Default Getting Started...

any designs out there for the round model? How about the smallest that one could get away with?
Reply With Quote
  #2  
Old 05-01-2006, 09:38 PM
james's Avatar
Brick Oven Merchant
 
Join Date: Mar 2005
Location: Pebble Beach, CA
Posts: 4,648
Default

The plans are here:

http://fornobravo.com/pompeii_oven/pompeii_oven.html

As a rule, 36" is a good minumum; 31" in a pinch. Anything smaller than that, and you should try to get crafty, and make a 31" oven work.

James
__________________

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #3  
Old 05-03-2006, 11:09 AM
Serf
 
Join Date: May 2006
Posts: 4
Default

cool, 31 to 36" could work in my backyard. On an oven this size, and considering I plan on going with the Gabled version using steel framing, how much of a distance would you reccoment from the outside of the dome (including the mortar layer) and the inside of the framing structure?
I plan on filling the cavity with vermiculite (sp?).
Reply With Quote
  #4  
Old 05-03-2006, 11:46 AM
james's Avatar
Brick Oven Merchant
 
Join Date: Mar 2005
Location: Pebble Beach, CA
Posts: 4,648
Default

Good plan.
If possible, you should leave 5" between the outside of the dome and the wall. That would fit 1" woven ceramic insulation (insulfrax) and 4" loose vermiculite.

Don't put a metal stud directly across from the dome where it is the closest to the edge, and you have more space.

James
__________________

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #5  
Old 05-04-2006, 02:50 PM
Serf
 
Join Date: May 2006
Posts: 4
Default

Then I think I can do a 63 x 73 foundation, 56 x 63 block stand and do a 36" cooking surface. I may need to reduce the dome diameter slightly, but I figure I can figure it out once I have the insulating hearth built.

one more question on the foundation:
I plan on pouring a patio beforehand and the oven will be part of it but will come afterwards. Would you pour the foundation for the oven at the same time you pour the foundation for the patio? Meaning all as one (given that the depth of each will be different. Or would you pour one and then pour the other around it. Note I live in San Diego and I do not have to worry about frost in the winter.
Reply With Quote
  #6  
Old 05-04-2006, 03:09 PM
james's Avatar
Brick Oven Merchant
 
Join Date: Mar 2005
Location: Pebble Beach, CA
Posts: 4,648
Default

Earthquake maybe, frost no.

It makes sense to me to pour everything at once. Anyone disagree with that?
James
__________________

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #7  
Old 05-04-2006, 04:12 PM
Robert Musa's Avatar
Apprentice
 
Join Date: Mar 2005
Location: Sacramento CA
Posts: 116
Default

i built my oven on top of an existing patio (which i figure is between 3 and 5 inches thick and unreinforced (no wire or rebar)). i've had no cracking problems near the oven (there was a pre-existing crack about 12 feet away). so (in my "no warranties" opinion) i think you can safely pour both with about the same thickness, at the same time.

however, the one thing you will want to do is to have the people setting the forms, do so in such a manner that your patio will be level where you want the oven (otherwise you'll have to painfully measure and cut concrete block like i did). the rest of the patio will slope for drainage. its probably best to achieve "levelness" by bringing UP the base of the patio under the oven (relative to the rest of the patio). in this manner you'll get some extra thickness under the oven, get the base level and also prevent water from flowing into your wood storage area.
__________________
my site for our pompeii and tandoor ovens

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #8  
Old 05-05-2006, 11:34 AM
Serf
 
Join Date: May 2006
Posts: 4
Default

Yes, I realized that I would have to deal with the leveling issue. I may separate the two with treated 2x6. I'll have to think about it. Good news is that it sounds like I don't need to go the full 10".
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -7. The time now is 03:49 PM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC