I'm building an oven per the FB guidelines/"manual" - a corner oven, 64" wide stand, with a 30" corner using 45 degree blocks.

Because of the corner blocks, I can't get the blocks drystacked without leaving a gap between them. (The corner blocks are gauged for mortar joints.) This worries me - I'm going to mortar stone over the top, any gaps that could hold water would be a bad idea here where we freeze.

So - I'm wondering about thoughts on mortaring the blocks instead of pouring the cores. Expense, expertise required, labor, etc... I'd probably still pour the corners (with encased rebar) for strength, and I'm going to bond-beam the top layer with rebar.

FYI, I'm also building 5 courses high to get the cooking surface higher.

Thanks!
Reply With Quote
  #2  
Old 04-10-2011, 07:04 AM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,216
Default Re: Stand - pouring cores vs. mortar?

The reason for dry-stacking the block stand is that mortaring a block wall is surprisingly difficult. For an amateur like myself, most of the mortar ends up on the ground or in the voids. If you know how do it, then by all means do. If it is a skill set you need to acquire, you may see the benefit of a work-around.

By the way, with a bit of planning you can cut surprisingly complex angles on a concrete block using an angle grinder. The trick is to plan the cuts where the voids are. You can also fill any corner gaps with mortar mix.
__________________
My geodesic oven project:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
,
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #3  
Old 04-10-2011, 11:48 AM
Master Builder
 
Join Date: Jul 2009
Location: Los Angeles
Posts: 942
Default Re: Stand - pouring cores vs. mortar?

Quote:
Originally Posted by Cheesehead View Post

Because of the corner blocks, I can't get the blocks drystacked without leaving a gap between them.
Cut the corner blocks to angle the best you can and form the corner with lumber. Rebar the corner and pour concrete down into the corner form along with the other core voids. That's what I did on one corner of my 4' high concrete block patio build.
__________________
George


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


Weber 22-OTG / Ugly Drum Smoker / 34" WFO
Reply With Quote
  #4  
Old 04-11-2011, 09:32 AM
SableSprings's Avatar
Apprentice
 
Join Date: May 2009
Location: Roseburg, OR USA
Posts: 234
Default Re: Stand - pouring cores vs. mortar?

I struggled with how to create my corner installation without having to cut blocks and came up with an idea you might find useful. Playing with the blocks I settled on the design shown in the attached thumbnails. With the open bays on the left and right for storage, my working/usable space was greatly expanded. Take a look at my FB photo album (The Dragonfly Den - posted by sablesprings) or through the bottom photo link on www.sablesprings.com - the carts built for the bays have really proved to be functional.

When I got ready to do the top slab on my free-standing blocks, I had every other support block "hole" plugged with cement bags and poured both the slab and filled the open block voids at once. That filled enough of the block voids to secure the base, tied the blocks to the top slab so there would be no "future movement" of the stand and saved myself a few dollars in concrete costs. I started out thinking I'd mix the concrete for the top slab pour myself. After mixing two 80# bags in a small cement mixer I'd borrowed, I called the local cement company and scheduled a delivery/pour of a yard of concrete that afternoon. I should have done a better job on some of my concrete forms, but everything was done in one day.

Hope this helps...
Attached Thumbnails
Stand - pouring cores vs. mortar?-02.jpg   Stand - pouring cores vs. mortar?-05.jpg  
__________________
Mike Stansbury
Roseburg, Oregon (
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
)

Photo albums

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Last edited by SableSprings; 04-11-2011 at 09:46 AM.
Reply With Quote
  #5  
Old 04-13-2011, 07:19 PM
Cheesehead's Avatar
Peasant
 
Join Date: Aug 2010
Location: Western Wisconsin
Posts: 42
Default Re: Stand - pouring cores vs. mortar?

Thanks for the responses! Pour it is, with some "tuck-pointing" to fill the gaps. Plans right now are for the opening to be in the back...

and I'm really going to have to get some of the local college students to help me with a 1 yd^3 load of concrete, since I've got a 25' retaining wall to pour too. I'm thinking 50-60 bags of concrete might get a little tiring.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
High Heat Mortar Primer james Getting Started 80 01-27-2014 06:40 PM
Flue mortar - solution for too wide mortar joints? thamnophis Tools, Tips and Techniques 2 10-14-2010 05:14 AM
How thick a mortar gap with "horizontal" soldiers? kebwi Tools, Tips and Techniques 6 11-05-2009 08:02 AM
Maximum mortar joint on inner oven surface? kebwi Pompeii Oven Construction 17 10-27-2009 06:11 PM
Fire Mortar vs. Refax Refractory Mortar southpaw Pompeii Oven Construction 4 04-07-2007 05:02 AM


All times are GMT -7. The time now is 12:58 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC