Default Cold weather masonry

I'm reading that masonry doesn't hydrate under 40 degrees f. Does that mean that I'm through for the season? It was down to 31 degrees last night, although it's warmer than that during the day.

Any words of experience from masons would be appreciated.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #2  
Old 11-04-2006, 03:41 PM
Les's Avatar
Les Les is offline
Master Builder
 
Join Date: Sep 2005
Location: Carson City, NV
Posts: 898
Default Keep it covered

I poured my foundation last weekend. It got down to 19 deg F. I put tarps over it and a bunch of blankets. I also slipped a thermometer under the tarp - the next morning, at daybreak, it was reading 44 deg. Your situation is a bit different, mine was a simple flat pour.

Les...
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #3  
Old 11-04-2006, 05:57 PM
christo's Avatar
Master Builder
 
Join Date: Feb 2006
Location: Eastern NC
Posts: 626
Default cold weather masonry link

http://www.maconline.org/tech/constr...ld1/cold1.html

From this it sounds like we can still work for a while....

Christo
__________________
My oven progress -

To view links or images in signatures your post count must be 5 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 5 or greater. You currently have 0 posts.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #4  
Old 11-04-2006, 08:00 PM
CanuckJim's Avatar
Il Pizzaiolo
 
Join Date: Jan 2006
Location: Prince Albert, Ontario, Canada
Posts: 1,377
Default Cold Weather Masonry

Dmun,

I'd be careful with low temperatures. Hydration is one thing, but set and cure are two others. No matter what, you'll need 28 days for a full cure. There are accelerants out there that will speed the set, but strength will be affected. If the mortar freezes before setting, it will effloresce and be weakened, sometimes leading to cracking--and spalling over time.

If you must continue, add a small amount of accelerant to your mortar, keep your materials dry and warm, use warm water (72 F), invest in an insulated tarp (usually white) and use some sort of heat source under it (lights, for example) to keep the temp above 40F--50 would be better.

I know it's tempting to keep going, but the risks probably are not worth it. As a mason, I can tell you that I would never buy a house bricked in winter, no matter how well the site was protected.

In my estimation, the risk factor outweighs the benefits. You need strength in your mortar because of the stresses it will undergo from heat. Mixing mortar in less than ideal conditions would put enough doubt in my mind so I simply wouldn't do it. Mortaring up brick veneer on a building is not the same as building a brick oven.

Jim
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #5  
Old 11-04-2006, 08:02 PM
dmun's Avatar
Moderator
 
Join Date: Jul 2005
Location: New Jersey USA
Posts: 1,788
Default

From that link it seems like mean daily temperature that counts, and I should be OK this month, longer if I take the building materials inside (easier to work with, too)

Here's the link for mean monthly temperatures for various US cities.

http://www.ncdc.noaa.gov/oa/climate/.../meantemp.html
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #6  
Old 11-05-2006, 02:55 AM
Les's Avatar
Les Les is offline
Master Builder
 
Join Date: Sep 2005
Location: Carson City, NV
Posts: 898
Default Good to go with Caution?

Jim,
You are not insinuating that it takes 28 days above freezing for a masonry project to cure are you? If that were the case, New York City would still be dirt and trees. I poured my driveway in February many years ago and it hasn’t cracked a bit (and it was friggen cold). All I had to do is keep it covered for a few days. Concrete generates its own heat – you just need to retain it for a cure. There are many masonry projects that can be done in a somewhat cold environment. Obviously the temps need to be above freezing before you begin.
With that said – you do live in Canada and I’m sure you see more extremes than the lower 48 would ever see (or Nevada ).

Just my 2 cents,

Les…
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #7  
Old 11-05-2006, 01:34 PM
CanuckJim's Avatar
Il Pizzaiolo
 
Join Date: Jan 2006
Location: Prince Albert, Ontario, Canada
Posts: 1,377
Default Curing

Les,

Nope, wasn't insinuating any such thing. Curing is mainly chemical, once the cement has set and the green stage hydration has been driven off by the heat generated.

I once met a man in Palm Springs who had that "Canadians ski in July" attitude. He was from North Dakota. When I told him I lived to the south of his location, he refused to believe me. Produced a map and won a fifty buck bet on that one. Even so, here we do get wide temperature swings, occasionally as much as 40 F in one day.

Really, I don't want to get into a technical analysis of how cold weather affects mortar. I've used an awful lot of it, cold weather and warm. Under the pressures of commercial work, it does happen that things are built in freezing conditions. What I was trying to say is that freezing weather linked to mortar is chancy at best, and for an oven you want the strongest possible mortar.

That's all.

Jim
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT. The time now is 09:05 AM.

Home | About Us | Our Suppliers | Dealers | Press and News | Contact Us | FAQ | Forno Bravo UK
Residential Pizza Ovens | Commercial Pizza Ovens | Catering Pizza Ovens | Pizza Oven Accessories | Pizza Peels | Outdoor Fireplaces
Select | Justify | Order | Install | Manage | Make Pizza | Roast, Bake and Grill
Pompeii Brick Oven | Firenze Concept Oven | Links | Cookbooks | Vera Pizza Napoletana | Pizza Oven Photos
Commercial Pizza Oven Selector | Outdoor Kitchen Design | Site Map | Forum

© 2006 Forno Bravo, LLC Italian Pizza Ovens

No part of this website or content thereof may be reproduced, distributed or transmitted in any form or by any means, nor may any part of this website be stored in a database or other electronic retrieval system, or any other website, without the prior written permission of Forno Bravo, LLC.


Powered by vBulletin® Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.2.0
© 2006 Forno Bravo, LLC

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33