Pizza Ovens | (800) 407-5119 | info@fornobravo.com | U.S. Price List
logo

start shopping button

Home
About Us
Forum
Contact Us
Store
Tech Specs
Dealers
Photos
Recipes
Video

Go Back   Forno Bravo Forum: The Wood-Fired Oven Community > Pizza Oven Design and Installation > Getting Started

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 10-05-2008, 04:05 AM
Laborer
 
Join Date: May 2008
Location: Howden, Tasmania, Australia
Posts: 60
Default Entry arch form work

Hi. Laid the bricks for the entry arch today. How long should I wait before I remove the form work?

Also what is the best method to clean the bricks once they are laid?

Cheers
Jase
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiTweet this Post!
Reply With Quote
  #2  
Old 10-05-2008, 11:26 AM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,213
Default Re: Entry arch form work

Quote:
Also what is the best method to clean the bricks once they are laid?
If at all possible, clean the excess mortar off with water and a sponge about six hours after the days build. Getting mortar off once it's set gets more difficult.
__________________
My geodesic oven project:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
,
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiTweet this Post!
Reply With Quote
  #3  
Old 10-06-2008, 05:01 AM
nissanneill's Avatar
Il Pizzaiolo
 
Join Date: Apr 2007
Location: Adelaide, South Australia
Posts: 1,627
Thumbs up Re: Entry arch form work

Jase,
if you mixed your mortar correctly and not too wet and you wet your bricks prior to laying (they then don't suck excess moisture from your mortar), then I would remove the formwork within at least a couple of hours of laying. The bricks should be self supporting and provided you have sufficient buffering on the sides, then they should be self supporting as soon as the mortar stiffens up, even before it sets properly.
This as Dmun says, makes cleaning the bricks much easier.
You can always wash the finished bricks with a brick wash (which is diluted hydrochloric or pool acid, but use with extreme care as it bites! It also allows you to rake or roll your joints better.

Neill
__________________
Prevention is better than cure, - do it right the first time!

The more I learn, the more I realise how little I know


Neill’s Pompeiii #1

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Neill’s kitchen underway

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiTweet this Post!
Reply With Quote
  #4  
Old 10-06-2008, 05:01 PM
Laborer
 
Join Date: May 2008
Location: Howden, Tasmania, Australia
Posts: 60
Default Re: Entry arch form work

Thanks Neill. The mortar was like a sticky thick toothpaste, is that about right? and I did soak the bricks prior to laying them.

It reminded me of the clay I used to use in when I was doing pottery at high school so many years ago.

Cheers
Jase
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiTweet this Post!
Reply With Quote
  #5  
Old 10-07-2008, 02:32 AM
nissanneill's Avatar
Il Pizzaiolo
 
Join Date: Apr 2007
Location: Adelaide, South Australia
Posts: 1,627
Thumbs up Re: Entry arch form work

Sounds just about ideal, stiff but sticky!
You did the right thing by wetting your bricks so they don't absorb too much water from the mortar which weakens it or mainly the bond a little.

Neill
__________________
Prevention is better than cure, - do it right the first time!

The more I learn, the more I realise how little I know


Neill’s Pompeiii #1

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Neill’s kitchen underway

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiTweet this Post!
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Drake's 38" Oven DrakeRemoray Pompeii Oven Construction 108 03-22-2009 03:56 PM
Lighting the entry arch?? woods witch Pompeii Oven Construction 0 08-28-2008 05:28 AM
Entry arch Xabia Jim Design Styles, Chimneys and Finish 5 07-15-2008 09:03 AM
Styrofoam Form for the vent arch? thebadger Pompeii Oven Construction 10 04-13-2008 07:03 PM
brick thickness for top of landing arch waynebergman Pompeii Oven Construction 2 11-28-2007 10:29 AM


All times are GMT -7. The time now is 11:47 AM.

Home | About Us | Our Factory | Dealers | Press and News | Contact Us | FAQ | Forno Bravo UK
Residential Pizza Ovens | Commercial Pizza Ovens | Catering Pizza Ovens | Pizza Oven Accessories | Pizza Peels | Outdoor Fireplaces
Select | Justify | Order | Install | Manage | Make Pizza | Roast, Bake and Grill
Pompeii Brick Oven | Firenze Concept Oven | Links | Cookbooks | Vera Pizza Napoletana | Pizza Oven Photos
Commercial Pizza Oven Selector | Outdoor Kitchen Design | Site Map | Forum

© 2006 Forno Bravo, LLC Italian Pizza Ovens

No part of this website or content thereof may be reproduced, distributed or transmitted in any form or by any means, nor may any part of this website be stored in a database or other electronic retrieval system, or any other website, without the prior written permission of Forno Bravo, LLC.


Powered by vBulletin® Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.5.2
© 2006/10 Forno Bravo, LLC