#1  
Old 09-24-2010, 06:10 PM
trapper's Avatar
Peasant
 
Join Date: Aug 2010
Location: Northern Ontario
Posts: 38
Default Breaking ground/rock and pouring the pad

The first day I started I was able to clear away the little amount of top soil I had for my pizza oven location ( 42" Tuscan). Since the bed rock is at the surface I should get no movenment. I had to dig out lots of rock to allow for 3" of gravel. I think I may try to use some of the rocks I dug out for the oven arch or cover the block wall. I had to wait a few days for the weather to clear before I poured the pad. The mixer in the back (home made) didn't work so I had to hand mix 36 bags of ready-mix by hand. The beer sure tasted good while I sat back and watched the pad cure.

The block wall and hearth will be assembled and poured in a couple of weeks during our Canadian Thanksgiving weekend.

Cheers.
Attached Thumbnails
Breaking ground/rock and pouring the pad-pizza-oven-058.jpg   Breaking ground/rock and pouring the pad-pizza-oven-062.jpg   Breaking ground/rock and pouring the pad-pizza-oven-066.jpg  
__________________
Live life like you're dying....without going bankrupt
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #2  
Old 09-24-2010, 06:45 PM
Tscarborough's Avatar
Il Pizzaiolo
 
Join Date: Oct 2009
Location: Ausitn
Posts: 2,991
Default Re: Breaking ground/rock and pouring the pad

If you were able to dig out rock it is not bedrock, it is rubble or shelf rock. Hopefully, you took care to compact the fill in those areas.
Reply With Quote
  #3  
Old 09-25-2010, 10:24 AM
trapper's Avatar
Peasant
 
Join Date: Aug 2010
Location: Northern Ontario
Posts: 38
Default Re: Breaking ground/rock and pouring the pad

Actually it was bed rock at one time but the top 6" were loosened from ages or freeze thaw. Most of the pad sits on 3" to 6"of well tamped gravel on top of very solid bedrock. She's not going to move in my life time.

Cheers.
__________________
Live life like you're dying....without going bankrupt
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #4  
Old 09-25-2010, 10:26 AM
Tscarborough's Avatar
Il Pizzaiolo
 
Join Date: Oct 2009
Location: Ausitn
Posts: 2,991
Default Re: Breaking ground/rock and pouring the pad

Perfect! You have the hard part done, then.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Pouring the hearth C5dad Newbie Forum 3 12-23-2010 09:01 PM
Cleaning up concrete after a long day of pouring kebwi Tools, Tips and Techniques 7 09-22-2009 07:57 PM
Pouring the suspended slab and core fillinh at the same time? 3G_ Tools, Tips and Techniques 1 08-30-2009 09:55 AM
Question On Pouring Concrete Into Blocks DaveDQ Getting Started 5 07-29-2008 07:54 AM
Pouring Hearth Question telehort Getting Started 7 01-29-2007 09:20 AM


All times are GMT -7. The time now is 08:27 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC