Forno Bravo Forum: The Wood-Fired Oven Community

Forno Bravo Forum: The Wood-Fired Oven Community (http://www.fornobravo.com/forum/)
-   Pompeii Oven Construction (http://www.fornobravo.com/forum/f8/)
-   -   Gaps in floor and expansion joint (http://www.fornobravo.com/forum/f8/gaps-floor-expansion-joint-16214.html)

cholme 06-26-2011 08:26 PM

Gaps in floor and expansion joint
 
Hello all,

I set my floor today in the fireclay and sand mixture. I cut the floor so the dome will rest outside the floor. I was wondering about two things before I proceed.

1. Do I need to leave room for the floor to expand when I set the soldier course or do you just mortar them right to the side of the floor.
2. Do you fill the gaps in the floor with anything? I have some gaps where the bricks don't quite touch, nothing major, 1/8" max; just seems like it would collect flour and stuff.

I will post pics in my thread at:
http://www.fornobravo.com/forum/f8/3...aks-16176.html

Best,

Chris

GianniFocaccia 06-26-2011 08:38 PM

Re: Gaps in floor and expansion joint
 
Chris,

Yes, leave a gap for the floor to expand. I left 1/8". Some guys place a piece of cardboard around the floor as they build their first course.

As far as floor brick gaps go, don't sweat them. They will fill with ash.

John


All times are GMT -7. The time now is 03:30 PM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC