Right, insulate, insulate, insulate!!!
__________________
Chip
Reply With Quote
  #122  
Old 09-20-2013, 02:57 PM
Apprentice
 
Join Date: May 2012
Location: CONNECTICUT
Posts: 135
Default Re: 30"/760mm Scotland Pompeii

She will stay warm for sure. I wrapped my oven 3 times with 1" thick blanket I could tell you 24 hours later my oven is still 200-300 degrees warm it's amazing.
Reply With Quote
  #123  
Old 09-21-2013, 12:08 AM
Apprentice
 
Join Date: Oct 2011
Location: Bungay, Suffolk, UK
Posts: 151
Default Re: 30"/760mm Scotland Pompeii

How are you going to finish the oven JMS?
Reply With Quote
  #124  
Old 09-21-2013, 04:01 AM
jms jms is offline
Laborer
 
Join Date: Feb 2013
Location: UK
Posts: 78
Default Re: 30"/760mm Scotland Pompeii

Quote:
Originally Posted by Bookemdanno View Post
How are you going to finish the oven JMS?
The oven is getting enclosed in a brick outer-dome. Like cobblerdave's build but with bricks which will withstand the scottish weather
Reply With Quote
  #125  
Old 09-28-2013, 12:58 PM
jms jms is offline
Laborer
 
Join Date: Feb 2013
Location: UK
Posts: 78
Default Re: 30"/760mm Scotland Pompeii

Over the last week we've got a lot of the outer dome up. This oven is turning into quite the monster.
Attached Thumbnails
30"/760mm Scotland Pompeii-img_0783_1200x900.jpg   30"/760mm Scotland Pompeii-img_0784_1200x900.jpg   30"/760mm Scotland Pompeii-img_0798_1200x900.jpg   30"/760mm Scotland Pompeii-img_0801_1200x900.jpg   30"/760mm Scotland Pompeii-img_0802_1200x900.jpg  

cobblerdave likes this.
Reply With Quote
  #126  
Old 09-29-2013, 06:35 AM
Apprentice
 
Join Date: May 2012
Location: CONNECTICUT
Posts: 135
Default Re: 30"/760mm Scotland Pompeii

Wow!! I reall y like it great job. It is big, bigger is always better.
Reply With Quote
  #127  
Old 05-28-2014, 02:22 PM
jms jms is offline
Laborer
 
Join Date: Feb 2013
Location: UK
Posts: 78
Default Re: 30"/760mm Scotland Pompeii

Now that it's nearly summer I'm continuing my build.

I stopped a week or so after the last post due to lack of free time and then covered the oven over winter. Progress at that point was this (photo taken after I took the cover off)



The layers of vertical bricks were a bit of a messy job for when I had to start curving the dome. Until that point I had tried to keep a gap between the bricks and insulation, but when I needed to start curving the dome it got difficult and it seemed like the easiest way at the time. I can think of better ways to do it with hindsight but I don't want to dismantle that much brickwork because it is rock solid, and I'm going to be pointing all of it anyway so I think it'll look fine at the end.

One thing I have changed my mind about is how to build the chimney so that's what I've done since taking the tarp off. To make it easier on myself I've taken the top bricks off of the arch and one brick at each layer on both sides of the dome so that when I finish the chimney I can tie it all together a bit more neatly. It's a dirty mess at the moment.



I've not fired it yet so I want to get the chimney done ASAP.
Reply With Quote
  #128  
Old 06-17-2014, 11:48 AM
jms jms is offline
Laborer
 
Join Date: Feb 2013
Location: UK
Posts: 78
Default Re: 30"/760mm Scotland Pompeii

Forgot to post some progress







Reply With Quote
  #129  
Old 06-17-2014, 11:56 AM
jms jms is offline
Laborer
 
Join Date: Feb 2013
Location: UK
Posts: 78
Default Re: 30"/760mm Scotland Pompeii





The problem I've had with the chimney stack is that the vent opening on the inner-arch is too far back. I forgot to compensate for the thickness of the outer brickwork when I positioned it. It has made this whole part much harder than it needed to be because means squishing a square box into the side of the dome. My brickwork isn't very pretty, but I hope it'll be functional in keeping the rain out of the oven.





I cast a chimney crown which is currently curing, then tomorrow or the day after I'll get it mortared on top of the stack with the chimney pot and then I can finally think about firing this thing.

After I've fired it a good few times I'm going to complete the dome, then clean all the brickwork and point the joints.
cobblerdave likes this.

Last edited by jms; 06-17-2014 at 12:00 PM.
Reply With Quote
  #130  
Old 06-17-2014, 02:11 PM
cobblerdave's Avatar
Il Pizzaiolo
 
Join Date: Jan 2010
Location: brisbane australia
Posts: 2,282
Default Re: 30"/760mm Scotland Pompeii

G'day
Impressed with that dome and chimney transition, it's turned out quite neat.
The overall look of the is great and I think that chimney setback is quite a feature. Can't wait to see the chimney pot I situ
Regards dave
__________________
Measure twice
Cut once
Fit in position with largest hammer

My Build

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

My Door

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -7. The time now is 06:45 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
© 2006/10 Forno Bravo, LLC