| Just about to start construction and have a queary on the hearth. I thought about building the stand 5 blocks high and using the top row of blocks as the formwork for the structual and insulating hearth. I would lay 4 courses, put down a fibre cement sheet then put the last course on top. The reo bar would tie it all together and keep it stable. Could i then just use reo mesh in the 2 slabs for strength??? |
|
#2
| |||
| |||
| Barnsey, That is kind of what I did. It worked out well for me. Good luck. Mark |
|
#3
| |||
| |||
| Hi Barnesy, I was thinking about using the same method. Four bricks high and placing an 18mm compressed fibre cement sheeting between the fourth and fifth block then pouring in the concrete. Just wanted to know how you went with this. |
|
#4
| |||
| |||
| thats pretty much what i did as well,, see pics Cheers Mark Last edited by ThisOldGarageNJ; 08-16-2010 at 06:53 PM. |
|
#5
| |||
| |||
| That’s a little different to what I’m thinking. It appears that you set the formwork above the last layer of bricks. What I’m thinking of doing is adding one more layer of bricks to act as the form work. |
|
#6
| |||
| |||
| For added security if I were doing something like this I would use narrower blocks (8x6x16) as the top formwork course so the entire slab perimeter would rest partly on the wider (8x8x16) blocks beneath. But I guess with enough rebars extending into the blocks themselves, that's more than adequate. Last edited by fxpose; 12-16-2009 at 05:11 PM. |
|
#7
| ||||
| ||||
| I agree with fxpose. Unless your suspended structural slab is supported on the wall (2 inches should do it) it will shear at the wall face. |
|
#8
| |||
| |||
| Just what I was thinking guys. First four layers of 390x190x190 Besser blocks then on the Fifth Formwork layer a 390 x 90 x 190 block. That’s 100mm of overlay on the slab. The other option was to use decomposed granite instead of concrete, level, and then place 2” Calcium silica board then fire bricks on top. Might save some time. |
![]() |
| Thread Tools | |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Pouring hearth | Marc Olson | Modular Refractory Oven Installation | 12 | 03-09-2008 10:22 AM |
| Pouring Hearth Question | telehort | Getting Started | 7 | 01-29-2007 10:20 AM |
| couple of detail question before I pour the hearth | firepie | Pompeii Oven Construction | 8 | 04-26-2006 03:37 PM |
| Between Hearth SLAB and Hearth BRICKS, slip plane. | Marcel | Newbie Forum | 2 | 09-12-2005 06:35 PM |
| Spanning the wood storage below the Hearth slab. | Marcel | Getting Started | 0 | 08-22-2005 10:13 PM |