#1  
Old 01-21-2008, 12:42 PM
Archena's Avatar
Il Pizzaiolo
 
Join Date: Apr 2007
Location: Alabama
Posts: 1,208
Default Plumbing Question

I need to replace everything from the water supply valve on up on the toilet. I hadn't bothered before now because we were still trying to get the septic tank dealt with - and having the toilet shut off meant I couldn't accidentally over flow the bowl.

Well, one pumping, four weeks trying and failing to get a repair estimate, one repairman's evaluation (different contractor - if you're ever in need of septic repair in Alabama I know just the guy you need!) and a plumber later and the bowl flushes properly - on a side note, a shirt is not an adequate substitute for a seal between the pipe and the septic tank Name:  Group One - Pictures 645.gif
Views: 228
Size:  5.5 KB. So now it's time to repair the rest of the toilet.

Okay, I read all the directions and I think I can do this (it's a girl thing - we are genetically programmed to read the instructions). but it has been really, really cold down here and will be pretty cold the rest of the week (it snowed! It is not supposed to snow in Alabama!!!) so I'm wondering if it would be best to wait until it's warmer. All the parts I'm working on are in the house but I'm going to be replacing the water supply valve which is just barely in the house (stupid wannabe plumber stuck the thing almost into the subfloor. Well, at least this one turns ) which worries me some.

Whatta you guys think? Wait for warmer weather or go for it?
__________________
"He is no fool who gives what he cannot keep to gain what he cannot lose." - Jim Elliot

"Success isn't permanent and failure isn't fatal." -Mike Ditka
[/CENTER]
Reply With Quote
  #2  
Old 01-21-2008, 03:37 PM
christo's Avatar
Master Builder
 
Join Date: Feb 2006
Location: Eastern NC
Posts: 910
Default Re: Plumbing Question

Go for it!!!
__________________
My oven progress -

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #3  
Old 01-21-2008, 05:12 PM
brokencookie's Avatar
Journeyman
 
Join Date: Oct 2007
Location: Pacific Northwest
Posts: 376
Default Re: Plumbing Question

Have at it. I am currently replacing the floor, subfloor, toilet and water damaged joists in the only bathroom in my house. The outside temp is about 34 degrees so the cold air under the house encourages me to work quickly. That and the fact I have to remount the toilet every 3 or 4 hours so it can be used. The job is really pretty simple. Just tiresome.

Bruce
Reply With Quote
  #4  
Old 01-21-2008, 05:35 PM
Dutchoven's Avatar
Master Builder
 
Join Date: Apr 2007
Location: Mississippi
Posts: 931
Default Re: Plumbing Question

I thought I was the only one doing bathroom remodeling...I think you'll be OK Archena...I cut a hole in a bedroom wall to take out the original bathtub in our house...tore out 1 inch thick cement walls that were screeded on like stucco...replaced all the tile(walls and floor)...tomorrow finish up tiling then grouting...then new vanity, sink and toilet install...Oh by the way I recommend get the taller toilet...even if you are shorter the extra 2 inches is great on the knees...well maybe not a good idea if you have very young children though
Good luck everyone!
Dutch
__________________
"Making the simple complicated is commonplace; making the complicated simple, awesomely simple, that's creativity. " Charles Mingus
"Build at least two brick ovens...one to make all the mistakes on and the other to be just like you dreamed of!" Dutch
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Dough Hydration question james Hearth Bread and Flatbread 21 12-01-2007 02:12 PM
Artigiano question... johnrbek Modular Refractory Oven Installation 9 02-20-2007 09:35 PM
Pouring Hearth Question telehort Getting Started 7 01-29-2007 09:20 AM
Oven Kit Question :confused: mrpbjnance Modular Refractory Oven Installation 3 04-18-2006 11:08 AM
Construction of Chimney question dmun Design Styles, Chimneys and Finish 0 07-18-2005 08:08 AM


All times are GMT -7. The time now is 12:06 PM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC