Below very bottom of this post was my first ever post. Throughout my WFO build the thread got quite large. My aim with this build was to document it thoroughly with detailed and copious numbers of photos. To make it easier I have included an index to assist those viewing this thread.


Build Index

Base Slab Construction post 24

Base Slab Construction post 32/33

Hebel Block and Panel Base Stand and Build Templates and working out position post 41/42/43/46

Cutting and laying Calsil, Hearth Bricks and First Course post 55

Dome finish examples, Arch Template, Entry Arch IT Base and Entry Arch Brick Combination Post 74/77

Brick Saw Compound Mitre Brick Tray post 107/108/131/134/145

Cutting the hearth Post 151/155 and Post 175

Setting up Calsil, Hearth on Base, Dome arch Brick Order Post 184 and Post 191

Setting up arch, IT, Dome templates Post 206/207 and First course started Post 212 and Hearth First Course completed Post 229

Dome and Entry Arch Construction to Course 6 Post 237 , Post 241 , Post 256/257, Post 280/281/287, Post 312/314/318/319, Post 324/327/328

Transition courses 6 to 8 Post 350, Post 351/352, Post 362/363, Post 374/375/380, Post 383, Post 392/399/400

Working out Flared Arch and Landing and Completing Landing Post 432/433/434/435 , , Post 464

Completion of Dome Course 8 to plug Post 453/454/458/459, Post 470 and Post 471/472/477/479, Post 496, Post 505, Post 544

Plugging the baby up with a little decoration Post 572, Post 610
__________________________________________________ ___________________________________________
Hi all.
After researching this site for most of this year, since my son suggested I build an oven, I have pretty much decided to proceed with the build. So much so that I got out my circular saw measured the area to cut out in my deck and proceeded to cut it out. Engineering of the slab will be tricky as I have 2 bearers 1170 apart. I cannot cut these out so have to construct a 1250 * 1400 slab cantilevered over the bearers and deck to get the width.


I have a friend that is a fitter and turner who has fabricated an IT and I have acquired a brick saw (brand new 16") for $200 but without a brick tray. Same friend is going to fabricate one for me hopefully a compound mitre tray.

I wish to thank benguilford for the advice he has provided so far with a couple of calls I have made. Also to the rest of you that have provided all the valuable information you have on this site. I will post some photos and build ideas soon. Planning a 1metre oven dome, in a Japanese style garden.

vanoontour 08-20-2012 03:30 PM

Re: new build in werribee
 
Mate, where abouts in Werribee, I'm building a 40" corner in Manor Lakes.

vanoontour 08-20-2012 07:15 PM

Re: new build in werribee
 
...and if you want some rebar/reo mesh I have some left over.

oasiscdm 08-20-2012 11:56 PM

Re: new build in werribee
 
I live about a kilometer west from the plaza. In a street of the back of Bethany primary school. I was going to do a 42" but have settled on the same size as you 40". Might take you up on that if you don't need it. Where are you up to with your build?

Cheers Colin

oasiscdm 08-21-2012 03:47 AM

Re: new build in werribee
 
4 Attachment(s)
Here are photos of the site, IT and the garden. Oh and the first stage cut out the deck. I have to construct a blue board wall behind the oven before forming the slab. Not sure if I will pour the slab in one or two pours as I need to cantilever it over the deck. Getting the form work out will be impossible if poured in one go.

oasiscdm 08-21-2012 03:54 AM

Re: new build in werribee
 
Thanks vanaantour. I live in a street behind Bethany primary school about 1.5km from the plaza, near the river. Thank you for the offer of the rebar etc if you have no need be happy up on your offer. How far advanced are you with your build?

Mine will take a while but hoping to have it finished around April next year.

Cheers Colin

oasiscdm 08-21-2012 03:57 AM

Re: new build in werribee
 
Sorry vanoontour correct spelling now.

oasiscdm 08-21-2012 04:15 AM

Re: new build in werribee
 
My intentions with the build are to 1metre Pompeii oven
Purchase oven materials from Melbourne Fire Brick Company. Ben has been of great help.

Once slab is constructed 1100*1400

I Will be building a Hebel block base frame
On top of that a cantilevered Hebel power fence panel (double reinforced) 1400*1600 hearth. With steel lintel and frame to support the cantilevered hearth.

50 mm calcium silicate board
65 mm fire brick tiles

The base will be constructed so that the oven effectively sits on top of the base walls i.e. the oven walls are on top of the base walls. Insulation and rendered finish will be outside the base walls.

Be interested to know if I have missed anything?

oasiscdm 08-21-2012 04:19 AM

Re: new build in werribee
 
One adjustment to previous post. The slab will be cantilevered above the deck. The dimensions above are for the bottom of the slab. The base will be 1400*1400. Concrete will be 50 mm above the deck and 125 mm thick. Will post some drawings later.

Colin

Bacterium 08-21-2012 04:25 AM

Re: new build in werribee
 
welcome oasiscdm

sounds like the base might be tight, then again post some pics so we get a better idea.

insulation under the floor is a good start :)


All times are GMT -7. The time now is 10:07 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC