Default Pour two slabs at once?

Hi all,

I'm hoping to pour here in the next few weeks, thanks all for participation on this forum, it's invaluable!

Here's a thought. I'm considering a truck pour in a few weeks. How outrageous would it be to have the foundation slab _and_ hearth base poured at the same time?

I'm planning to frame the hearth base, resting it on 4 x 4s on the ground nearby, where I'll screed, finish, level and cure......A couple (?) weeks later I'll use my front end loader to web sling it onto my block supports?

It'd be a gentle operation but I feel it could be done properly and safely with a few extra bodies....

I see a possible savings of several hours and it takes advantage of having the truck in place.....once....., as a newbie I should ask: ."...what am I missing here?"
__________________
Tweb
Reply With Quote
  #2  
Old 09-18-2012, 08:38 PM
lwood's Avatar
Master Builder
 
Join Date: Jul 2009
Location: philippines
Posts: 642
Default Re: Pour two slabs at once?

The perlcrete mix is a little strange to work with but it may be possible. Better have the first slab well supported.
__________________
Our Facebook Page:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #3  
Old 09-19-2012, 12:33 AM
GianniFocaccia's Avatar
Il Pizzaiolo
 
Join Date: Jun 2009
Location: Disneyland, CA
Posts: 1,409
Default Re: Pour two slabs at once?

As long as you have the lift, it sounds like a practical project. I would pour the support slab with 90 degree bends in the rebar (pointing down) around the perimeter. This way when you lower your slab onto your blocks the rebar drops into the top-most concrete-filled course.
Reply With Quote
  #4  
Old 09-19-2012, 01:21 AM
lwood's Avatar
Master Builder
 
Join Date: Jul 2009
Location: philippines
Posts: 642
Default Re: Pour two slabs at once?

Why not pour it in place?
__________________
Our Facebook Page:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #5  
Old 09-19-2012, 02:06 AM
brickie in oz's Avatar
Il Pizzaiolo
 
Join Date: Mar 2009
Location: Whittlesea
Posts: 3,455
Default Re: Pour two slabs at once?

Quote:
Originally Posted by Tomweb View Post

I see a possible savings of several hours
...what am I missing here?"
Your going to risk your build for a couple of hours?
What am I missing here?
__________________
The English language was invented by people who couldnt spell.


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #6  
Old 09-19-2012, 02:18 AM
Serf
 
Join Date: Aug 2012
Location: Maryland
Posts: 13
Default Re: Pour two slabs at once?

Iwood, My reasoning has to do with efficiency. I figure while the truck's here I'll go ahead and double pour.
You also bring up a point of discussion regarding your perlcrete comment

Quote:
The perlcrete mix is a little strange to work with
My approach was going to be hearth slab followed by insulation layer, I better drop back and review suggested techniques.

John, thanks for the bent rebar suggestion, I like that idea!
__________________
Tweb
Reply With Quote
  #7  
Old 09-19-2012, 04:35 AM
Apprentice
 
Join Date: Mar 2011
Location: Bucks County, PA
Posts: 247
Default Re: Pour two slabs at once?

sounds ambitious!

1. Did you estimate the weight?

2. Once you drop the slab on top of the foundation, how will you get the slings out from underneath?

3. Is your hearth slap just the pearlite mixture? Doesn't seem structural even with the rebar. Or will you have a structural slab supporting a pearlite mix?

4. Can your front end loader "reach" far enough to center the slab over top of your foundation base?

Gut reaction is not to rush it and do it in two pours.

I had a truck pour my foundation...and I used bags for the hearth.

Last edited by jeeppiper; 09-19-2012 at 04:44 AM.
Reply With Quote
  #8  
Old 09-19-2012, 04:56 AM
Gulf's Avatar
Il Pizzaiolo
 
Join Date: Sep 2011
Location: Mississippi
Posts: 1,579
Default Re: Pour two slabs at once?

Quote:
Originally Posted by Tomweb View Post
I'm planning to frame the hearth base, resting it on 4 x 4s on the ground nearby, where I'll screed, finish, level and cure......A couple (?) weeks later I'll use my front end loader to web sling it onto my block supports? "

I would form 4 pad eyes out of rebar and wait at least 28 days before placing it. The hearth slab will be much stronger then and considerably lighter. After placement, the pad eyes could be cut off even with the slab.
__________________

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #9  
Old 09-20-2012, 06:55 PM
Serf
 
Join Date: Aug 2012
Location: Maryland
Posts: 13
Default Re: Pour two slabs at once?

Bricke- Iwood- Gulf- Jeepiper!

All good questions…..here’s what I figure.

With _great_respect and admiration for all who have completed the task and are enjoying the fruits of their labors……I don’t think I’m risking my project to save two hours. If, after discussion and serious consideration this idea is flawed, I’ll drop back and make two separate pours. Don’t we all look at our tasks and projects with an eye towards efficiency whenever possible?….If I can have the hearth slab in place, ready for an insulating layer and firebrick after a month, I’ll be stoked! (Pun intended...)

First, my plan is to pour a concrete hearth slab with an insulating layer over that, either a perlcrete mix or appropriate foil faced foam boards

Second, regarding weight: I have calculated the following: My 6 x6 x 4” hearth slab measures out at about 12 cubic ft and will run about 1700 lbs ( Yes, my loader will handle load and reach…but very good questions)

Here are my weight calculations, based on SakreteWould not a poured mix be very close in weight?...I'll call the delivery guys and ask that one...) 80# bag of Sakrete is .6 cu ft… 12 cu ft would require.20 bags = 1600 lbs + rebar…. I’m thinking 5/8”, probably 5- 6ft pieces and 5 -7’ pcs for a total of 65 ft @ 1+ lb / linear ft = 70 #
Gulf - good thought on curing time. I knew it could use a good, damp couple of weeks. Of all the caution I exercise, letting the slab cure properly is my best bet to avoid a fracture on sling day…….btw your album is awesome, I’ve been through it a number of times to try and know what I think I know….. and will return again, I’m sure!

Quote:
Once you drop the slab on top of the foundation, how will you get the slings out from underneath?)
...............Jeepiper. I hope I don’t “drop” the slab at all!!! I figure load slings in two places that’ll allow me to set it in place, supported by the extended rebar….right? As this slab is gently set in place I plan to pull the straps out from around the slab. I’ll lower the bucket and the web slack will allow me to pull the straps, as there will be approximately a 1” gap between hearth slab and supporting block.

You all are great….Thank you for helping me work through this again in my head. I’ll keep you posted and stay in touch! Many thanx!
__________________
Tweb
Reply With Quote
  #10  
Old 09-20-2012, 11:55 PM
brickie in oz's Avatar
Il Pizzaiolo
 
Join Date: Mar 2009
Location: Whittlesea
Posts: 3,455
Default Re: Pour two slabs at once?

Quote:
Originally Posted by Tomweb View Post
appropriate foil faced foam boards
It'll melt.
__________________
The English language was invented by people who couldnt spell.


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Durock platform for hearth pour Phxdt Getting Started 14 06-10-2012 12:56 PM
pour hearth and stand cores at same time? jimkramer Pompeii Oven Construction 3 09-22-2010 05:01 AM
Before I pour...hearth question Pizza Freak Getting Started 7 05-21-2008 12:59 PM
solid pour foundation and stand fsucpa Newbie Forum 15 11-11-2007 06:28 PM
Insulating hearth pour & outskirts of oven footprint? waynebergman Getting Started 8 08-29-2007 06:12 PM


All times are GMT -7. The time now is 07:41 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC