Wow! where does the time go?

Most of my roof is in place but the biggest hang up is the roof flashing for the chimney stack. Been trying to save some money in doing the work myself -- again. Fireworks stove shop wanted over $200 for a roof flashing, so did some web surfing how to fabricate a cone from sheet metal with a roof slope; tried the graphic layout first on plain sheet metal, then transferred pattern to .3mm stainless. Then had to try soldering stainless.

My joints came out OK, but having clean metal I guess is the trick. Washed everything with soap, then acetone, then flux and finally soldered. The stainless really heats quickly so you have to be very watchful and do a little at a time. But do able! The seams "are not perfect" but they hold together. Will seal one more time with paintable silicone, then spray the transition black with high temperature stove paint.

The silicone should be far enough from the stack not go be combustible--I hope.
Really slow going! Slower today because of snow!

Structural Slab for new WFO-img_1313a.jpg

Structural Slab for new WFO-img_1319a.jpg

Structural Slab for new WFO-img_1320a.jpg
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Started in Napa, WFO dome & slab questions EricU Getting Started 9 08-01-2010 12:08 PM
Foundation Slab Questions achilles007 Newbie Forum 5 07-06-2009 04:52 PM
structural slab question rbigante Pompeii Oven Construction 2 10-01-2008 07:44 PM
structural slab question rbigante Pompeii Oven Construction 5 09-29-2008 10:42 AM
New hearth slab design question DrakeRemoray Pompeii Oven Construction 6 04-24-2006 01:42 PM