie for every 10L vermiculite add 1L cement powder and 3L water. Mix it really well and work from the bottom up making sure you leave a ledge to hold the next lift. Also pressing and holding the mix in place for a couple of seconds helps. It seems like the mix won't hold but it does set up firm enough to take the outside stucco.
Reply With Quote
  #4  
Old 07-16-2010, 01:59 AM
Peasant
 
Join Date: Apr 2010
Location: South London: UK
Posts: 39
Default Re: vermiculite

dont people alot use mesh to give it something to grip into for the first layer?
Reply With Quote
  #5  
Old 07-16-2010, 05:33 AM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,216
Default Re: vermiculite

Quote:
dont people alot use mesh to give it something to grip into for the first layer?
It won't stick to mesh. It's not like mortar. It's like stacking up oatmeal. As Neil says, you have to do it in courses, giving a while for the previous layer to dry, or the whole mess will collapse in a heap.
__________________
My geodesic oven project:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
,
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #6  
Old 07-16-2010, 07:45 AM
morrishuckeba's Avatar
Laborer
 
Join Date: Mar 2010
Location: Alto, New Mexico
Posts: 78
Default Re: vermiculite

It is like pushing a car up a hill with a rope.
__________________

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #7  
Old 07-16-2010, 08:52 AM
Apprentice
 
Join Date: Jan 2010
Location: South Africa
Posts: 107
Default Re: vermiculite

Will it be much worse insulating when mixed 1:5 for instance?
Reply With Quote
  #8  
Old 07-16-2010, 06:13 PM
david s's Avatar
Il Pizzaiolo
 
Join Date: Mar 2007
Location: Townsville, Nth Queensland,Australia
Posts: 4,691
Default Re: vermiculite

A1:5 mix will set up better, but you are adding heaps more weight to the resulting mixture, increasing its density and hence reducing its insulation value. I usually cover the whole dome in one go,with a layer about 35 mm thick, leave it for a few days so nature will do most of the job of removing the water, then do a second layer. Tapping with the flat of a trowel will give you a perfectly formed hemisphere.
Reply With Quote
  #9  
Old 07-17-2010, 03:12 AM
Apprentice
 
Join Date: Jan 2010
Location: South Africa
Posts: 107
Default Re: vermiculite

Thanks, I will definitely go weaker then. A tad worried now as I did my floor 1:5. While that is lower & thus less prone to heat leak, I am also worried for another reason. I use 2nd hand bricks which are very!! hard (8 cuts per diamond blade :-() so I used a build-soldiers-on-floor approach so as to get away with chisel break ends only. Problem comes in that I have casted my vermiculite in a circle within a concrete border and the excess length and corners of the floor bricks which are "sticking out" the soldier outer circumference is now resting on the concrete floor! Thus small ends not insulated at all. In my enthusiasm at the time & focussing on starting round & first encounter with fire clay etc (which hid the outer perimeter & thus allowed me to forget), so no excuse other than neglect at the time, but now 5odd rows up, its too late to redo.
On the positive side, I see many entrances not insulated to a big degree, so perhaps the loss to the lower & outer fringes may be little enough to get by.
Unfair to ask for anybody with such experience as you guys all do it right, but I am somewhat concerned.
Reply With Quote
  #10  
Old 07-17-2010, 03:51 AM
david s's Avatar
Il Pizzaiolo
 
Join Date: Mar 2007
Location: Townsville, Nth Queensland,Australia
Posts: 4,691
Default Re: vermiculite

Dolf,
Don't worry you'll be ok. You won't lose too much heat from those bricks in contact with the concrete. You are also correct with the floor mix. It needs to be about 5:1 for the strength required as it supports the floor and dome. I was referring to the mix (10:1) over the dome.
CheersDave
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
vermiculite hearth question jeffscogson Newbie Forum 14 04-28-2010 01:26 AM
vermiculite mrgweeto Tools, Tips and Techniques 2 07-02-2009 11:52 AM
vermiculite still damp SimonWoodfield Pompeii Oven Construction 5 05-02-2009 04:20 PM
What is Vermiculite james Getting Started 8 07-09-2008 10:35 AM
Vermiculite - help! Frances Getting Started 7 09-19-2007 04:09 AM


All times are GMT -7. The time now is 05:47 PM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
© 2006/10 Forno Bravo, LLC