8/9/13 – 8/11/13 We are almost finished with our 42” Pompeii oven build, so I can take time, reflect on what went well, what didn’t and share some photos for those planning or getting started with their own projects. Below are photos of the pre-pour footings, vapor barrier and rebar, and also the finished support slab. My wife mixed the concrete in a borrowed concrete mixer, and I wheel barrowed it down the hill to the oven location. Don’t under estimate the amount of effort, time and materials for this simple beginning.
Attached Thumbnails
Avocado Country 42" Pompeii-1a.jpg   Avocado Country 42" Pompeii-1b.jpg  
Reply With Quote
  #2  
Old 11-01-2013, 03:52 PM
Peasant
 
Join Date: Aug 2013
Location: Temecula,CA
Posts: 44
Default Re: Avocado Country 42" Pompeii

8/12/13 – We dry stacked the concrete blocks as per the Forno Bravo plans. We decided to section off the back half of the oven support stand, just didn’t need that much space for little critters to set up shop in. We filled every other block cell with concrete for strength. We then used Hardibacker cement board that set on the blocks, without covering the holes, as the slab support form. It was cheaper than doing a lot of plywood forming, and we could just leave it in place after the slab pour, no form stripping required. (1c)
Attached Thumbnails
Avocado Country 42" Pompeii-1c.jpg  
Reply With Quote
  #3  
Old 11-01-2013, 03:56 PM
Peasant
 
Join Date: Aug 2013
Location: Temecula,CA
Posts: 44
Default Re: Avocado Country 42" Pompeii

8/13/13 - Here you can see the Hardibacker cement board in place and the steel set for our 4” support concrete slab. We bought 1 piece of ¾” OSB board, cut it into 4 12” widths, then screwed it to the concrete blocks with concrete screws. The strips lapped the blocks by 4” and stuck up 8”. This allowed us to first pour a 3 ½” concrete support slab and then pour a 4 ½” perlite/cement insulating slab over the top. Again, lots of material and hard work, get help if you can.
Attached Thumbnails
Avocado Country 42" Pompeii-1d.jpg   Avocado Country 42" Pompeii-2.jpg   Avocado Country 42" Pompeii-3.jpg   Avocado Country 42" Pompeii-4.jpg   Avocado Country 42" Pompeii-5.jpg  

Reply With Quote
  #4  
Old 11-01-2013, 03:58 PM
Gulf's Avatar
Il Pizzaiolo
 
Join Date: Sep 2011
Location: Mississippi
Posts: 1,593
Default Re: Avocado Country 42" Pompeii

Quote:
Originally Posted by Rbhumbert View Post
8/9/13 – 8/11/13 ..............My wife mixed the concrete in a borrowed concrete mixer, and I wheel barrowed it down the hill to the oven location. Don’t under estimate the amount of effort, time and materials for this simple beginning.
Great advice on the "Don't under estimate......." By the way, it sounds like you've got a "keeper" there .
__________________

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #5  
Old 11-01-2013, 04:11 PM
Peasant
 
Join Date: Aug 2013
Location: Temecula,CA
Posts: 44
Default Re: Avocado Country 42" Pompeii

I am very lucky. My wife is of slight build but she picks avocados along side of me. This year after picking 36000 lbs of avocados then we tackled the ovenbuild.
Reply With Quote
  #6  
Old 11-01-2013, 04:19 PM
Peasant
 
Join Date: Aug 2013
Location: Temecula,CA
Posts: 44
Default Re: Avocado Country 42" Pompeii

8/23/13 - Herringbone oven fire bricks in place, attached with the fireclay mix recommended in the FB plans. Our oven dome will sit on top of the floor and any protruding floor firebricks will be concealed later. Same day we started laying out the dome. You can see in the picture our IT attached to a 3 piece wood floor and raised up on wood spacers so that the radius point starts at the same height as the top of the 1st course of solders bricks.
Attached Thumbnails
Avocado Country 42" Pompeii-7.jpg   Avocado Country 42" Pompeii-8.jpg   Avocado Country 42" Pompeii-9.jpg  
Reply With Quote
  #7  
Old 11-01-2013, 04:32 PM
Peasant
 
Join Date: Aug 2013
Location: Temecula,CA
Posts: 44
Default Re: Avocado Country 42" Pompeii

8/26/13 – Starting the dome with homebrew cement, 1 part Portand cement, 1 part lime, 1 part fireclay, and 3 parts #60 silica sand. All these materials were readily available and considerably cheaper then the refractory cement. Based on how much it took, I think I saved quit a bit of money and time. Many posters talked about running out of refractory cement and having to wait for another shipment. I just hope it holds up as well.
Attached Thumbnails
Avocado Country 42" Pompeii-11.jpg  
Reply With Quote
  #8  
Old 11-01-2013, 05:00 PM
hodgey1's Avatar
Journeyman
 
Join Date: May 2013
Location: NW Pennsylvania USA
Posts: 287
Default Re: Avocado Country 42" Pompeii

Looks great so far, can't wait to see the finished product!
__________________
Chris

Link to my photo album:

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


Link to my build:
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #9  
Old 11-01-2013, 05:45 PM
Peasant
 
Join Date: Aug 2013
Location: Temecula,CA
Posts: 44
Default Re: Avocado Country 42" Pompeii

8/27/13 – We really felt the key to a uniform dome shape was the IT tool perfected by so many others before us. Fortunately, I have a welder and can do a little welding, even if it is not pretty. I removed the wheel from an inexpensive caster, drilled a hole as close to the pivot center as possible and attached a turnbuckle and all thread. The IT tool worked out great, and any form of that tool that you can come up with is highly recommended.
Attached Thumbnails
Avocado Country 42" Pompeii-photo-2.jpg   Avocado Country 42" Pompeii-photo-4.jpg   Avocado Country 42" Pompeii-photo-3.jpg  
Reply With Quote
  #10  
Old 11-01-2013, 05:54 PM
Peasant
 
Join Date: Aug 2013
Location: Temecula,CA
Posts: 44
Default Re: Avocado Country 42" Pompeii

8/27/13 – Well we have made it to the dreaded dome/arch opening tie in. I looked at every posting I could find on FB about this, spend many nights awake, then chose one suggestion and drove in. Working with an old Mikita chopsaw with a diamond blade, a Skillsaw and grinder with diamond blades we moved forward with trial and error. We ended up with cutting the arch to fit the dome and it worked out well.
Attached Thumbnails
Avocado Country 42" Pompeii-12.jpg   Avocado Country 42" Pompeii-15.jpg   Avocado Country 42" Pompeii-16.jpg   Avocado Country 42" Pompeii-17.jpg   Avocado Country 42" Pompeii-18.jpg  

Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
My 42" Pompeii Oven build, Northeast Ohio boylanta Brick Oven Photos 203 07-19-2014 05:57 PM
Pompeii Nate's 42" Oven Build Pompeii Nate Pompeii Oven Construction 41 03-30-2013 04:40 PM
Pompeii 42" At last I have..... kriso Getting Started 9 11-08-2010 05:32 AM
40 inch corner install Pompeii oven (Country NSW) carneage Pompeii Oven Construction 29 10-11-2010 09:56 PM
Damian's 42" Tuscan Style Pompeii WFO Damian Introductions 3 09-21-2009 10:41 AM


All times are GMT -7. The time now is 10:53 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
© 2006/10 Forno Bravo, LLC