#1
| |||
| |||
| Ok, so I've cut the 1/2 bricks for the first couple of courses; using sailors (soldiers laying down). I've run into a problem. I've made my homebrew 3:1:1:1 and the consistency seems great. It helps that the weather is in the 70s. I've wet my bricks (dipped in water for a few minutes) and then drain for a couple of minutes. Thought everything was going well. Then comes the time to put the mortar to the bricks. I start at the back center. Put brick against indispensable tool, put brick into position - yeah - this seems easy enough. Get next brick, slap some homebrew on the side; shave the extra off the top and bottom, slide corner next to first brick with positioning assistance of I-tool. Two down - this is going to be easy. Or at least that's what I thought. Third brick same process, but as I slide the brick against brick two, the assembly of three bricks moves/slides -oops. Grab first brick in left hand and third in right and slide back in to position. Fourth brick - wind up with a small crack between brick 2 and mortar. Tried to squeeze it back together. Will this still be a strong joint? Probably doesn't matter on sailor course, but I figure it will happen again on later courses. Should I be taking it apart and redoing it? It also happened at other joints as I added more sailors. It took me an hour to do the first half of the first course. I'm sure I'll get more adept at it, but want don't want to build inherently weak interfaces. Any good videos out there of the bricks being mortared and positioned? Thanks for your help! Jeff |
|
#2
| ||||
| ||||
| Quit soaking the brick. Unless it is 90 degrees plus and windy it is not needed or desirable. The mortar should grab within seconds. |
|
#3
| ||||
| ||||
| Any bricks that move after initial lay should be cleaned and relaid. |
|
#4
| |||
| |||
| Slow down, it took me over 6 hours to do a course.. I would continue to soak the brick.. i find the grab is stronger once the mortar has dried a little more.... if the brick is dry it sucks the water from the mortar and doesnt take hold. |
|
#5
| ||||
| ||||
| A Sailor is a brick laid with the bed face showing when the brick is standing up, the way the bricks are laid in a dome is a header course. And I wouldnt wet them, there is no need, all you will do is make the grab take longer, hence your problem.
__________________ All the best, Al To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. Last edited by brickie in oz; 10-09-2011 at 11:49 PM. |
|
#6
| |||
| |||
| Are you showing mortar between the bricks, on the inside? The bricks should be as like the base as possible, ie laid touching without mortar. There are several mortar mixes, the best is the grainey high temperature refectory mix which comes in a bag, just add water. a cheaper compromise is a lime mixed with clay, but if there is portland cement in there you will probably find it crumbling into your pizzas |
![]() |
| Thread Tools | |
| Display Modes | |
| |
Similar Threads | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Keeping me and my oven dry. | Faith In Virginia | General Building and Construction | 2 | 07-08-2011 05:37 PM |
| Keeping cement moist and fire starters | kirakat | Tools, Tips and Techniques | 3 | 06-20-2011 01:30 PM |
| Keeping Concrete out of Cells | jamesdifede | Pompeii Oven Construction | 4 | 11-02-2007 09:54 AM |
| curing and keeping dry | sharone | Firing Your Oven | 1 | 10-26-2007 02:00 PM |
| Keeping pizza hot | james | Pizza | 0 | 03-06-2006 10:30 PM |
All times are GMT -7. The time now is 12:28 PM.
Powered by vBulletin® Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
Search Engine Friendly URLs by vBSEO 3.6.0
© 2006/10 Forno Bravo, LLC









Linear Mode