#1  
Old 04-15-2010, 03:01 PM
morrishuckeba's Avatar
Laborer
 
Join Date: Mar 2010
Location: Alto, New Mexico
Posts: 78
Default My begening

This is the site that I will be building my pizza oven on. I will be pouring a 5” pad on top of the existing concrete, because it has too much of a slope. This is the tool that I built this morning, the turnbuckle is so I can lower the dome. Pictures below
Attached Thumbnails
My begening-gage1.jpg   My begening-gage1-2-.jpg   My begening-gage-2.jpg  

Last edited by morrishuckeba; 04-23-2010 at 07:27 AM.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -7. The time now is 03:36 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC