| Pizza Ovens | (800) 407-5119 | Info@fornobravo.com |
![]() |
| | |||||||
| | LinkBack | Thread Tools | Display Modes |
| ||||
| Interesting? But if its not in the brochure it may be a design change mid stream. Either to save on weight or on material (for them). Then again it may be a cavity to put rigid insulation. How thick is the actual floor where these cavities are? |
| ||||
| They look to be about 4 in deep on the sides so that would mean roughly about 1/3 the material is absent leaving 2 1/2 inches, correct? Also, who is the manufacturer? I don't see how insulation would be more effective that way - in fact, I'd think it would be less with the sides acting as heat sinks down to the slab. I'd bet on weight reduction being the reason (both for shipping and for construction) and that it should be set on an insulating base like a normal oven. The voids could be filled or not then.
__________________ "He is no fool who gives what he cannot keep to gain what he cannot lose." - Jim Elliot Looking for good bread recipes - made with almond flour... ![]() |
| |||
| [quote=Unofornaio;14468]Interesting? But if its not in the brochure it may be a design change mid stream. Either to save on weight or on material (for them). Then again it may be a cavity to put rigid insulation. How thick is the actual floor where these cavities are?[/QUOTE] The floor is 5-1/2" thick and the cavities are 1-1/2" deep. I've been storing the oven for over 25 yrs and the manufacturer is still in business but not making ovens anymore. My father in law is in Italy so I asked him to call them but they don't have anything on the oven any longer |
| |||
| Quote:
|
| |||
| Well I got side-tracked for a few weeks by starting the framing to my outdoor kitchen which I attached to the oven hearth. I plan on setting the oven floor tonight when I get home from work and I decided not to fill the cavities but since the floor is in 3 pieces, do I put mortar in between the joints or just dry fit them? After letting the base set, should the rest of the pieces be dry fitted also or should the be mortared? Once the oven is in place can I begin with some fires or should I wait till the framing with metal studs is complete and back filled with vermiculite? One last question, should the vermiculite be dry or 5-1mixture as in the hearth? Sorry for all the questions at one time but since I've been working on the kitchen, I got sidetracked but I've been thinking about all these things and need to get-er-done. Cheers, Dan |
| Thread Tools | |
| Display Modes | |
| |
| | ||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Oven Curing | james | Firing Your Oven | 78 | 07-22-2008 08:06 PM |
| All things being equal | Lester | Newbie Forum | 9 | 09-25-2007 06:38 PM |
| Tuscan and Naples designs | james | Pompeii Oven Construction | 2 | 02-21-2007 11:30 AM |
| Red Clay Brick Oven in the Philippine Islands | jayjay | Introductions | 1 | 11-06-2006 12:23 PM |
| Mediocre Pie weekend/Why were my pies all “dough-y?” | Fio | Pizza | 9 | 09-20-2006 09:20 PM |