Old 04-17-2012, 02:55 AM
Amac's Avatar
Journeyman
 
Join Date: Nov 2011
Location: Ireland
Posts: 358
Default Re: Starting new 36" build

Looks brilliant Dennis - I looked in vain to see had you made any of the building mistakes I made.
- you have staggered the vertical joints
- it looks like you didn't allow the brick which joins to the arch to dip ever so slightly.
- no inverted Vs - only other dome builders will appreciate the work that goes in to minimise those. I saw even "Brickie from Oz" was hard to convince that they were a problem ( at that time he had built just vaulted ovens)

I found the homebrew sometimes really sticky and sometimes not so. I don't think it is so much the wetness but rather maybe use a little more than 1 of the fireclay - as Gianni suggested.
I also found that when I used some brick dust which I scraped up from my "workbench" and a "tray" which I put underneath - that it wasn't as sticky as the coarser clay which I bought. Not sure what advantage superfine sand would give - my sand is just labelled "builders sand".

Looks like the arch and dome are tying together nicely. I found that the IT was useful during the arch building as it gave reassurance that the dome would not drift off unexpectedly. It was worth giving it some attention in advance.
Well done
Aidan
Reply With Quote
  #62  
Old 04-23-2012, 03:54 PM
deejayoh's Avatar
Il Pizzaiolo
 
Join Date: Jul 2010
Location: Seattle
Posts: 1,343
Default Re: Starting new 36" build

Quote:
Originally Posted by Amac View Post
Looks brilliant Dennis - I looked in vain to see had you made any of the building mistakes I made.
- you have staggered the vertical joints
- it looks like you didn't allow the brick which joins to the arch to dip ever so slightly.
- no inverted Vs - only other dome builders will appreciate the work that goes in to minimise those. I saw even "Brickie from Oz" was hard to convince that they were a problem ( at that time he had built just vaulted ovens)
Update - I'm about halfway through my 8th chain of bricks.

Aidan -

It seems that on the next chain after taking this pic, I endeavored to make as many of these mistakes as I could!

- On the joint spacing, I used a half brick in the middle of my 6th chain, and now that is screwing up the spacing in the 7th and 8th. I guess one learns quickly how any changes to the pattern are compounded in the next chain(s) as you move forward! I am trying to decide if I should just take the pain and allow some joints to line up in the 8th chain (and have even spacing) or keep trying to cut around the different sized bricks.

- I lost the curve on the brick that attached to the right side of the arch on the seventh chain. I had to go back and add a shim on top of it to get the level and radius where it should be.


- at least the "V"s are still working out. So that is good


The good thing that I have realized is that I don't need to angle the bottoms of the bricks any longer. On the 6th and 7th chains, I had cut 1/4 inch angle to the bottom of the brick to get the radius of the dome right. But I mocked up the dome to the top and realized from the 8th on, I can use full height bricks and get the correct radius by tilting each brick up about a quarter inch in the back. That should help me close this thing in faster. One less cut, and a quarter inch more brick in each chain. I think I have 5 more chains + the plug to go
Attached Thumbnails
Starting new 36" build-wp_000081.jpg  
Reply With Quote
  #63  
Old 04-24-2012, 02:50 AM
Amac's Avatar
Journeyman
 
Join Date: Nov 2011
Location: Ireland
Posts: 358
Default Re: Starting new 36" build

Quote:
I used a half brick in the middle of my 6th chain
You are bing much more precise than I was. It wasn't until the top 3 or 4 rows that I got the side angles and bevels figured more or less right. I ended up turning bricks inside out (wider on the inside than the outside) on a couple of occasions just to recover mistakes.

You should check out Laku's system for cutting 2 indentical bricks from one for the last few rows. The cuts are straight and include angles and bevels in 3 single cuts and just small ends wasted.
http://www.fornobravo.com/forum/28/m...tml#post102532 (My indispensible tool (a variation on a FB theme))
The same system can get you 3 bricks from 4 cuts.. Unless my memory is tricking me I think I did that for the last two full rows.
Maybe it works better (for a change) with the angle grinder since jcg31 had trouble with it on the HF saw.
Also on aligning the joints - now that I see the hairline cracks I can see one or two that have descended on those joints - but also on others, and on one almost complete circular horizontal joint. I have mixed feelings on them - on the one hand I prefer that the joints are not so strong that the brick splits. On the other I would prefer to see none - but is that possible at all?

Gulf had a good system for preventing the droop of the bricks joining the arch. He used a laser level set up at the back. It's hard to see with the naked eye because when you stand back and look at any row it seems to wave up and down even though it is perfectly level.

In the end it just meant I had a slightly egg shaped plug rather than circular.

Does that block on the form board slide up? If so good idea. One drawback of the IT is it doesn't keep the height consistent along the row - and a level is needed at least now and then. I tried to think of some attachment but gave up on it. Some hybrid IT and formboard would solve it.

Keep it up - nearly there - it looks brilliant.
I recommend Sharkeys vent (btw also used by Aceves) when you get there, although I spent a while after finishing the dome before I could work myself up to any more building. It seems to work very well even though I made the opening a bit narrow.. front to back

Last edited by Amac; 04-24-2012 at 02:59 AM.
Reply With Quote
  #64  
Old 04-24-2012, 08:48 AM
deejayoh's Avatar
Il Pizzaiolo
 
Join Date: Jul 2010
Location: Seattle
Posts: 1,343
Default Re: Starting new 36" build

Quote:
Originally Posted by Amac View Post
Does that block on the form board slide up? If so good idea. One drawback of the IT is it doesn't keep the height consistent along the row - and a level is needed at least now and then. I tried to think of some attachment but gave up on it. Some hybrid IT and formboard would solve it.
Thanks for the comments and reassurance

to your question, yes - the block slides up. Well, actually I slide it up and screw it to the board for each chain. But it does work to keep things level and at the same angle. I had to go this way because my dome doesn't have a constant radius - but now that I have it set up, I think it works pretty well. I don't know that I would have wanted to use an IT for each brick. Too much jiggling and scraping of mortar going on. I set each one, and then swing the form by to check the angle and position. Works pretty well.

I'll try to post a close up picture later.
Reply With Quote
  #65  
Old 05-03-2012, 07:57 AM
texman's Avatar
Master Builder
 
Join Date: Nov 2009
Location: Amarillo, Texas
Posts: 587
Thumbs up Re: Starting new 36" build

Great job Dennis!
I am starting row 4.

Tracy
__________________
My Progress:

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #66  
Old 05-04-2012, 11:43 AM
deejayoh's Avatar
Il Pizzaiolo
 
Join Date: Jul 2010
Location: Seattle
Posts: 1,343
Default Re: Starting new 36" build

Quote:
Originally Posted by texman View Post
Great job Dennis!
I am starting row 4.

Tracy
Thanks Tracy. I've been watching your build. Looking good. I love the covered location. Call me jealous! You may pass me if I don't get on this weekend (not that it's a race)

I got a Living Social deal on a two-hour intro to metalworking class in my email today. A little bit of welding knowledge should come in handy for building the door. Plus I've always wanted to know how to weld.
Reply With Quote
  #67  
Old 05-11-2012, 10:48 AM
deejayoh's Avatar
Il Pizzaiolo
 
Join Date: Jul 2010
Location: Seattle
Posts: 1,343
Default Re: Starting new 36" build

Hey all you smart builders. I need some advice here. I got about 60% of my 9th chain in last night, and when I finished - I realized that I had gotten off level a bit. If you look at the picture, you can see that the left side is lower than the right if you compare the outer edges. I think that the difference is about 3/8-1/2". I think I started dropping the angle of the bricks at the left edge of the arch, and continued around for about 5 or 6 bricks.

I'm thinking about knocking out those bricks and re-laying them tonight, getting it leveled up. Does it make sense to do that, or can I just make it up in the next level?

I am worried that the error is just going to compound as I get closer to closing up the dome.

Appreciate any advice.

Dennis
Attached Thumbnails
Starting new 36" build-wp_000003.jpg  
__________________

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Last edited by deejayoh; 05-11-2012 at 10:50 AM.
Reply With Quote
  #68  
Old 05-11-2012, 11:22 AM
Amac's Avatar
Journeyman
 
Join Date: Nov 2011
Location: Ireland
Posts: 358
Default Re: Starting new 36" build

Quote:
If you look at the picture, you can see that the left side is lower than the right if you compare the outer edges. I think that the difference is about 3/8-1/2". I think I started dropping the angle of the bricks at the left edge of the arch, and continued around for about 5 or 6 bricks.
If it is just that the left is 3/8" lower than the right I would do nothing - since you are still circling in to the dome top and it really doesn't matter if that is slightly offset. I would think it is eminently correctible. I only put a level on a few times during the build. I was just trusting that the IT would keep it level, and apart from a bit of droop at the arch in general it did.

What I think I see in your dome is that the last three courses look like they are taking a cone shape rather that a dome shape - i.e they look straight and heading for a point rather than rounded and flattening out.. Maybe it's the photo but if so it would mean that you re not tilting the bricks enough. When you use an IT the clamp takes care of that tilt. Are you using shims?
Reply With Quote
  #69  
Old 05-11-2012, 11:26 AM
texman's Avatar
Master Builder
 
Join Date: Nov 2009
Location: Amarillo, Texas
Posts: 587
Default Re: Starting new 36" build

Dennis

I was off right next to arch and removed one brick on the left to correct. You are well above the arch now and IMO, i would stay the course at this point and correct from here up. I you custom cut the next course and correct here, the rest will be straight again and i dont think will weaken the dome or be visibly noticeable where you correct that high in the dome.

But, hey, i am on course 5 and redoing some of my problems i decided i cant live with because i dont want to fight them the rest of the way up the dome either and i dont want to look at every time i look in the dome. I have about 3/8" to correct from one side of dome to next. Some of that off level can be from bricks being slighty longer/or shorter than 1/2. The upper edge will fluctuate where as the lower/inner edge is the true place to check level. Mine is from not mixing mortar consistent to hold and not using the IT correctly. You gotta believe the thing. But i am on the 5th course, so i decided to correct as i go(i hope) I am not intimidated about removing bricks anymore, i just want to do it sooner than later, and get better so i dont need to. Best of luck and your build looks great.

Tracy
__________________
My Progress:

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #70  
Old 05-11-2012, 11:28 AM
texman's Avatar
Master Builder
 
Join Date: Nov 2009
Location: Amarillo, Texas
Posts: 587
Default Re: Starting new 36" build

amac
Once again, you have the best eyes out there. I am sure the rest is ok too.
__________________
My Progress:

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Just starting my build WoodchuckDad Introductions 25 04-16-2010 05:28 PM
Matt's WFO Build mluttropp Pompeii Oven Construction 74 11-22-2009 03:27 PM
Newbie starting small oven build David D Introductions 17 11-13-2009 01:37 AM
Starting the build on Monday!! Ellie Pompeii Oven Construction 5 01-18-2009 02:51 PM
Starting My Oven Build: Couple of Questions tomtom Newbie Forum 7 11-29-2008 01:15 PM


All times are GMT -7. The time now is 03:01 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC