| Pizza Ovens | (800) 407-5119 | Info@fornobravo.com |
![]() |
| | |||||||
| | LinkBack | Thread Tools | Display Modes |
| |||
| Maybe I'm missing something in the plans. I've built the stand and placed my blocks over the angle iron on the front of the stand. How will I fill these blocks on the angle iron with concrete or keep the concrete from the hearth from falling through the holes in the block? Do I place masonry board over or under them? Thanks, K |
| |||
| I used a scrap or 1x6 cut just a bit shorter than the opening, then propped it up with a couple of 2x4 scraps - on the underside. Then filled them when I poured the other block cores. After it set, I just knocked out the props and the 1x6 fell to the ground - leaving a relatively smooth underside to the opening. RT |
| Thread Tools | |
| Display Modes | |
| |
| | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Block over the angle iron... | johnrbek | Pompeii Oven Construction | 5 | 02-18-2007 04:40 PM |
| Angle iron and rust | KISS4me | Newbie Forum | 6 | 10-05-2006 01:23 PM |
| 4th course and Angle Iron | mrpbjnance | Pompeii Oven Construction | 2 | 07-26-2006 02:35 PM |
| Size of Angle Iron for Base | tdibratt | Pompeii Oven Construction | 1 | 07-15-2005 01:58 AM |
| oven opening construction | james | Pompeii Oven Construction | 3 | 03-20-2005 08:44 PM |