Cost vs. Time Tradeoff I think Alan has it right. The Super Isol costs a little more than the cost of the vermiculite and concrete that it replaces (not a lot), but it counter balances that cost with convenience. If you are paying someone to do that part of the job, I think the labor savings probably makes the two alternatives pretty comparable from a cost perspective.
There are also the intangibles, including the effort of mixing and pouring the vermiculite concrete, two pours in a day, needing a helper, finding vermiculite locally, driving to pick it up, etc.
The good news is that you get to decide what works for you depending on your own circumstances.
James |