Default How long before weatherproof layer?

I completed my vermicrete layer last Saturday and was just wondering when would be a safe time to apply the acrylic stucco weatherproof layer?
I was hoping to do it this Saturday. Would this be too soon (7 days)?
Reply With Quote
  #2  
Old 10-21-2008, 06:03 AM
Dutchoven's Avatar
Master Builder
 
Join Date: Apr 2007
Location: Mississippi
Posts: 931
Default Re: How long before weatherproof layer?

Balthazar
I wouldn't think that is too soon...I say go for it...that vermicrete stays moist for some time which should only help the layers to bond together better!
All the best!
Dutch
__________________
"Making the simple complicated is commonplace; making the complicated simple, awesomely simple, that's creativity. " Charles Mingus
"Build at least two brick ovens...one to make all the mistakes on and the other to be just like you dreamed of!" Dutch
Reply With Quote
  #3  
Old 10-22-2008, 03:10 AM
david s's Avatar
Il Pizzaiolo
 
Join Date: Mar 2007
Location: Townsville, Nth Queensland,Australia
Posts: 4,881
Default Re: How long before weatherproof layer?

I don't entirely agree. When you do the vermiculite layer it takes A LOT of water.Given that 1 litre of water= 1000 litres of steam, that can contribute to an enormous amount of pressure on your outer stucco layer. Why not wait at least a week to let the vermiculite layer lose some of its water (you don't need strength here, the cement is only needed to hold the mixture in place) then do your curing fires to eliminate more water, then apply the final stucco. Am I being too cautious ? I don't like cracks on the outershell.
Reply With Quote
  #4  
Old 10-22-2008, 03:23 PM
Journeyman
 
Join Date: Jun 2008
Location: Melbourne Australia
Posts: 399
Default Re: How long before weatherproof layer?

My call would be dry it out first then the render.
Reply With Quote
  #5  
Old 10-23-2008, 01:15 AM
Peasant
 
Join Date: Sep 2008
Location: Melbourne, Australia
Posts: 45
Default Re: How long before weatherproof layer?

Thanks guys. Well by this Saturday, it will be a week since I did the vermicrete layers, and yes, I did use a lot of water, so perhaps I should leave it another week? That will make it two weeks drying in fair to warm conditions.
Reply With Quote
  #6  
Old 10-23-2008, 04:27 AM
david s's Avatar
Il Pizzaiolo
 
Join Date: Mar 2007
Location: Townsville, Nth Queensland,Australia
Posts: 4,881
Default Re: How long before weatherproof layer?

Have you started lighting some fires in it yet ?
Reply With Quote
  #7  
Old 10-23-2008, 04:37 AM
Peasant
 
Join Date: Sep 2008
Location: Melbourne, Australia
Posts: 45
Default Re: How long before weatherproof layer?

Nope...not yet. I thought I would let it dry out, then do the stucco layer, let that dry and then start firing it.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Soaking your bricks - how long? pizzahead Pompeii Oven Construction 4 10-08-2008 02:16 PM
2- layer Hearth question dkoenig Newbie Forum 11 06-23-2008 04:31 PM
Vermiculite Layer - Does it EVER dry???? JoeT62 Tools, Tips and Techniques 0 09-09-2007 08:20 AM
use firecement mixed with sand for the insulating layer ? Dr.Pizza Getting Started 9 05-25-2007 04:05 AM
How Long Will Your Pizza Oven Last? james Getting Started 0 06-19-2006 12:29 PM


All times are GMT -7. The time now is 01:54 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC