Default Wetting the Bricks

I have a couple questions concerning my oven build. Firstly, I know that prior to setting brick with mortar, the bricks should be wet. Question is, HOW wet? Is a quick dip good enough? Or maybe a 30 second soak? Or should they be totally saturated?
Secondly, as far as laying the bricks for the cooking floor; can the sand/clay mix be left dry, or must it be mixed with water?
I appreciate any wisdom you all may care to share.

Steve
Reply With Quote
  #2  
Old 06-22-2010, 06:24 AM
Ken524's Avatar
Il Pizzaiolo
 
Join Date: May 2007
Location: Kentucky
Posts: 1,650
Default Re: Wetting the Bricks

Steve,

When you start laying bricks, drop several in a big bucket of water and let them soak until they stop bubbling. Usually 4 or 5 minutes will do it. The idea is to saturate the bricks with water so they don't suck the moisture out of the mortar before it cures.

Lay your floor bricks on dry sand/clay.

Good luck with your build!
__________________
Ken H. - Kentucky
42" Pompeii


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Updated!


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
...
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
...
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #3  
Old 06-22-2010, 06:25 AM
Brent Woo's Avatar
Serf
 
Join Date: Jun 2010
Location: California
Posts: 3
Default Re: Wetting the Bricks

Quote:
Originally Posted by Evets View Post
I have a couple questions concerning my oven build. Firstly, I know that prior to setting brick with mortar, the bricks should be wet. Question is, HOW wet? Is a quick dip good enough? Or maybe a 30 second soak? Or should they be totally saturated?
Secondly, as far as laying the bricks for the cooking floor; can the sand/clay mix be left dry, or must it be mixed with water?
I appreciate any wisdom you all may care to share.

Steve
Personally, I would give the bricks at least a 30 second soak. I go with soaking till the bubbles stop. In keep a 5 gallon bucket nearby, grab a couple and stick them in as I lay the mortar on the bricks I just took out. The bucket also comes in handy in removing any extra mortar off your hands or tools.

Brent
Reply With Quote
  #4  
Old 06-22-2010, 06:56 AM
Laborer
 
Join Date: Nov 2009
Location: Lancaster Co., Pa.
Posts: 55
Default Re: Wetting the Bricks

Great! Thanks! I'm glad you said DRY sand/clay is ok, because that's what I already did!
Reply With Quote
  #5  
Old 06-22-2010, 07:16 AM
Tscarborough's Avatar
Il Pizzaiolo
 
Join Date: Oct 2009
Location: Ausitn
Posts: 3,143
Default Re: Wetting the Bricks

Surface saturated dry is what you want. Do not soak the brick, but dip them.
Reply With Quote
  #6  
Old 06-29-2010, 09:09 AM
Laborer
 
Join Date: Aug 2009
Location: Columbus OH
Posts: 95
Default Re: Wetting the Bricks

looks like this is a very controversial topic. Saturated bricks slide and need support, seems like fairly dry bricks stick much easier. Some people say dry bricks will suck too much water from the mortar and render it weak, some people say the opposite is true.

The truth is out there...
__________________
my own Quest for Fire:

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #7  
Old 06-29-2010, 09:32 AM
Tscarborough's Avatar
Il Pizzaiolo
 
Join Date: Oct 2009
Location: Ausitn
Posts: 3,143
Default Re: Wetting the Bricks

It is not controversial to those in the masonry industry. Here is the relevant section in the standard specification:

A. Wetting Brick:
1. Wet brick with absorption rates in excess of 30 g./30 sq. in./min. (30 g./194 cm2/min.) determined by ASTM C 67, so that rate of absorption when laid does not exceed this amount.

2. Recommended procedure to insure that brick are nearly saturated, surface dry when laid is to place a hose on the pile of brick until the water runs from the pile. This should be done one day before brick are to be used. In extremely warm weather, place hose on pile several hours before brick are to be used.



Firebrick are on the high end of the absorption scale, and in the context of laying brick at home, i.e. slowly, it is not practical to use the described method. The best way to do it is to briefly dip the brick into a bucket of water or mist it prior to laying it.
Reply With Quote
  #8  
Old 06-29-2010, 09:35 AM
Derkp's Avatar
Apprentice
 
Join Date: Apr 2010
Location: Utah
Posts: 188
Default Re: Wetting the Bricks

I agree with tscarborough, wet the bricks by dipping of spraying them. My bricks had years of grime on them and I power washed most of them as I installed them. If the bricks were too wet the mortar did not stick well. After I washed them I let them set until I could climb up and set them, the surface was not soaked but moist the mortar worked great. They seemed to dry out very quickly in direct sun, 85 degrees plus.

Derk
Reply With Quote
  #9  
Old 06-29-2010, 09:53 AM
Laborer
 
Join Date: Aug 2009
Location: Columbus OH
Posts: 95
Default Re: Wetting the Bricks

maybe the ebook should be updated with this info. Thanks so much for the detailed explanation! Some of my bricks soaked for days.. now I am worried a bit.
__________________
my own Quest for Fire:

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #10  
Old 06-29-2010, 10:09 AM
Tscarborough's Avatar
Il Pizzaiolo
 
Join Date: Oct 2009
Location: Ausitn
Posts: 3,143
Default Re: Wetting the Bricks

No worries, just put them in the sun. Since they have a high rate of absorption they also have a high rate of moisture loss.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
My brick cutting tool. SCChris Tools, Tips and Techniques 8 02-21-2011 09:07 PM
High duty fire bricks Abear Getting Started 23 04-02-2010 11:43 AM
About to lay floor bricks Wheels1974 Newbie Forum 9 12-15-2009 03:55 AM
How bad are cement bricks? zeek General Building and Construction 6 10-07-2009 11:54 PM
Shipping Bricks cplain Humor 1 06-12-2008 04:40 AM


All times are GMT -7. The time now is 07:03 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC