#11
| ||||
| ||||
| Quote:
Quote:
Quote:
I have cut my bricks in 3, so I end with a 3" wall thickness. (plus some refractory concrete over the top. Trying to keep thermal mass down a bit and hope to compensate with heaps of insulation. |
|
#12
| ||||
| ||||
| Final row of bricks going in! As you can see in the next two photos: ![]() |
|
#13
| ||||
| ||||
| I was talking to a friend of a son of mine about the oven. He is a brick layer (and a very good one at that). I discussed the issue of making the final "keystone" and getting it to fit properly etc. he suggested that rather than spending ages making the perfect keystone, why not pour one using refractory concrete! I thought about it for a while and it makes a lot of sense: 1. it will ensure it is the most perfect fit you can get. 2. takes no time at all (2 minutes to mix the concrete and 30 seconds to "goop" it in. So I put a $0.50 aluminium plate on top of my vanes (just prior to putting in the final course of bricks) as you can see in the next pic: ![]() After I mortared up the final course of bricks, I just "gooped" in some refractory concrete and voila: the perfect plug/keystone! ![]() Finally I covered the whole lot with a bit more refractory concrete, and now will have to wait a couple of days before I remove the vanes. (and hopefully have a "non-collapsing" dome. |
|
#14
| ||||
| ||||
| #87 (M) I'll up the ante to 12 Kiwis that your dome will support you, standing on one leg at the very top, though I will have to apply to NZ for the Kiwis if I lose. (M) Peter, that mortar you used looks very pale to me. Did you use a white cement? ____ (M) Did you use much more fire clay than called for in the 8 parts sand, 3 parts cement, and 2 parts fire clay? _____ (M) The quote below is by an individual with the "handle" Yahoo-Archive which I believe belongs to either James, or Jim who worked on the "original" brick oven. "1. (if you have courage and faith) when finishing the very top rows of the oven, instead of driving yourself nuts making a gazillion cuts in firebrick, simply stack up some bricks and wood in the center of the oven, until they reach the bottom of the opening (at the top of the oven) and then place cardboard or wood on top of that stack of materials. then use modeling clay to seal any*gaps. then*pour a "plug"*as the final "cap". for my plug i used repair mortar mixed with crushed firebrick to create a concrete like mixture. my plug was about 6 inches in diameter. i've done 4 months*of cooking now at the rate of 3 to*4 fires per week and the plug seems to be holding up with no problems but i can't guarantee*how long it will last. i used repair mortar because it had alumina (in addition to silica) in it and i read somewhere that alumina based cements*retained strength better under heat.*" (M) Visit the following 2 URLs for a more detailed discussion of plugs: http://www.fornobravo.com/forum/show...highlight=plug (Closing the dome) http://www.fornobravo.com/forum/show...highlight=plug (Top lessons learned) ================================================== = Ciao, Marcel
__________________ "Everything should be made as simple as possible, ... but no simpler!" (Albert Einstein) |
|
#15
| ||||
| ||||
| the plug quote and concept are mine... 10% of all your pizzas now belong to me. seriously, 15 months and my plug is still holding up fine, and better yet (for you) your brick worksmanship (cuts and fit) is much much better than mine ever was.
__________________ my site for our pompeii and tandoor ovens To view links or images in signatures your post count must be 5 or greater. You currently have 0 posts. |
|
#16
| ||||
| ||||
| (M) Peter, that mortar you used looks very pale to me. Did you use a white cement? ____ (M) Did you use much more fire clay than called for in the 8 parts sand, 3 parts cement, and 2 parts fire clay? _____ No, I didn't make the mortar myself. I bought special refractory mortar from a specialist refractory supplier. It is very white and has a very soft consistency. The supplier said that it is really designed for thin joints between flat surfaces of bricks, joint thickness up to 3 or 4 mm. He suggested to mix it with sand (about 50/50 ratio) to give it some better gap filling properties. My refractory concrete is also from the same supplier. This can be used for casting etc. I have used it for the manifold and to cover the top of the dome with. Not cheap though at NZ$47.- a bag (have used 2 bags so far, but still have to cast the vent, so may have to go for a third one.) |
|
#17
| ||||
| ||||
| You guys were right all along, and my fears about the dome collapsing were just a manifestation of my paranoia! I removed all the vanes today, and the dome did NOT collapse!. I cleaned it all out, and here is a picture of the interior: as you can see, the fourth, fifth and sixth courses have a much better fit than courses 1, 2 and 3, because I started "shaping" the bricks from there on in. (they are not all perfect though as you can see You can also see the final "plug" and that the the bricks are getting smaller in the final two courses. |
|
#18
| ||||
| ||||
| And here is a picture of my lovely lady, celebrating the finishing of the dome with me. She has put up with endless amounts of dust from me cutting firebricks and lots of other things, without complaining: she is a GEM! |
|
#19
| ||||
| ||||
| I have started myfirst "curing" fire tonight. It is amazing how the oven vents: the bottom 4 inches of the oven draw in the cold air perfectly, and the top half vents the hot air. You can put your hand on the oven floor no worries, and yet the air coming out of the vent is hot. You can actually see the separation in this picture: ![]() I'm pretty happy with the results!!! |
|
#20
| ||||
| ||||
| congratulations!
__________________ -paul overdo it or don't do it at all! |