| Pizza Ovens | (800) 407-5119 | Info@fornobravo.com |
![]() |
| | |||||||
| | LinkBack | Thread Tools | Display Modes |
| |||
| I just used a scrap piece of 1x6 cut to length and held up to the underside with a couple of scrap 2 x 4 "legs". nothing fancy required. After it sets, knock out the 2x4s and the 1 x 6 dropps to the ground.........your done. RT |
| ||||
| I did the exact same thing (other than being a 2x6 - old decking) Les...
__________________ Check out my pictures here: http://www.fornobravo.com/forum/phot...ndex.php?u=152 |
| ||||
| OK, after a goofing off a little, I'm back at it. I hope to pour the hearth this weekend. I'm still debating the thermocouples. For those that ran some copper tubing in the floor to create a void in the concrete for future thermocouples, what size did you use? |
| ||||
| Found some time this weekend to forge ahead. I was able to frame up and pour the hearth. I used the redimix bags of concrete this time, 30 bags (60 lbs) didn't justify calling in the truck. 3 guys mixed and poured it in 1.5 hours. |