My supplier was telling me for the castable product I bought from him likes to be cured at about 175 degrees for 8 FULL HOURS. I was planning to go with a 7 day cure staging as described in out insruction manual from this site so wondering how this suggestion from my supplier will fit into what is normally done by oven builders on this site. I could do 100 degress the first day and then 175 the next but let it burn at this temp for 8 hours and then progress onto the 300 degree etc stages. So not real sure how to treat this castable part of my oven, if I burn a long time at 175 degress not sure if that is a no no or not.
Also I plan to put my blanket insulation on after first cure so I can see cracks etc so if I understand it right if I do this I will be putting my vermiculite concrete over top of blanket and then I will need to also let the sit for a week and then cure it also. Would the curing of the vermic layer need the full week before the cure and then then slow methodical heat up times over small increments or how would this second vermic layer need to be cured....thanks wayne
__________________
see below for my oven album of progress to date


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #2  
Old 12-15-2007, 03:32 PM
Acoma's Avatar
Il Pizzaiolo
 
Join Date: Sep 2007
Location: Reno, NV
Posts: 1,023
Default Re: cure questions

Wayne, it is the completion of the dome, waiting a week, then slowly curing each day with 100 degree increases. Each time you reach the temp, let it slowly come down. Once done, evaluate the cracks, should they exist. Repair if needed, then continue on with the vermic if that is the route, post blanket. If during curing stage, like Ken's, you want the blanket on, then do so, you will be of the few having done so this way. Nothing wrong. Nice to see you progressing. You are right not to go straight to 175 for 8 hours.
__________________
An excellent pizza is shared with the ones you love!

Acoma's Tuscan:

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #3  
Old 12-15-2007, 05:07 PM
waynebergman's Avatar
Apprentice
 
Join Date: Jul 2007
Location: garden bay bc canada
Posts: 138
Default Re: cure questions

Thanks Acoma...still not sure here about one thing.After initial curing i put on blanket and vermic concrete...Yes I get that but what I am not sure about is do I need to cure the vermiculite concrete in the same way after it has been added to the equation. Also I will be putting on Type N mortar and river rock on top of vermic concrete. I am guessing I dont have to cure this vermic layer but thought I should check....thanks wayne
__________________
see below for my oven album of progress to date


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #4  
Old 12-15-2007, 07:23 PM
Ken524's Avatar
Il Pizzaiolo
 
Join Date: May 2007
Location: Kentucky
Posts: 1,648
Default Re: cure questions

Quote:
Originally Posted by waynebergman View Post
what I am not sure about is do I need to cure the vermiculite concrete in the same way after it has been added to the equation.
Wayne,

There really won't be any way for you to "cure" the vermiculite layer with heat. When your oven is super hot, the vermiculite layer will only get warm. Those blankets do an excellent job.

I have about 3" of blanket on top of my dome. When the dome is turning white the topmost blanket is cool to the touch.
__________________
Ken H. - Kentucky
42" Pompeii


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Updated!


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
...
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
...
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #5  
Old 12-15-2007, 07:24 PM
Acoma's Avatar
Il Pizzaiolo
 
Join Date: Sep 2007
Location: Reno, NV
Posts: 1,023
Default Re: cure questions

Wayne, you do not need to cure the same way with vermic as to the dome. You may recall that you are driving out moisture over time. Main thing is driving out the moisture from the dome. Because you are applying mortar over vermic, which will likely be moist to maintain its shape before applying the mortar, you will have lots of moisture to drive out over time. It will take time before full efficiency is maintained, be patient for that. Start with the 7 day cure for the dome, 100 degree incriments, then slowly let it come down. Then go to the next step.
__________________
An excellent pizza is shared with the ones you love!

Acoma's Tuscan:

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #6  
Old 12-17-2007, 07:48 AM
gjbingham's Avatar
Il Pizzaiolo
 
Join Date: Sep 2007
Location: Longview, WA
Posts: 2,021
Default Re: cure questions

Wayne,
I agree with Ken. If you have more than 1 inch thickness of blanket on the dome, the heat does not seem to transfer to the vermiclite insulation layer at all. With only one inch, I would recommend giving the vermicrete at least 3 days of curing before getting your oven really hot.

The real answer may be that no one really knows exactly which way is best. Being gentle with your early applications of heat is probably the best advice.

George
__________________
GJBingham
-----------------------------------
Everyone makes mistakes. The trick is to make mistakes when nobody is looking.

-
Reply With Quote
  #7  
Old 12-17-2007, 08:57 AM
waynebergman's Avatar
Apprentice
 
Join Date: Jul 2007
Location: garden bay bc canada
Posts: 138
Default Re: cure questions

Thanks guys....is there also a bit of cure time after vermic layer before I apply the type "N" and river rock. Also I am woondering after vermic layer is on can I move my canvas shed out of the way. Not sure how well the vermic layer holds up to rainy days etc before I get my type N over top of it. I plan after the vermic layer is done to move the shed and start using the oven and just take my time with the river rock treatment if the wheather wont bother things. It will be nice to get cooking and put away the saw and bricks and all my mess out there and then just tinker away at the cosmetic part of the build........thanks for the help folks....wayne
__________________
see below for my oven album of progress to date


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #8  
Old 12-17-2007, 09:07 AM
CanuckJim's Avatar
Il Pizzaiolo
 
Join Date: Jan 2006
Location: Prince Albert, Ontario, Canada
Posts: 1,479
Default Re: cure questions

Wayne,

I wouldn't move the shed over the oven. The vermic layer is a good insulator, but it's also a great sponge. You won't be able to expose it to the elements until you've parged with Type N, but that does not mean you can't fire the oven in the meantime.

Jim
__________________
"Made are tools, and born are hands"--William Blake, 1757-1827
Reply With Quote
  #9  
Old 12-17-2007, 10:53 AM
waynebergman's Avatar
Apprentice
 
Join Date: Jul 2007
Location: garden bay bc canada
Posts: 138
Default Re: cure questions

Thanks Jim, is there a waiting period after the vermic layer is done before I parge it with the type N.....wayne
Your oven in the snow pic looks awesome.
__________________
see below for my oven album of progress to date


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #10  
Old 12-17-2007, 11:11 AM
CanuckJim's Avatar
Il Pizzaiolo
 
Join Date: Jan 2006
Location: Prince Albert, Ontario, Canada
Posts: 1,479
Default Re: cure questions

Wayne,

I'd keep it dry for at least two weeks before parging. The parge coat really won't be completely cured for 28 days. After that, you could go ahead with your mosaic approach, but you'd have to wait another 28 days before you could seal it (like mortars, etc., the sealant can't be allowed to freeze; otherwise it will turn white). To be on the safe side, I'd expose it to the elements only after it has been sealed. I'd just be patient about the covering; maybe move it when you want to bake, and put it back in place when the oven is not in use.

Jim
__________________
"Made are tools, and born are hands"--William Blake, 1757-1827
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Questions, Questions, Questions Dan94550 Tools, Tips and Techniques 28 10-23-2007 09:10 AM
HELP! Can I cure and test oven before enclosing? Nick Pompeii Oven Construction 25 10-21-2007 02:41 PM
Several questions from a beginner whocanitbenow Getting Started 6 04-05-2007 07:43 AM
Hearth Questions El Puaco Introductions 12 11-25-2006 11:55 AM
39.3" round cooking surface (Low Vault) Naples style oven QUESTIONS? southpaw Pompeii Oven Construction 0 02-03-2006 09:11 AM


All times are GMT -7. The time now is 04:45 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
© 2006/10 Forno Bravo, LLC