Here's the soldier course mortared down, as well as the beginning of the first course of polygons:







The soldier course didn't come all the way to the door arch: I cut too much off the corners of the soldier course bricks. I'll fix this when I build the entry walls.
Reply With Quote
  #82  
Old 11-02-2006, 06:24 AM
maver's Avatar
Master Builder
 
Join Date: Aug 2006
Location: Puyallup, WA
Posts: 571
Default

very nice.

Regarding the hearth bricks, if you do have enough height irregularity to catch the edges of a peel consider using a spare firebrick as a plane to grind them down - you won't end up with low spots ("pillows") as some have described with the use of a grinder.

I wonder if anyone is copying your approach at this time? The way your mock ups have fit together and the very clean appearance of the inside of the oven (once you wash off the extra mortar) are very appealing. The tight seams should lead to a very solid oven as well. Now that you have done all the design calculations it should be perhaps easier than constructing a normal brick dome.
Reply With Quote
  #83  
Old 11-02-2006, 06:26 AM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,216
Default top of dome

Here's what I started with the afternoon I started to finish the dome:



Assembling the next level of the dome was difficult and frustrating. The polygons didn't fit together very well, most particularly the front two partial hexagons surrounding the door. A large strip had to be cut off the meeting edges of those two parts in order for them to fit. The pentagon at the top had to have two sides trimmed to accomodate the steeper angle created. The end result was that the interior of the dome wasn't a seamless fit. I had to ramp the non-meeting edges with mortar, to get them even somewhat smooth. The wooden armature I built was not needed after the second hexagon was set, and was actively in the way when I placed the third. I was involved with the process, and hence, you don't have process pictures, but here's what it looked like at the end of the day:





The good news is that the dome is done, and that the worst thing is that I have some joints that don't meet precicely. It's still an oven dome with closly fit, true refractory, joints, and even the worst of my gaps is no more than the back of any two bricks in a pompeii design.
Reply With Quote
  #84  
Old 11-02-2006, 06:33 AM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,216
Default Entry walls

Here's a picture of laying up the flared walls of the oven entry. This wasn't as deep as I drew, but my fireplace vent took more room than intitally designed, pushing the oven assembly to the front.









This is no shallower than the entry on a F-B casa modular oven, and should be fine.
Reply With Quote
  #85  
Old 11-02-2006, 06:38 AM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,216
Default Night scrub

Since it gets dark at dinner time with the arrival of eastern-standard-time, my oven scrub was in the dark. The oven, which looked so small laid out on the workshop floor, seemed immense when I had to reach to the back to scrub mortar joints.





My trouble-light illuminated oven looks like James' avatar, huh?
Reply With Quote
  #86  
Old 11-02-2006, 06:49 AM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,216
Default Lessons learned

What did I learn yesterday?

First, don't build your oven on the first of November. The chance of getting a string of sunny seventy degree days this time of year is slim-to-none. I was very lucky, it's raining today.

Second, spring for the refractrory adhesive to glue your floor down to your insulating board. You build your oven kneeling in it, and it's disconcerting at best to have your oven floor creeking underfoot.

Third, and most important, if you build a geodesic oven, don't pre-assemble anything except the pentagon at the top. If I had laid my oven up out of triangles in individual courses, I could have made small corrections as needed with the wet saw. It would have been an easier job, and gotten better results. I could have used the string to center point method to determine that the dome was truely hemispherical as it went up, rather than have a rude surprise at the end.

Here's a couple of interior views, of the pentagon cap, you can see one of the ramped mortar joints to compensate where edges didn't meet.



Reply With Quote
  #87  
Old 11-02-2006, 12:44 PM
maver's Avatar
Master Builder
 
Join Date: Aug 2006
Location: Puyallup, WA
Posts: 571
Default

That's still dramatically smoother on the inside than any brick oven, probably the closest thing to a cast refractory oven that you can make at home. I suspect that while you had some joints that need to be ramped you probably saved significantly on the hassle factor of trying to piece together multiple small pieces (with wet seams).

I'm interested to know more about how it came together - you indicated the armature was not needed after the second hexagon was set - were you able to mortar them in place without support from where you left off the day before? Were they firm once in place or just stable enough that they did not need support?
Reply With Quote
  #88  
Old 11-02-2006, 01:44 PM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,216
Default

Everything went fine until the hexagon layer. The hexagon pieces, although light enough to pick up, are a different story when you are trying to stick them to slippery mortar layer, that you don't want to mush away. Also, they are getting close to horizontal at that point. The heat stop refractory mortar, when applied to even a wet joint, will still get some of the water sucked up, and firm up the joint within a couple of minutes. It's still free to come loose, and when it does, the mortar is too stiff to re-adhere, so this is both good and bad. So, the first two hexagons, secured into their notches on the bottom, and leaning against one another are pretty secure. I think the same thing would apply if you were gluing individual triangles. You could easily lift one with one hand. The fitted joints, and firming mortar would hold them in place. The main problem is that the big polygons are too cumbersome to handle easily, and the errors accumulate toward the top of the dome, so the big problems are coming at the point where the units are hardest to handle.

The main forces in the dome are pushing outward, as I learned in my dry test assembly, but a day old underlayer constrains these forces, the parts don't tend to cave in, because the fitted joints lean against each other.

Last edited by dmun; 11-02-2006 at 01:47 PM.
Reply With Quote
  #89  
Old 11-02-2006, 03:14 PM
DrakeRemoray's Avatar
Il Pizzaiolo
 
Join Date: Mar 2006
Location: Littleton, CO
Posts: 1,211
Default

Wow! Great progress! You are going to be cooking in no time.

It looks like you are going to have a shelf out in front of the landing. What material are you going to use that?

Really cool!

Drake
Reply With Quote
  #90  
Old 11-02-2006, 03:31 PM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 4,216
Default shelf

I have a big piece of matching slate for that:



I know, not the best material, subject to staining, but it's here, and will complement the rustic look of the oven.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -7. The time now is 01:00 PM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC