Just signed up first post and have a ton of questions. Might as well start at the bottom. Living in Ct. with frost and freezing what do you do for foundation of stove? Footing code here is 42 inches this seems like overkill for a stove. Is it ok to dig down 8 inches or so and do a pad? I have a wood 15 X 12 shed in my back yard that weighs quite a bit on a 6 inch pad with no problems. This is not going to be inspected.
Reply With Quote
  #2  
Old 10-11-2010, 06:27 PM
Laborer
 
Join Date: Mar 2010
Location: Grand Rapids MI
Posts: 95
Default Re: Foundation

Mike, I remember going through the same thought process. I grew up in Maine and currently live in Michigan. I know what frost can do to even the heaviest of items. In the end, I decided to put the full foundation under the oven. I didn't want to put all the time and effort into the oven only to find it attacked by a winter's frost. Here is a link to photos that I took of the foundation process: Picasa Web Albums - Daniel Woodruff - Wood Fired Oven. Another great resource can be found here: http://mainewoodheat.com/downloads/L...nual_Small.pdf. Go to the bottom of the .pdf document. It includes some help on how to build a proven foundation for a wood fired oven.
Reply With Quote
  #3  
Old 10-11-2010, 07:37 PM
dbhansen's Avatar
Master Builder
 
Join Date: Jun 2007
Location: Appleton, WI
Posts: 563
Default Re: Foundation

There have been many discussions on this topic, Mike, so you can find a bunch of information in old posts, such as this one (Footers no footers). Do a search for "floating slab" or "frost line."
I went a similar route as tusr18a, with a 60" deep foundation, but many people in "the north" have had success with floating slabs. It depends to some extent on the soil type and drainage conditions. Good luck!
Daren
__________________

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #4  
Old 10-11-2010, 08:33 PM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,216
Default Re: Foundation

I build three-foot-down one-foot-thick footings, but I was planning a two story chimney attached to a building, so I was building to masonry fireplace code. It's generally accepted that for freestanding ovens that aren't going to be much taller than you are, a 4 inch reinforced slab on six inches of well drained crushed rock is all you need. The theory is that if you aren't sitting in water, frost heave won't be a problem.
__________________
My geodesic oven project:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
,
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #5  
Old 10-12-2010, 09:43 AM
Serf
 
Join Date: Oct 2010
Location: Scarborough, ME
Posts: 13
Default Re: Foundation

I live in Maine (where are you from tusr18a?) and have the same question. A lot of our soils are clay and I have the added issue that the location I have chosen for my oven is where they pushed out the material from our in-ground pool. Probably not a real stable area in which to rely on a 6 inch pad for something where so many hours of work are going to be invested.

In speaking with the local masonary supplier this weekend, he suggested digging down 4 + feet and putting in 18 inches of compacted gravel and then pouring a 3 foot deep by the dimensions of the slab block of concrete. I figure that it will take about 5 yards which at about $100 a yard delivered is a good chunk of change. I guess I will have to weigh that against the time and effort of pouring a deep footing and building up to grade with block. I was hoping that all of my block work could be dry stacked. Once you brought the blocks up to grade, did you fill the center of the block cube with dirt tusr18a before pouring the base (across the top of the foundation blocks)?

I may just excavate the hole down the 4 + feet, fill it with compacted gravel for stability and drainage and then pour an 8 inch reinforced slab. Does this seem reasonable?

BTW tusr18a, you get the award for the most intricately engineered form.
Reply With Quote
  #6  
Old 10-12-2010, 10:39 AM
Laborer
 
Join Date: Mar 2010
Location: Grand Rapids MI
Posts: 95
Default Re: Foundation

Everyone that I talked thought that I overbuilt the foundation. I simply did it for a piece of mind. I went down to a depth of five feet. I poured a 1 foot thick footing. Then I built a cement block wall up to grade. I did not dry stack. Never having done any masonry work, I decided to learn the trade on the part of the oven build that would ultimately be buried. It was a very frustrating process. Definitely gained a whole new respect for the masonry trade. With that said, through trial and error, I started to get the hang of it. By the time I was ready to build the dome, I had the needed masonry skills to pull it off. As to buying pre-mixed cement or hand mixing it, I ended up going w/pre-mix because I was never confident that I would be able to mix up all the cement before some of the pour started to set on me. For the footing, I had the cement truck come to the yard. For the slab at grade and for the slab on the top of the stand, I found a vendor that sold pre-mixed cement by the trailer load. I attached the trailer to my SUV and dragged it home. A lot cheaper.

I grew up in Central Maine in a small town called Pittsfield. My dad still lives there. My mother lives down on the coast in South Bristol. Get back a few times a year.
Reply With Quote
  #7  
Old 10-12-2010, 11:07 AM
Serf
 
Join Date: Oct 2010
Location: Scarborough, ME
Posts: 13
Default Re: Foundation

Quote:
I grew up in Central Maine in a small town called Pittsfield. My dad still lives there. My mother lives down on the coast in South Bristol. Get back a few times a year.
I know exactly where you are from. I live just south of Portland, in Scarborough. I am a transplant from Los Angeles though. Thanks for the additional thought on the base.
Reply With Quote
  #8  
Old 10-12-2010, 06:55 PM
Aegis's Avatar
Journeyman
 
Join Date: Jan 2008
Location: Southbury Ct. USA
Posts: 435
Default Re: Foundation

Hi Mike, I live in Southbury Ct. and poured a slab over 6" of stone, but I also did some 42" sono tubes that got filled with concrete. I will let you know in the spring how it fared! LOL I know that won't do you much good now. Here is a couple of pics of my progress. Good Luck!
John
Attached Thumbnails
Foundation-img_1361sml-dean-tapping.jpg   Foundation-img_1402_slab2.jpg   Foundation-img_1400_slab.jpg   Foundation-finishing-slab4.jpg   Foundation-standclosesml.jpg  

__________________
Build Thread:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Photos:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Oven Blog:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Last edited by Aegis; 10-12-2010 at 06:59 PM.
Reply With Quote
  #9  
Old 10-12-2010, 06:58 PM
Aegis's Avatar
Journeyman
 
Join Date: Jan 2008
Location: Southbury Ct. USA
Posts: 435
Default Re: Foundation

Couple more pics of the "finished oven" LOL
Attached Thumbnails
Foundation-brickoven5-9-26-10ab.jpg   Foundation-2010-10-03_0037sml.jpg  
__________________
Build Thread:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Photos:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Oven Blog:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #10  
Old 10-12-2010, 07:07 PM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,216
Default Re: Foundation

Quote:
In speaking with the local masonary supplier this weekend, he suggested digging down 4 + feet and putting in 18 inches of compacted gravel and then pouring a 3 foot deep by the dimensions of the slab block of concrete. I figure that it will take about 5 yards
Wow. Wow. Wow. I think "masonry supplier" is the key phrase in that sentence. Here's what code is for masonry fireplaces, which is overbuilt by most backyard builders standards:

The footings should be below the frost line (three feet here) and extend six inches beyond the footprint of your oven. It should be consist of twelve inches of reinforced concrete, and be poured on undisturbed soil (no gravel). It can either be a ring below the oven walls, or a solid slug, whichever is easier. On these footings, you build your walls upward.

I think the guy who's trying to sell you a three foot block of concrete on a foot and a half of crushed rock is trying to make a big sale. It sounds like the anchorage of a mid-sized suspension bridge to me.
__________________
My geodesic oven project:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
,
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Starting my foundation questions? Italfranco1 Pompeii Oven Construction 17 07-15-2012 05:16 PM
Alternative foundation dabstar Getting Started 3 04-26-2010 05:31 AM
Foundation - Scotland build - require advice please Iain Getting Started 25 04-15-2010 04:09 AM
Putting friends to work on concrete foundation kebwi Tools, Tips and Techniques 8 09-24-2009 08:17 PM
Another foundation question mfiore Getting Started 27 06-01-2008 05:31 PM


All times are GMT -7. The time now is 05:18 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC