| Pizza Ovens | (800) 407-5119 | Info@fornobravo.com |
![]() |
| |||||||
| | LinkBack | Thread Tools | Display Modes |
|
#1
| |||
| |||
| started a few weeks ago but had to slow down to let the building dept catch up |
|
#2
| ||||
| ||||
| Off-topic, but what is the surface of the bocce court? I like to play, but the game sure has an element of randomness when playing on a grass lawn.
__________________ -David My Oven Thread: To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#3
| |||
| |||
| its stone dust now, I plan to use har-tru - which is a "clay" tennis court material but have not gotten around to it. Under the 2 inches of stone dust is 8 inches of compacted pack and then 8 inches of 5/8 clean gravel - needless to say it drains well. I will post some shots if folks don't mind the off topic. also failed to mention, the best way to keep your footings from drying to quick it to get 6 inches of rain the night after the pour |
|
#4
| ||||
| ||||
| Hey - a bit off topic, but what size did you make your Bocce Court? |
|
#5
| ||||
| ||||
| I agree, give us more details about the Bocce Court!
__________________ Mike - Saginaw, MI To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts. |
|
#6
| |||
| |||
| I posted the bocce info and pics under the general building and construction section. My court is 60 by 11 and if I had to do it again I would go to at least 72 because 60 is a little short for good players Here is the link for those who don't normally venture to that part of the site http://www.fornobravo.com/forum/f39/...uild-7629.html (Bocce Court Build) Last edited by tifosi; 08-20-2009 at 12:25 AM. |
|
#7
| |||
| |||
| Finally got the inspector out today, he was fine with the footings so I am good to start filling the hole back in. After that I plan to do the paver patio first and then finally can start to work on the hearth |
|
#8
| ||||
| ||||
| In that one pic it looks like you were building a see ment pond |
|
#9
| |||
| |||
| yeah, it was a bad rain storm a few weeks back, my house got hit by lightning the same night |
|
#10
| |||
| |||
| Finally made some more progress, I was able to back fill the foundation and finish the last course of block. Unfortunately I need to complete the paver patio before starting on the hearth slab |
| Thread Tools | |
| Display Modes | |
| |
| | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Why Italian Wood-Fired Ovens are Round | james | Newbie Forum | 39 | 03-08-2010 06:01 AM |
| Oven Curing | james | Firing Your Oven | 140 | 02-12-2010 09:52 PM |
| All things being equal | Lester | Newbie Forum | 13 | 12-21-2009 08:26 AM |
| How much did it cost to build your oven? | fullback66 | Getting Started | 38 | 03-22-2009 04:14 PM |
| advice needed on time needed to build oven dome | builder brad | Pompeii Oven Construction | 28 | 08-13-2008 10:51 PM |