Pizza Ovens | (800) 407-5119 | info@fornobravo.com | U.S. Price List
logo

start shopping button

Home
About Us
Forum
Contact Us
Store
Tech Specs
Dealers
Photos
Recipes
Video

Go Back   Forno Bravo Forum: The Wood-Fired Oven Community > Pizza Oven Design and Installation > Pompeii Oven Construction

Reply
 
LinkBack Thread Tools Display Modes
  #11  
Old 12-10-2007, 04:47 PM
RCLake's Avatar
Journeyman
 
Join Date: Jul 2007
Location: Corsicana,Texas
Posts: 433
Default Re: Vent started

"This forum automatically moves one from a 'serf' to a 'peasant'. That's
I'm not sure I want to get to the next level, that mixing concrete is no fun.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiTweet this Post!
Reply With Quote
  #12  
Old 12-10-2007, 08:38 PM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,213
Default Re: Vent started

Only in english is "peasant" derogatory. It comes from the French paysan(ne), or someone from the countryside. What we know as a farmer. The US press is fond of calling our local country people "farmers" and those in other countries "peasants". If a reporter were to write that the US political process is held hostage to the interests of the peasantry, he'd be linched.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiTweet this Post!
Reply With Quote
  #13  
Old 12-11-2007, 05:45 AM
jcg31's Avatar
Apprentice
 
Join Date: Aug 2007
Location: Sherwood, Wisconsin
Posts: 244
Default Re: Vent started

This link will take you to drawings for the arch, the floor space from back of arch to front of oven is 14.5", because the back of the arch was trimmed to conform to the dome curve and the front of the floor extends one inche beyond the arch. The 11.5" illustrated is from the front of where the door will be to the front of the arch.

http://www.fornobravo.com/forum/atta...alled-arch.jpg

Happy building!

Jim




Quote:
Originally Posted by RCLake View Post
Another thing I want to copy, SORRY, but there is so many insperations on this forum. But I'm getting way ahead of myself, tomorrow I'm putting the stand up - hopefully it's not raining. I'm wondering how much room from the 42" circle to build out the floor? 12"
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiTweet this Post!
Reply With Quote
  #14  
Old 12-11-2007, 02:36 PM
wlively's Avatar
Journeyman
 
Join Date: May 2005
Location: Spring Branch, TX 78070
Posts: 384
Default Re: Vent started

Jim

Your arch drawing looks lovely.

I would just comment, that you may want to consider an alteration. The arch will be stronger if the bricks are cut to taper and the mortar joints kept to a minimum. The idea being that it will be freestanding on it own, even if the mortar fails.
__________________
Wade Lively
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiTweet this Post!
Reply With Quote
  #15  
Old 12-11-2007, 05:22 PM
Ken524's Avatar
Moderator
 
Join Date: May 2007
Location: Louisville, KY
Posts: 1,569
Default Re: Vent started

Quote:
Originally Posted by wlively View Post
The arch will be stronger if the bricks are cut to taper and the mortar joints kept to a minimum.
This is a very good idea. I'm learning the hard way.
__________________
Ken H. - Louisville, KY
42" Pompeii


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Updated!


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
...
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
...
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiTweet this Post!
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Help with vent landing size gjbingham Pompeii Oven Construction 3 10-22-2007 09:18 AM
chemney vent assembly question? dougecs Modular Refractory Oven Installation 2 08-23-2007 08:11 AM
Vent design james Pompeii Oven Construction 1 02-21-2007 06:23 AM
Verifying alignment of Casa 90 vent Alan Modular Refractory Oven Installation 5 09-26-2006 01:15 PM
Help on vent size Davy Getting Started 1 05-09-2006 06:50 PM


All times are GMT -7. The time now is 01:42 PM.

Home | About Us | Our Factory | Dealers | Press and News | Contact Us | FAQ | Forno Bravo UK
Residential Pizza Ovens | Commercial Pizza Ovens | Catering Pizza Ovens | Pizza Oven Accessories | Pizza Peels | Outdoor Fireplaces
Select | Justify | Order | Install | Manage | Make Pizza | Roast, Bake and Grill
Pompeii Brick Oven | Firenze Concept Oven | Links | Cookbooks | Vera Pizza Napoletana | Pizza Oven Photos
Commercial Pizza Oven Selector | Outdoor Kitchen Design | Site Map | Forum

© 2006 Forno Bravo, LLC Italian Pizza Ovens

No part of this website or content thereof may be reproduced, distributed or transmitted in any form or by any means, nor may any part of this website be stored in a database or other electronic retrieval system, or any other website, without the prior written permission of Forno Bravo, LLC.


Powered by vBulletin® Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.5.2
© 2006/10 Forno Bravo, LLC