#1  
Old 10-01-2011, 02:54 PM
gtofani's Avatar
Apprentice
 
Join Date: Sep 2011
Location: Pennsylvania
Posts: 138
Default Soldier course placement

This may sound stupid but the soldier course is a full brick, right?
I changed my mind for the 50th time and went ahead and cut all my floor pieces so now I am committed to the soldier course standing around the floor rather than on top. All the pictures look as though with this type of build, I use full size bricks. Just making sure before starting.
The mixture in the wet saw tray after cutting the bricks was so hard I had to use a putty knife to scrape it out. Thought about saving it but didn't.
I have 300 halves and the floor cuts all ready to go.
Now if it would only stop raining. Maybe I should build an ark instead.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Scottish Soldier dida Humor 0 11-27-2010 05:58 PM
Padding out the soldier course? mpjfitz Pompeii Oven Construction 3 05-18-2010 11:49 AM
Soldier or no soldier? goodgulf Pompeii Oven Construction 11 11-06-2009 03:57 PM
Current consensus on soldier on/around floor? kebwi Pompeii Oven Construction 6 08-31-2009 05:56 PM
Soldier Course & dome angle advice DimTex Pompeii Oven Construction 18 08-06-2009 10:49 AM


All times are GMT -7. The time now is 07:41 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC