Okay, this occurred to me a couple times and I haven't seen the answer. When do you begin the curing process? After the dome is finished but the insulation et al hasn't been done or after the oven is completely finished? It seems like people do it either way but I'm not sure.
__________________
"He is no fool who gives what he cannot keep to gain what he cannot lose." - Jim Elliot

"Success isn't permanent and failure isn't fatal." -Mike Ditka
[/CENTER]
Reply With Quote
  #2  
Old 06-11-2007, 06:20 AM
wlively's Avatar
Journeyman
 
Join Date: May 2005
Location: Spring Branch, TX 78070
Posts: 384
Default Re: Curing Question

I just posted on this topic on another thread.

I have been thinking it is much less stress on the brick to fire after insulation, because you do not have such a wide difference in temperature across the brick and invariably across the outside dome surface. It would be easy to take the blanket off or look under it to inspect for cracks after the cure, if you are so inclined.

I went ahead and fully insulated mine before firing. After 7 fires I do not have any cracks visible inside the dome.

Just a thought.
__________________
Wade Lively
Reply With Quote
  #3  
Old 06-11-2007, 06:24 AM
Archena's Avatar
Il Pizzaiolo
 
Join Date: Apr 2007
Location: Alabama
Posts: 1,212
Default Re: Curing Question

~nods~ Yup, you posted in the same thread that got me thinking about it again.

Thanks!
__________________
"He is no fool who gives what he cannot keep to gain what he cannot lose." - Jim Elliot

"Success isn't permanent and failure isn't fatal." -Mike Ditka
[/CENTER]
Reply With Quote
  #4  
Old 06-13-2007, 05:57 PM
nissanneill's Avatar
Il Pizzaiolo
 
Join Date: Apr 2007
Location: Adelaide, South Australia
Posts: 1,877
Thumbs up Re: Curing Question

I feel that if you are using only the insulating blanket, or bulk dry vermiculite or perlon, you could start curing once the dome is complete. However, if you are using vermiculite cement as an insulating medium, then that also must be dried out slowly.
I am currently curing my Pompeii oven. I have finished all of the brickwork and insulation, (1" blanket and 3 x 1" vermiculite/cement layers topped with a 1/2" cement render), still yet to tile the rendered dome and install the vent and chimney and make the cast doors. Had a good sized fire in there last night, the third one in the series, and no detectable heat on the outside with the oven. It was still pleasantly warm after 10 hours of 4 to 5C overnight temperatures.
Planning an even bigger fire tonight in readiness for the first cook-up on Saturday. No sign of movement or cracking anywhere.

Neill
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Oven Curing james Firing Your Oven 335 07-15-2014 08:12 PM
Artigiano question... johnrbek Modular Refractory Oven Installation 9 02-20-2007 10:35 PM
Chimney / Flue Question.. johnrbek Pompeii Oven Construction 1 02-20-2007 04:07 PM
Pouring Hearth Question telehort Getting Started 7 01-29-2007 10:20 AM
Construction of Chimney question dmun Design Styles, Chimneys and Finish 0 07-18-2005 09:08 AM


All times are GMT -7. The time now is 02:29 PM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC