Forno Bravo Forum: The Wood-Fired Oven Community

Forno Bravo Forum: The Wood-Fired Oven Community (http://www.fornobravo.com/forum/)
-   Pompeii Oven Construction (http://www.fornobravo.com/forum/f8/)
-   -   42" Build Underway in Central Alabama (http://www.fornobravo.com/forum/f8/42-build-underway-central-alabama-20804.html)

edsiajb 06-18-2014 06:08 PM

42" Build Underway in Central Alabama
 
I've already posted several times asking questions...many thanks to those who have graciously replied with valuable information based on their skills and experiences.

I wanted to go ahead and start a thread for my photos - and maybe if someone here has advice, a better idea, or any other comment, they'll chime in.

We have three teenagers, and so far this has been a great family project. Everyone has pitched in and helped.

I don't plan on doing anything fancy. The oven will have a two-level counter to one side (using granite scrap slabs). I plan to build a small (10'x16') pavilion style shelter in front of the oven, with a shed roof off the back covering the oven and counter tops. I also plan to run water and electricity - although not sure when that will happen.

I really like the under-stand drawer that I've seen on several builds (i.e. Gulf), and will probably do something like that. Will also probably incorporate some LED strip and flood lighting...strips for the counters and floods for the front of the oven.

http://img.photobucket.com/albums/v7...ps3c08ec7a.jpg

Above photo is me leveling the ground for the slabs. As we are at the Southern terminus of the Appalachians, there is not much level ground around here.

edsiajb 06-18-2014 06:12 PM

Re: 42" Build Underway in Central Alabama
 
http://img.photobucket.com/albums/v7...ps6688e9f2.jpg

Ground leveled...

edsiajb 06-18-2014 06:13 PM

Re: 42" Build Underway in Central Alabama
 
http://img.photobucket.com/albums/v7...psbf5de0ee.jpg

Tamped 4" of rock under form.

edsiajb 06-18-2014 06:15 PM

Re: 42" Build Underway in Central Alabama
 
http://img.photobucket.com/albums/v7...ps9e7685ba.jpg

Ready to pour...funny how it doesn't look level, but it is!

edsiajb 06-18-2014 06:17 PM

Re: 42" Build Underway in Central Alabama
 
http://img.photobucket.com/albums/v7...ps811290fb.jpg

5.5" - 6" slab...took a total of 59 60lb bags.

edsiajb 06-18-2014 06:18 PM

Re: 42" Build Underway in Central Alabama
 
http://img.photobucket.com/albums/v7...psa26933e5.jpg

4" slab extension for counter tops.

edsiajb 06-18-2014 06:22 PM

Re: 42" Build Underway in Central Alabama
 
http://img.photobucket.com/albums/v7...ps8a2e54ad.jpg

Block stand with at least every other core poured with re-bar and concrete. Note the stainless steel 2" x 2" x 1/4" angle iron...it was a gift from my brother.

Tscarborough 06-18-2014 06:26 PM

Re: 42" Build Underway in Central Alabama
 
And a very nice gift it is. When was the last time you guys had an earthquake?

edsiajb 06-18-2014 06:26 PM

Re: 42" Build Underway in Central Alabama
 
http://img.photobucket.com/albums/v7...ps99c51d39.jpg

Block and slab sealed and ready for French Drain and back fill. Ground will be sloped away from block on all sides. That is my 17 year old son (the oldest of our three teenagers) on the Kubota.

edsiajb 06-18-2014 06:28 PM

Re: 42" Build Underway in Central Alabama
 
Quote:

Originally Posted by Tscarborough (Post 175600)
And a very nice gift it is. When was the last time you guys had an earthquake?

We have an earthquake about once every 20 years...but they are always minor.


All times are GMT -7. The time now is 10:42 PM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC