Old 08-13-2014, 04:17 AM
Serf
 
Join Date: Aug 2014
Location: Utah
Posts: 1
Default basic construction

We have hired a mason to construct a structure to contain a newly purchased Premiio 2 G oven purchased from Forno Bravo. He assured us of his credentials and came recommended by a major local brick supplier, The oven is being bulit in Northern Utah which experiences cold and snowy winters.
The builder poured a concrete basd that goes down below frost line but did not use rebar either in the base or as vertical support. He built a brick shell and is now filling the inside with cinder block to form the base.
A-ha! Now comes to our house a neighbor friend whose career before retirement was masonry. He is disdainful of the construction and is confident that without rebar reinforcement our base and oven will not be durable. The mason initially stated he did use rebar but his worker later "confessed" that this is not so.
Any suggestions on how to proceed would be appreciated. Is the rebar necessary?
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Ultimate Pizza Oven construction? Joe Baker Tools, Tips and Techniques 7 05-15-2013 09:43 AM
Vent Opening Size and Construction lhuhn Pompeii Oven Construction 5 10-14-2010 01:10 PM
Igloo construction question thamnophis Other Oven Types 0 07-30-2010 11:38 AM
Le Panyol construction and Stability MAINEWOODHEAT Getting Started 16 10-28-2009 11:51 AM
Radial Oven Construction armac Pompeii Oven Construction 4 08-03-2006 09:16 PM


All times are GMT -7. The time now is 05:30 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
© 2006/10 Forno Bravo, LLC