| My hearth currently lies 5.5" below the oven floor: 3" InsBlock + 2.5" firebrick. My current plan is to surface the hearth with 1/2" (ish) 12" granite tiles from HD. Quick side question: is that kind of tile thick enough to withstand an external application or do I need a real granite "slab"? So, assuming I want the hearth to be a shave lower than the oven floor (so rain doesn't flow in), that's a target height of about 5" which minus the granite is a residual 4.5" of "fill". My plan is to pour concrete up to that base of the granite, so about 4.5" concrete on top of the current hearth. At the same time I will be extending the hearth to one side some to make a staging area. That side area will be supported by a second low wall, just like the original four-block high base. But, to finally come to my original question, I'm also considering extending the hearth out from the front a bit, i.e., having this additional concrete slab hang over the original hearth "into the air" about eight inches (remember it'll be about 4.5" thick, maybe 4", I don't know). So I'm thinking I'll just suspend some 3/8" rebar throughout the poured area such that the rebar crosses the edge of the overhang in a few places. Likewise, the rebar will tie the extended side table (and side wall) into the new poured slab in one solid piece. Does this sound about right or are there more serious concerns? Do I need to brace the concrete from the bottom for example, or should I use 1/2" rebar perhaps. Thoughts? Thanks.
__________________ Website: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. WFO Webpage: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. Thread: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#2
| ||||
| ||||
| Is a lack a response an indication of a dumb question. ![]() i.e., bump.
__________________ Website: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. WFO Webpage: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. Thread: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#3
| ||||
| ||||
| Well, I don't know about a dumb question, but I'm going to have a small (about 12") cantilever on my barrel stove. I've got a building that I'll be using as a kitchen and have built the oven about 6 inches away from the building. It took 4 1/2 courses of block to get me up to the floor level of the building. The cantilever will extend through the wall far enough to give something solid to lay the interior brick work on so it will be flush with the finished interior wall. I'll be pouring the block cores and using 1/2" rebar in the vertical cores next to the building, and then extending the concrete into the building with 1/2" rebar tied horizontally to the vertical supports. Then, the build continues upward with most of the mass being supported on the existing vertical wall. |
|
#4
| ||||
| ||||
| I think the question was about adding a cantilever to an existing slab, and I think the silence was a response to not knowing the answer. Maybe a sketch or drawing would clarify the question?
__________________ My geodesic oven project: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. , To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#5
| |||
| |||
| Keith - this has been done by a few folks here. Here's the one that I first saw and that I copied on my build: http://www.fornobravo.com/forum/21/b...html#post39885 (The Badger Build) I raised the existing slab several inches and added a ~3" cantilever. I then put a granite slab on top of that (which overhangs about 1.5"). I arranged my rebar in a similar fashion to the photos above, though I had two pieces across the front rather than one. S |
|
#6
| ||||
| ||||
| Oh. The way sjmeff did it looks solid, with the rebar going farther back like that. |
|
#7
| ||||
| ||||
| Fair enough, I'll get back to you. Thanks.
__________________ Website: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. WFO Webpage: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. Thread: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#8
| |||
| |||
| Keith, Short answer (well short for me anyway). Easy to do, just keep in mind that concrete is good in compression and poor in tension. So place your rebar in the top 1/4 to 1/3 of the slab as in your cantilever that is where the tension lies. Placing it in the center (the force neutral area) works to hold the cracked/broken pieces together but otherwise is far less efffective in actually preventing a break in the first place. As for quantity of rebar, more is better and if you can, bend a hook in the ends. Or if you have access to a welder weld a piece of rebar across the ends of the extending rebar. This will not only be stronger but easier to orient in the slab and hold in position while pouring the slab. Hope this helps, Wiley |
|
#9
| ||||
| ||||
| Is 3/8" rebar sufficient for a six to eight inch overhang or should I use 1/2"?
__________________ Website: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. WFO Webpage: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. Thread: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#10
| |||
| |||
| You can probably get by with 3/8 inch (especially if you are bending hooks in the ends) More important is how many pieces and their position in the finished slab, personally (as in what I would do if I were doing it) I would not use less than a piece every 12 inches and would think more on the order of every 8 inches would be better. And like I said in the top 1/4 to 1/3 of the slab. If this was Haiti then you wouldn't use any at all. The Haitian method would work, well sort of, for a while, until it didn't. Rebar is fairly inexpensive and so I would err on the side of "more". I tend to over build. But then in case of earthquake I expect it to be there afterward. Hope this helps, Wiley |
![]() |
| Thread Tools | |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Alternatives to concrete hearth | kebwi | Pompeii Oven Construction | 9 | 09-02-2009 08:58 PM |
| Concrete for the hearth slab. | I burnt my fingers | Getting Started | 6 | 08-23-2009 08:46 AM |
| Concrete mixer basics | dmun | Getting Started | 11 | 06-05-2009 05:48 PM |
| Alternative to concrete block foundation | ekah | Getting Started | 6 | 12-02-2008 06:56 AM |
| Curing Concrete and Masonry | Xabia Jim | Tools, Tips and Techniques | 21 | 03-31-2008 02:15 PM |